CHAPTER Env-Wq 2000 COASTAL PROGRAM GRANT RULES
REVISION NOTE:
Effective
July 1, 2004, Chapter 257:20 of the Laws of 2004 transferred Pln 900 Coastal
Program Grant Rules from the Office of Energy and Planning, formerly the Office
of State Planning and Energy Programs, to the Department of Environmental
Services (Department). The Department
subsequently filed Env-Ws 2000 in Document #8411, effective 8-19-05 which made
extensive changes to the numbering, wording, and format of Pln 900 and
supersedes all prior filings for Pln 900.
The prior filings affecting rules in Pln 900 include the following:
|
#4526, eff 11-3-88 |
|
#5010, eff 11-27-90 |
|
#5509, eff 11-25-92 |
|
#6430, eff 1-18-97 |
|
#6610, eff 10-22-97 |
|
#7992, eff 12-1-03 |
This chapter was
subsequently redesignated editorially as Env-Wq 2000
pursuant to a rules reorganization plan for Department rules approved by the
Director of the Office of Legislative Services on 9-7-05.
PART Env-Wq 2001
PURPOSE AND APPLICABILITY
Env-Wq
2001.01 Purpose. The purpose of these rules is to establish
the procedures for applying for coastal program grants and the criteria for
evaluating the applications.
Source. (See Revision Note at chapter heading for Env-Wq
2000) #8411, eff 8-19-05; ss by #9570, eff 10-17-09
Env-Wq
2001.02 Applicability. These rules shall apply to any applicant for
funding under the coastal program.
Source. (See Revision Note at chapter heading for Env-Wq
2000) #8411, eff 8-19-05; ss by #9570, eff 10-17-09
PART Env-Wq 2002
DEFINITIONS
Env-Wq
2002.01 “Coastal zone” means the
geographic boundary of the
Source. (See Revision Note at chapter heading for Env-Wq
2000) #8411, eff 8-19-05; ss by #9570, eff 10-17-09 (from Env-Wq 2002.03)
Env-Wq
2002.02 “Department” means the
department of environmental services.
Source. (See Revision Note at chapter heading for Env-Wq
2000) #8411, eff 8-19-05; ss by #9570, eff 10-17-09 (from Env-Wq 2002.04)
Env-Wq
2002.03 “Grant cycle” means one round of
applications for funding.
Source. (See Revision Note at chapter heading for Env-Wq
2000) #8411, eff 8-19-05; ss by #9570, eff 10-17-09 (from Env-Wq 2002.05)
Env-Wq
2002.04 “New Hampshire coastal program
(NHCP)” means New Hampshire’s coastal management program approved by NOAA under
the federal Coastal Zone Management Act (CZMA), 16 U.S.C. §§1451-1465, to
enhance overall coastal resource management.
Source. (See Revision Note at chapter heading for Env-Wq
2000) #8411, eff 8-19-05; ss by #9570, eff 10-17-09
Env-Wq
2002.05 “Office of Ocean and Coastal
Resource Management (OCRM)” means the federal office within the NOAA National
Ocean Service that interprets the CZMA.
Source. (See Revision Note at chapter heading for Env-Wq
2000) #8411, eff 8-19-05; ss by #9570, eff 10-17-09 (from Env-Wq 2002.06)
Env-Wq
2002.06 “Practicable" means
available and capable of being done after taking into consideration cost,
existing technology, and logistics in light of overall
project purposes.
Source. (See Revision Note at chapter heading for Env-Wq
2000) #8411, eff 8-19-05; ss by #9570, eff 10-17-09
Env-Wq
2002.07 “Section 306A project checklist”
means the document provided by the OCRM as part of its construction and
acquisition requirements to be used in the coastal grant program.
Source. (See Revision Note at chapter heading for Env-Wq
2000) #8411, eff 8-19-05; ss by #9570, eff 10-17-09
PART Env-Wq 2003
LIMITATIONS ON GRANT DISTRIBUTION
Env-Wq
2003.01 Allocation to Coastal States. In accordance with the CZMA, funds are
appropriated annually by Congress to OCRM to distribute to coastal states with
approved management programs. This
chapter shall apply only to that portion of the
Source. (See Revision Note at chapter heading for Env-Wq
2000) #8411, eff 8-19-05; ss by #9570, eff 10-17-09
Env-Wq 2003.02 Funding Limits.
