CHAPTER Env-Sw 800 LANDFILL
REQUIREMENTS
Statutory
Authority: RSA 149-M:7
Revision Note:
Document
#8459, effective 10-28-05, readopted with amendments, renumbered, and
redesignated former Chapter Env-Wm 2500 as Env-Sw
800, pursuant to a rules reorganization plan for Department rules approved by
the Director of the Office of Legislative Services on 9-7-05. The source notes for each section of Env-Sw 800 identify the former subtitle Env-Wm and number for
the respective rule prior to Document #8459.
PART Env-Sw 801 APPLICABILITY
Env-Sw
801.01 Applicability. The rules in this chapter shall apply to
landfills.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff
10-29-97; (See Revision Note at chapter heading for Env-Sw
800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2501.01); ss by #10597, eff
7-1-14; ss by #14156, eff 12-21-24
PART Env-Sw 802 PERMITTING
REQUIREMENTS
Env-Sw
802.01 Permit Required.
(a)
A permit issued pursuant to the solid waste rules shall be required for
construction, operation, and closure of a landfill, unless exempt pursuant to
Env-Sw 302.
(b)
The type of permit required shall be as specified in Env-Sw 302.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2502.01); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
802.02 Permit Application
Requirements. The applicant for a
landfill permit shall prepare the application in accordance with:
(a)
Env-Sw 314 for a standard permit;
(b)
Env-Sw 313 for an emergency permit;
(c)
Env-Sw 312 for a research and development
permit; and
(d)
Env-Sw 311 for a permit-by-notification.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2502.02); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
PART Env-Sw 803 FEDERAL
REQUIREMENTS FOR MSW LANDFILLS
Env-Sw
803.01 Purpose. The purpose of the rules in this part is to
identify facilities subject to the federal requirements for municipal solid
waste landfills (MSWLFs) in 40 CFR 258.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2503.01); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
803.02 Applicability.
(a)
The rules in Env-Sw 803.03 identify the
circumstances under which a MSWLF shall be subject to the requirements in 40
CFR 258.
(b)
The rules in Env-Sw 803.04 identify the
criteria in 40 CFR 258 and the solid waste rules which apply to MSWLFs which
are subject to 40 CFR 258.
Source. #5172, eff 7-1-91; ss by #6372, eff 11-16-96;
ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm
2503.02); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24
Env-Sw
803.03 Applicability of Federal Law. In order to determine whether a MSWLF is
subject to the requirements of 40 CFR 258, the following provisions and
definitions from 40 CFR 258.1 and 40 CFR 258.2 shall apply:
(a)
MSWLFs that stopped receiving waste on or before October 9, 1991 shall be exempt from the requirements of 40 CFR 258;
(b)
MSWLFs that received 100 tons per day of waste or less after October 9, 1991 and stopped receiving waste prior to April 9, 1994
shall be exempt from the requirements of 40 CFR 258 except for the final cover
requirements specified in 40 CFR 258.60(a) provided the final cover was fully
installed by October 9, 1994. If the
final cover was not fully installed by October 9, 1994, the MSWLFs shall be
subject to all requirements of 40 CFR 258;
(c)
MSWLFs that received 100 tons per day of waste or less on or after April
9, 1994 shall be subject to all requirements of 40 CFR
258;
(d)
MSWLFs that received greater than 100 tons per day of waste after
October 9, 1991 and stopped receiving waste prior to
October 9, 1993 shall be exempt from the requirements of 40 CFR 258 except for
the final cover requirements specified in 40 CFR 258.60(a) provided the final
cover was fully installed by October 9, 1994.
If the final cover was not fully installed by October 9, 1994, the
MSWLFs shall be subject to all requirements of 40 CFR 258;
(e)
MSWLFs that received greater than 100 tons per day of waste on or after
October 9, 1993 shall be subject to all requirements
of 40 CFR 258; and
(f)
In determining the scope and applicability of the federal requirements,
the definitions specified in 40 CFR 258.2 for the following terms shall be
used:
(1) “Active life”;
(2) “Active portion”;
(3) “Director of an Approved State”;
(4) “Household waste”;
(5) “Industrial solid waste”;
(6) “Owner”;
(7) “Saturated zone”;
(8) “Sludge”;
(9) “Solid waste”;
(10) “State”;
(11) “State director”; and
(12) “Waste management unit boundary.”
Source. #6372, eff 11-16-96; ss by #6619-B, eff
10-29-97; (See Revision Note at chapter heading for Env-Sw
800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2503.03); ss by #10597, eff
7-1-14; ss by #14156, eff 12-21-24
Env-Sw
803.04 Standards Specific to MSWLFs
Subject to 40 CFR 258.