(a) A maximum of $50,000 financial assistance
shall be awarded to any applicant in any grant cycle.
(b) Each applicant shall submit no more than one
application in any grant cycle.
(c) Applications submitted by departments or
divisions within a larger governmental or educational entity shall be
considered as separate applications.
However, no single governmental or educational entity shall receive more
than 50% of the total available grant funds per grant cycle.
Source. (See Revision Note at chapter heading for Env-Wq
2000) #8411, eff 8-19-05; ss by #9570, eff 10-17-09
Env-Wq
2003.03 Matching Fund Requirements. Grantees shall provide a non-federal funding
match which, at a minimum, equals the grant request, either with cash or
in-kind services, unless at the time of the grant request the federal matching
requirement has been met.
Source. (See Revision Note at chapter heading for Env-Wq
2000) #8411, eff 8-19-05; ss by #9570, eff 10-17-09
Env-Wq
2003.04 Eligible Applicants. The following entities shall be eligible to
apply for a grant under this chapter:
(a) Any municipality, school district, regional
planning agency (RPA), or county government within or partially within the
state’s coastal zone;
(b) Academic institutions of higher education or
individual departments thereof;
(c) Any state agency; or
(d) Any tax exempt, non-profit organization as
certified by the United States Internal Revenue Service.
Source. (See Revision Note at chapter heading for Env-Wq
2000) #8411, eff 8-19-05; ss by #9570, eff 10-17-09
PART Env-Wq 2004
GRANT APPLICATION PROCESS
Env-Wq
2004.01 Formal Procedure. Applicants shall apply for coastal program
funds through a formal application procedure.
Project applications shall contain the information required in either
Env-Wq 2004.04 or Env-Wq 2004.06,as appropriate, in order to
be considered for selection.
Source. (See Revision Note at chapter heading for Env-Wq
2000) #8411, eff 8-19-05; ss by #9570, eff 10-17-09
Env-Wq
2004.02 Hearing Requirement for
Municipalities. If required by RSA 31:95-b, a municipal applicant
shall conduct a public hearing in accordance with that section. If a hearing is held, the municipality shall
provide written minutes of the hearing or town meeting in the application
materials.
Source. (See Revision Note at chapter heading for Env-Wq
2000) #8411, eff 8-19-05; ss by #9570, eff 10-17-09
Env-Wq 2004.03 Planning/Management Grants.
(a) Eligible planning or management activities
shall include the following:
(1) Preliminary
engineering reports and construction cost estimates;
(2) Feasibility
studies;
(3) Ordinance
development;
(4) Hydrologic
studies;
(5) Resource
planning and management studies;
(6) Mapping of
natural resources and land use;
(7) Invasive
species control;
(8) Resource
monitoring, research, and evaluation; and
(9) Education
and outreach.
(b) In order to be eligible for a
planning/management grant, projects shall meet each of the following minimum
requirements:
(1)
Projects shall be located
within the coastal zone, or outside the coastal zone when shown to directly
affect the coastal zone; and
(2) Projects
shall not be dependent upon the need to complete other related work for which
there is no certainty of completion.
Source. (See Revision Note at chapter heading for Env-Wq
2000) #8411, eff 8-19-05; ss by #9570, eff 10-17-09
Env-Wq 2004.04 Planning/Management Grant Applications. The applicant for a planning/ management
grant shall provide the following:
(a) A concise narrative statement which
describes:
(1) The
proposed activity;
(2) Whether it
is a stand alone project or part of a larger project;
(3) Why the project is necessary; and
(4) What the
outcome of the project will be;
(b) A map with the project location clearly
delineated;
(c) A schedule containing estimated dates for the
completion of specific project tasks;
(d) A budget that:
(1) Details all costs and sources of
funding associated with proposed project activities, as well as a description
of the source(s) of funding for the matching share; and
(2) Complies
with the following:
a. Not more
than 35% of total project costs shall be allowed as overhead or indirect costs;
and
b. Budgeted
amounts for volunteer services, if used as match, shall be detailed; and
(e) A description of how the proposal addresses
or does not address each of the selection criteria specified in Env-Wq 2006.03
through Env-Wq 2006.11.