(a)
Any MSWLF that is identified by Env-Sw 803.03
as being subject to 40
(1) Location restrictions specified in 40 CFR
258.10 through 258.16;
(2) Operating criteria specified in 40 CFR
258.20, 258.21, 258.23, 258.24, 258.28, and 258.29;
(3) Design criteria specified in 40 CFR 258.40;
(4) Groundwater monitoring and corrective action
requirements specified in 40 CFR 258.53 through 258.58;
(5) Closure and post-closure requirements
specified in 40 CFR 258.60(i) and 258.61; and
(6) Financial assurance mechanisms specified in
40 CFR 258.70 through 258.75.
(b)
The provisions specified in (a)(1) through (a)(6) above shall not be
waived under Env-Sw 202.
Source. #6372, eff 11-16-96; ss by #6619-B, eff
10-29-97; (See Revision Note at chapter heading for Env-Sw
800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2503.04); ss by #10597, eff
7-1-14; ss by #14156, eff 12-21-24
PART Env-Sw 804 SITING
REQUIREMENTS
Env-Sw
804.01 Applicability.
(a)
The siting requirements in this part shall apply to all landfills
except:
(1) Landfill footprints and associated
infrastructure for which a permit or permit modification was issued prior to
the 2024 readoption of the solid waste rules;
(2) Permit-exempt facilities identified in Env-Sw 302.03 or Env-Sw 810;
(3) Permit-by-notification facilities having an
active life of 90 days or less;
(4) Research and development permit facilities,
as provided by Env-Sw 312.02(b); and
(5) Emergency permit facilities, as provided by
Env-Sw 313.02(b).
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; ss by #6894-B, eff
12-1-98; (See Revision Note at chapter heading for Env-Sw
800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2504.01); ss by #10597, eff
7-1-14; ss by #14156, eff 12-21-24
Env-Sw
804.02 Groundwater Protection
Standards.
(a)
A landfill shall not be sited within the well head protection area of a
community or non-community, non-transient water supply well system as
delineated in the department's source water protection area inventory at https://www.des.nh.gov/climate-and-sustainability/conservation-mitigation-and-restoration/source-water-protection.
(b) A landfill and all associated stormwater,
leachate, and decomposition gas infrastructure, except pipelines carrying
leachate or decomposition gas offsite for processing or treatment, shall be
located only in areas where groundwater monitoring for release detection,
characterization and remediation can be conducted prior to a release having an
adverse impact on groundwater quality at the property line.
(c)
A landfill and all associated stormwater, leachate, and decomposition
gas infrastructure shall be located only in areas where groundwater monitoring
for release detection, characterization, and remediation can be conducted prior
to a release having an adverse impact on a water supply.
(d) Undisturbed in-situ soils for 5 feet
immediately beneath the footprint shall have a representative saturated
hydraulic conductivity of 1 x 10-3 centimeters per second (cm/sec)
or less, unless the landfill design meets the requirement in Env-Sw 805.03(e).
(e)
The base of the bottom most liner system, or the base of the facility if
unlined, shall be a minimum of 6 feet above the seasonal high groundwater table
and the confirmed bedrock surface.
(f) Identification of the areas cited in (b)
through (e) above shall be based upon a hydrogeologic investigation that
includes:
(1) Subsurface investigation(s) to characterize
soils and bedrock at the site;
(2) All site-specific information required to
model the pre-construction and post-construction groundwater and surface water
regimen; and
(3) Other information as necessary to demonstrate
compliance with the siting requirements in (b) through (e) above.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2504.02); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
804.03 Surface Water Protection
Standards.
(a)
The location of a landfill relative to surface water resources shall
comply with the requirements of RSA 485-A.
(b) A landfill and all associated stormwater,
leachate, and decomposition gas infrastructure shall be located only in
areas where potential adverse impacts to surface water quality, due to erosion,
sedimentation, siltation, flood, or discharge of contaminants, can be prevented
or minimized and mitigated by facility design.
(c) A landfill and associated stormwater,
leachate, and decomposition gas infrastructure shall be located such that a
discharge, spill, leachate release, or other failure of the waste containment
system or associated infrastructure will be detected and assessed, and
remediation initiated prior to contamination reaching any perennial water body.
(d)
The footprint of a landfill and leachate storage units shall not be
located within:
(1) For any first or second order perennial
streams, 200 feet as measured from the closest bank of a stream; and
(2) For any other perennial surface water body,
500 feet as measured from the closest bank of a stream and closest shore of a
pond or lake, as applicable.
(e) The footprint of a landfill and leachate
storage units shall not be located within 200 feet of a wetland within the
jurisdiction of RSA 482-A, excluding any drainage appurtenances related to the
site, that is not allowed to be filled under the authority of RSA 482-A.
(f)
The footprint of a landfill and leachate storage units shall not be
located within 1,000 feet of a surface water reservoir or intake used for a
community drinking water supply.
(g)
The footprint of a landfill and leachate storage units shall not be
located within the 500-year floodplain.
(h) Identification of the areas cited in (a)
through (g) above shall be based on a hydrologic investigation that
demonstrates the following:
(1) Compliance with the siting requirements in
(a) through (g) above;
(2) That engineering design measures can be
incorporated to control erosion, sedimentation, and siltation; and
(3) Any potential release of contaminants to
surface waters can be prevented or, in the case of a release, detected and
remediated prior to reaching a surface water.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2504.03); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
804.04 Set-back Requirements.
(a)
There shall be a minimum 100-foot setback between the
property line and the footprint of the landfill.