Source. (See Revision Note at chapter heading for Env-Wq
2000) #8411, eff 8-19-05; ss by #9570, eff 10-17-09
Env-Wq 2004.05 Construction/Acquisition Grants.
(a) Construction, acquisition, and other projects
shall include the following:
(1) Acquisition
of interests in land, including but not limited to the fee, an easement, or a
right-of-way;
(2)
Construction projects;
(3) Habitat
restoration;
(4) Shoreline
rehabilitation and modification to increase or improve public access;
(5) Final
engineering designs or specifications; and
(6)
Educational, interpretive, and management activities.
(b) In order to be eligible for
construction/acquisition grants, projects shall meet each of the minimum
requirements for planning/management applications contained in Env-Wq
2004.03(b), and each of the following requirements, as applicable to the
project:
(1) Completed
projects shall be accessible for use by the general public,
including persons with disabilities;
(2)
Construction projects shall be sited on public land, leased land, or
land for which an easement has been obtained; and
(3) An easement
or lease shall be for the life of the constructed project.
Source. (See Revision Note at chapter heading for Env-Wq
2000) #8411, eff 8-19-05; ss by #9570, eff 10-17-09
Env-Wq 2004.06 Construction/Acquisition Grant
Applications. The applicant for a
construction/ acquisition grant shall provide the following:
(a) A concise narrative statement which
describes:
(1) Each
activity proposed as part of the project;
(2) Whether it
is a stand alone project or is part of a larger
project;
(3) The
location of the project;
(4) Materials
to be used;
(5) Why the project is necessary; and
(6) What the
end outcome of the project will be;
(b) A map with the exact project location and its
relationship to other surrounding features clearly delineated;
(c) A detailed site plan showing the relationship
of the project to other facilities and significant natural features, including
but not limited to slope, access points, wetlands, and dunes;
(d) If the project is a public access project, a
description of the signage proposed to identify its availability to the public;
(e) A schedule containing estimated dates for the
completion of specific project tasks;
(f) A budget that:
(1) Details all
costs and sources of funding associated with proposed project activities, as
well as a description of source of funding for the
matching share; and
(2) Complies
with the following:
a. Not more
than 35% of total project costs shall be allowed as overhead or indirect costs;
and
b. Budgeted
amounts for volunteer services, if used as match, shall be detailed;
(g) For projects where the architectural and
engineering plans are final, a statement as to the source of funds for the
subsequent construction project;
(h) A title opinion, certification, affidavit, or
title insurance showing public ownership or control of land for projects
involving acquisition or construction, signed by a licensed attorney or
authorized state or local government official;
(i) A section 306A project checklist to provide
detailed information on potential environmental impacts;
(j) For construction projects, a letter from the
state historic preservation officer clearing the project for historic
preservation purposes;
(k) A list of all necessary local, state, and
federal permits or a statement on the section 306A project checklist that no
permits are needed for the proposed project; and
(l) A description of how the proposal addresses
or does not address each of the selection criteria specified in Env-Wq 2006.03
through Env-Wq 2006.11.
Source. (See Revision Note at chapter heading for Env-Wq
2000) #8411, eff 8-19-05; ss by #9570, eff 10-17-09
Env-Wq
2004.07 Multi-Phase Projects.
(a) Multi-phase projects shall be eligible for
funding under this program, provided they meet all other requirements of these
rules.
(b) The award of a grant for one phase of a
multi-phase project shall not guarantee that subsequent phases will be
funded.
(c) Each phase of a project shall be:
(1) Completed
within one grant cycle; and
(2) Able to
stand alone as a project.
Source. (See Revision Note at chapter heading for Env-Wq
2000) #8411, eff 8-19-05; ss by #9570, eff 10-17-09
Env-Wq 2004.08 Ineligible Activities. The following activities shall not be
eligible for funding through the NHCP:
(a) Activities that do not fall within the
coastal zone, except as provided for in Env-Wq 2004.03(b)(1);
(b) Activities that are planned for
privately-owned land, except those which will be on privately-owned land with
public control through easement, right-of-way, or long-term lease; and
(c) Activities that otherwise are ineligible
under CZMA statutes and OCRM rules.
Source. (See Revision Note at chapter heading for Env-Wq
2000) #8411, eff 8-19-05; ss by #9570, eff 10-17-09
PART Env-Wq 2005
PROCEDURES FOR ADMINISTRATION OF FUNDS BY GRANTEE
Env-Wq
2005.01 Documentation.
(a) Grantees shall document all project activity
costs and associated costs.
(b) Documentation shall be available for review
by the department or OCRM.
(c) Grantees shall retain documentation for a
period of 3 years after project completion for audit purposes.
Source. (See Revision Note at chapter heading for Env-Wq
2000) #8411, eff 8-19-05; ss by #9570, eff 10-17-09
Env-Wq
2005.02 Compliance By Grantee With
All Applicable Requirements. In
performance of the project activities, the grantee shall comply, and require
each contractor and sub-contractor to comply with:
(a) All statutes and rules governing the
administration of the NHCP;
(b) All applicable requirements of any federal,
state, county, or municipal authorities; and
(c) Any lawful directive of any public officer
relative to the performance of project activities.
Source. (See Revision Note at chapter heading for Env-Wq
2000) #8411, eff 8-19-05; ss by #9570, eff 10-17-09
PART Env-Wq 2006
CRITERIA AND PROCEDURES FOR EVALUATING & APPROVING APPLICATIONS
Env-Wq
2006.01 Phase 1: Evaluating
Applications Before Selection Process Begins.
(a) The department shall review each project
application to determine whether the application meets the minimum requirements
specified in Env-Wq 2004.03 or Env-Wq 2004.05.
(b) If the application meets the minimum
requirements, the department shall score the application as specified in Env-Wq
2006.02.
(c) If the application does not meet the minimum
requirements, the department shall notify the applicant that the application
has been rejected.
Source. (See Revision Note at chapter heading for Env-Wq
2000) #8411, eff 8-19-05; ss by #9570, eff 10-17-09
Env-Wq 2006.02 Phase
2: Project Selection Process.
(a) Each application that meets the eligibility
requirements shall be evaluated and scored based on the criteria contained in
Env-Wq 2006.03 through Env-Wq 2006.11.
(b) Eligible activities as identified in Env-Wq
2004.03 or Env-Wq 2004.05 shall be evaluated on the basis of
the likely impact of the proposed project as if it had been implemented.
(c) A minimum score of 26 points shall be
required for the NHCP to recommend the project to OCRM for final approval.
Source. (See Revision Note at chapter heading for Env-Wq
2000) #8411, eff 8-19-05;
ss by #9570, eff 10-17-09
Env-Wq
2006.03 Scoring Based on Benefits to
Focus Area.
(a) Each application shall be scored based on the
anticipated benefit of the proposed project in one of the following NHCP
project focus areas:
(1) Restoration
of coastal habitats;
(2) Water
quality and stormwater management;
(3) Land
conservation;
(4) Climate
change adaptation and coastal hazards; or
(5) Ocean and
estuarine resources.
(b) The NHCP shall determine whether a project:
(1) Directly
addresses one of the 5 focus areas set forth in (a), above, and, if so, whether
the project directly qualifies as a high or medium priority project based on the
criteria set forth in (c) and (d), below;
(2) Indirectly
addresses one of the 5 focus areas set forth in (a), above; or
(3) Does not
directly or indirectly address one of the 5 focus areas set forth in (a),
above, but is otherwise eligible for funding pursuant to Env-Wq 2004.03 through
2004.08.
(c) The following types of projects that directly
address one of the 5 focus areas shall qualify as high priority projects and
receive 10 points:
(1) Restoration
projects that:
a. Result in
restoration of tidal and non-tidal coastal habitats, including,
rivers, streams, and floodplains; or
b. Facilitate
the control of invasive species;
(2) Water
quality and stormwater management projects that:
a. Implement
low impact development technologies and practices;
b. Create and
promulgate water quality and stormwater ordinances; or
c. Monitor the
effectiveness of water quality enhancement activities;
(3) Land
conservation projects that:
a. Conserve
coastal lands, including but not limited to buffers around tidal waters,
tributary rivers, and tributary streams;
b. Protect
floodplains;
c. Provide or
increase public access to coastal resources; or
d. Conserve
unique natural areas and habitats;
(4) Projects
that promote climate change adaptation and mitigation of coastal hazards by:
a. Planning and
modeling for sea level rise;
b. Implementing
actions to protect coastal infrastructure and resources; or
c. Promulgating
local regulations; or
(5) Projects
that protect ocean and estuarine resources, including but not limited to:
a. Renewable energy siting research projects;
b. Dredged
material management projects;
c. Development
of offshore data sources such as bathymetry, benthic habitat and human uses;
and
d. Projects
that implement innovative or regional approaches to offshore issues.
(d) The following types of projects that directly
address one of the 5 focus areas shall qualify as medium priority projects and
receive 6 points:
(1) Feasibility
studies, monitoring activities, and outreach associated with coastal habitat
restoration;
(2) Research,
ambient water quality monitoring, and outreach about the importance of good
water quality;
(3) Land
conservation outreach, planning, and stewardship;
(4) Research
and outreach pertaining to climate change adaptation and coastal hazards; or
(5) Marine
debris removal and prevention, and outreach on ocean and estuarine resources.
(e) A project that indirectly addresses one of
the 5 focus areas shall receive 4 points.
(f) A project that does not directly or
indirectly address one of the 5 focus areas but is otherwise eligible for
funding pursuant to Env-Wq 2004.03 through Env-Wq 2004.08 shall receive 2
points.
Source. (See Revision Note at chapter heading for Env-Wq
2000) #8411, eff 8-19-05;
ss by #9570, eff 10-17-09
Env-Wq
2006.04 Scoring Based on Completeness
and Clarity. Each application shall
be scored on its completeness and clarity as follows:
(a) An application shall be scored on its
executive summary as follows:
(1) An
application that includes a clear and descriptive executive summary shall
receive one point; and
(2) An
application that fails to include a clear and descriptive executive summary
shall receive no points;
(b) An application shall be scored on how well it
describes the purpose, objectives, and need for the
proposed project as follows:
(1) An
application in which the purpose, objectives, and need for the proposed project
are clearly presented and which demonstrates direct applicability to NHCP focus
areas shall receive 4 points;
(2) An
application in which the purpose, objectives, and need for the proposed project
are not clearly described or which
demonstrates indirect applicability to NHCP focus areas shall receive 2
points; and
(3) An
application in which the purpose, objectives and need for the proposed project
are not clearly presented or which demonstrates no applicability to NHCP focus
areas shall receive no points;
(c) An application shall be scored on how well it
describes project tasks as follows:
(1) An
application in which project tasks are practicable and clearly described, and
which identifies who will complete each portion of the proposed work, shall receive
2 points; and
(2) An
application in which project tasks are not practicable, or clearly described,
or which does not identify who will complete each portion of the proposed work,
shall receive no points;
(d) An application shall be scored on its
inclusion of a project schedule as follows:
(1) An
application that includes a clear implementation plan with dates for completion
of project milestones that are achievable within the allotted time period shall receive 2 points; and
(2) An
application that does not include a clear implementation plan with dates for
completion of project milestones that are achievable within the allotted time period shall receive no points;
(e) An application shall be scored on its
inclusion of a budget and matching fund justification as follows:
(1) An
application in which the budget and matching fund justification are complete
and practicable based on the stated objectives, tasks, and time frame shall
receive 3 points; and
(2) An
application in which the budget and matching fund justification are not
complete and practicable based on the stated objectives, tasks, and time frames
shall receive no points;
(f) An application shall be scored on how well it
describes anticipated project outcomes as follows:
(1) An
application that describes specific, tangible results that are consistent with
the project objectives shall receive 3 points; and
(2) An
application that does not describe specific, tangible results that are
consistent with the project objectives shall receive no points;
(g) An application shall be scored on how well it
measures success as follows:
(1) An
application that includes an assessment strategy that will effectively measure
results and completion of the project objectives shall receive 2 points; and
(2) An
application that does not include an assessment strategy that will effectively
measure results and completion of the project objectives shall receive no
points; and
(h) An application shall be scored on its
inclusion of all submission requirements as follows:
(1) An
application that includes all application submission requirements set forth in
Env-Wq 2004.04 or Env-Wq 2004.06,as applicable, shall receive 2 points; and
(2) An
application that does not include all application submission requirements set
forth in Env-Wq 2004.04 or Env-Wq 2004.06, as applicable, shall receive no
points.
Source. #9570, eff 10-17-09
Env-Wq
2006.05 Scoring Based on Consistency
with Needs. Each application shall
be scored on the project’s consistency with the needs identified in federal,
state, regional, or local plans or studies as follows:
(a) A project need that is specifically
identified by one or more federal, state, regional, or local plans or studies
shall receive 3 points;
(b) A project need that is generally supported in
concept by 2 or more federal, state, regional, or local plans or studies shall
receive 2 points;
(c) A project need that is generally supported in
concept by one federal, state, regional, or local plan or study shall receive
one point; and
(d) A project that has no documented need shall
receive no points.
Source. #9570, eff 10-17-09
Env-Wq
2006.06 Scoring Based on Volunteer
Involvement. Each application shall
be scored on the project’s inclusion of volunteer involvement as follows:
(a) A project in which volunteers will contribute
more than 50 percent of the time and effort for the project shall receive 2
points;
(b) A project in which volunteers will contribute
some but less than 50 percent of the time and effort for the project shall
receive one point; and
(c) A project in which there is no volunteer
involvement shall receive no points.
Source. #9570, eff 10-17-09
Env-Wq
2006.07 Scoring Based on Increase in
Understanding. Each application
shall be scored on how the project will increase the understanding of coastal
issues and lead to behavior change that will positively impact the coast as
follows:
(a) A project in which the primary purpose is
outreach and education, with clearly defined target audiences and strategies to
reach those audiences, and that incorporates direct hands-on outreach and
education, such as trainings, field events, and
workshops, shall receive 3 points;
(b) A project with clearly defined target
audiences and strategies to reach those audiences, that incorporates indirect
outreach and education, such as brochures, Internet materials and web sites,
mass media campaigns, and interpretive kiosks and/or signage, shall receive 2
points;
(c) A project that does not define target
audiences and outreach strategies, but incorporates an indirect education and
outreach component shall receive one point; and
(d) A project that does not incorporate an
outreach and education component shall receive no points.
Source. #9570, eff 10-17-09
Env-Wq
2006.08 Scoring Based on
Opportunities for Cooperation. Each
application shall be scored on whether the project will improve opportunities
for multi-entity cooperation on coastal resource planning and management
efforts as follows:
(a) A project that involves cooperation between 4
or more coastal stakeholders, where stakeholders are identified as any entity
that is eligible to receive grant funding pursuant to Env-Wq 2003.04, shall
receive 3 points;
(b) A project that involves cooperation between 2
or 3 coastal stakeholders shall receive 2 points; and
(c) A project that does not involve multi-entity
cooperation shall receive no points.
Source. #9570, eff 10-17-09
Env-Wq
2006.09 Scoring Based on Receipt of
Prior Grants and Past Performance.
(a) Each application shall be scored on whether
the applicant is a new applicant to the NHCP as follows:
(1) A project
proposed by an applicant that has not received NHCP grant funding in the 10
years immediately prior to the current grant round shall receive 4 points; and
(2) A project
proposed by an applicant that has received NHCP grant funding in the 10 years
immediately prior to the current grant round shall receive no points.
(b) For projects proposed by applicants who have
received NHCP funding in the 10 years immediately prior to the current grant
round, the application shall be scored on the previous performance of the
applicant as follows:
(1) A project
shall receive 4 points if all the following apply:
a. Work
products were complete and finished on time;
b. Interim
reports were clear and descriptive and submitted on time; and
c. Invoices
were submitted on time and were error-free;
(2) A project
shall receive 2 points if one of the following circumstances occurred:
a. Work
products were complete but finished late;
b. Interim
reports were not clear and descriptive or were submitted late; or
c. Invoices
were submitted late or contained multiple errors;
(3) A project
shall receive one point if 2 of the following circumstances occurred:
a. Work
products were incomplete or finished late;
b. Interim
reports were not clear and descriptive or were submitted late; or
c. Invoices
were submitted late or contained multiple errors; and
(4) A project
shall receive no points if all of the following
circumstances occurred:
a. Work
products were incomplete or finished late;
b. Interim
reports were not clear and descriptive or were submitted late; and
c. Invoices
were submitted late or contained multiple errors.
Source. #9570, eff 10-17-09
Env-Wq
2006.10 Scoring Based on Support for
the Project. Each application shall
be scored on whether the project has documented support, as follows:
(a) To receive 3 points, a project shall be
supported by 3 affected communities, groups, or organizations submitting a
letter that:
(1)
Specifically identifies the proposed project;
and
(2) Is dated
within one year prior to the grant application;
(b) To receive 2 points, a project shall be
supported by 2 affected communities, groups, or organizations submitting a
letter that:
(1)
Specifically identifies the proposed project;
and
(2) Is dated
within one year prior to the grant application;
(c) To receive one point, a project shall be
supported by one affected community, group, or organization submitting a letter
that:
(1)
Specifically identifies the proposed project;
and
(2) Is dated
within one year prior to the grant application; and
(d) A project that does not qualify for points
under (1), (2), or (3), above, shall receive no points.
Source. #9570, eff 10-17-09
Env-Wq
2006.11 Scoring Based on Excess Match. Each project shall be scored on its inclusion
of matching funds or in-kind services in excess of the
required match amount, as follows:
(a) A project for which the applicant will
provide $50,000 or more in excess non-federal matching funds shall receive 6
points;
(b) A project for which the applicant will
provide at least $40,000 but less than $50,000 in excess non-federal matching
funds shall receive 5 points;
(c) A project for which the applicant will
provide at least $30,000 but less than $40,000 in excess non-federal matching
funds shall receive 4 points;
(d) A project for which the applicant will
provide at least $20,000, but less than $30,000 in excess non-federal matching
funds shall receive 3 points;
(e) A project for which the applicant will
provide at least $10,000, but less than $20,000 in excess non-federal matching
funds shall receive 2 points;
(f) A project for which the applicant will
provide at least $5,000 but less than $10,000
in excess non-federal matching funds shall receive one point; and
(g) A project for which the applicant will
provide less than $5,000 in excess non-federal matching funds shall receive no
points.
Source. #9570, eff 10-17-09
Env-Wq
2006.12 Phase 3: Recommendation to
OCRM.
(a) After all eligible projects have been scored,
the department shall recommend those projects which best meet the selection
criteria, as demonstrated by the total number of points, to OCRM for funding.
(b) In accordance with grant conditions of NOAA,
OCRM shall have final approval authority for all projects.
Source. #9570, eff 10-17-09 (from Env-Wq 2006.03)
Appendix
|
Rule Section(s) |
State Statute(s) Implemented |
Federal Statute(s)/Regulation(s) Implemented |
|
Env-Wq 2000 (see also specific section below |
RSA 4-C:1, II(i); RSA
21-O:3, IV |
16 USC 1455; 15 CFR 24 |
|
Env-Wq 2001 |
RSA 4-C:1, II(i); RSA
21-O:3, IV |
16 USC 1455; 15 CFR 24 |
|
Env-Wq 2002 |
RSA 4-C:1, II(i); RSA
21-O:3, IV |
16 USC 1455; 15 CFR 24 |
|
Env-Wq 2003 |
RSA 4-C:1, II(i); RSA
21-O:3, IV |
16 USC 1455; 15 CFR 24 |
|
Env-Wq 2004 (see also specific section below) |
RSA 4-C:1, II(i); RSA 21-O:3, IV |
16 USC 1455; 15 CFR 24 |
|
Env-Wq 2004.02 |
RSA 31:95-b |
|
|
Env-Wq 2005 |
RSA 4-C:1, II(i); RSA
21-O:3, IV |
16 USC 1455; 15 CFR 24 |
|
Env-Wq 2006 |
RSA 4-C:1, II(i); RSA
21-O:3, IV |
16 USC 1455; 15 CFR 24 |