(b)
There shall be a minimum 300-foot buffer between the footprint of the
landfill and class I and class II roads and a minimum 100-foot buffer between
the footprint of the landfill and class III through class VI roads.
(c) There shall be a minimum 500-foot setback
between the footprint of the landfill and all properties not owned by the
applicant or its affiliates that contain residences, residential care
facilities, nursing homes, prisons, or that are zoned for
residential use.
(d) There shall be a minimum 1,000-foot setback
between the footprint of the landfill and all properties containing public
schools, licensed day care facilities, and hospitals.
(e) The footprint of a landfill or landfill
expansion receiving putrescible wastes shall not be located within 10,000 feet
of any airport runway used by turbojet aircraft or 5,000 feet of any airport
runway used by only piston-type aircraft.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2504.04); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
804.05 Geologic Siting Limitations.
(a)
The footprint of a landfill and associated leachate storage units shall
be a minimum of 200 feet from faults that have had displacement in Holocene
time, meaning from Pleistocene to present or within the last 11,000 years.
(b)
No landfill footprint or associated stormwater, leachate, or
decomposition gas, infrastructure shall overlie an area underlain by karstified dolomite or limestone or an area susceptible to
mass movements of earth material such as landslides, rockfalls, mudslides,
slumps, earth flows, or subsidence.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2504.05); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
804.06 Property Ownership. A landfill or landfill expansion shall be
sited only on property which is owned by the permittee.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2504.06); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
PART Env-Sw 805 DESIGN AND
CONSTRUCTION REQUIREMENTS
Env-Sw
805.01 Applicability.
(a)
The design requirements in this part shall apply to all landfills,
except:
(1) Portions of existing permitted facilities
which were constructed or a facility for which final design plans and
specifications are approved for construction in accordance with Env-Sw 315 as of the 2024 effective date of this chapter;
(2) Permit-exempt facilities identified in Env-Sw 302.03 or Env-Sw 810;
(3) Permit-by-notification facilities having an
active life of 90 days or less;
(4) Research and development permit facilities,
as provided by Env-Sw 312.02(b); and
(5) Emergency permit facilities, as provided by
Env-Sw 313.02(b).
(b)
The design requirements in this part shall apply as the complement of
the design requirements in Env-Sw 1004 for all
facilities, Env-Sw 1103 for facilities having an
active life longer than 90 days, Env-Sw 1200 for
permit-by-notification facilities and, depending on the type of waste managed,
Env-Sw 900.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97,
EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter
heading for Env-Sw 800); ss by #8459, eff 10-28-05
(formerly Env-Wm 2505.01); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24
Env-Sw
805.02 General Landfill Design
Requirements.
(a)
A lined landfill shall incorporate the following design features:
(1) A foundation pursuant to Env-Sw 805.03;
(2) A liner system pursuant to Env-Sw 805.05;
(3) A leak detection and location system pursuant
to Env-Sw 805.07;
(4) A groundwater and surface water monitoring
system, if required pursuant to RSA 485-C and Env-Or 700;
(5) A stormwater management system pursuant to
Env-Sw 805.09;
(6) A decomposition gas control and migration
monitoring system pursuant to Env-Sw 805.18;
(7) A final capping system pursuant to Env-Sw 805.10; and
(8) Facility structures as necessary to house,
maintain, and repair equipment and supplies, and to accommodate the needs of
facility personnel relative to shelter, sanitation, and communication.
(b)
An unlined landfill shall incorporate the following design features:
(1) A groundwater and surface water monitoring
system, if required by RSA 485-A or RSA 485-C;
(2) A stormwater management system pursuant to
Env-Sw 805.09;
(3) A decomposition gas control and migration
monitoring system pursuant to Env-Sw 805.18;
(4) A final capping system pursuant to Env-Sw 805.10; and
(5) Facility structures as necessary to house,
maintain, and repair equipment and supplies, and to accommodate the needs of
facility personnel relative to shelter, sanitation, and communication.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2505.02); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
805.03 Landfill Subgrade and Base
Grade Standards.
(a)
The landfill subgrade shall:
(1) Underlie the base identified in (d) and (e)
below;
(2) Be graded and prepared for landfill
construction; and
(3) Have sufficient structural integrity to
support the facility under all anticipated loading conditions during all phases
of construction, operation, and closure.
(b)
Engineering measures shall be incorporated in the design when necessary
to ensure stability of the landfill during all phases of construction,
operation, and closure.
(c) Stability analyses shall be submitted with the
application to demonstrate compliance with requirements in (a) above and to
support the facility design, including measures incorporated pursuant to (b)
above, if any.
(d)
For geomembrane lined facilities, the base below the liner
and above the subgrade shall:
(1) Be prepared to a depth of not less than 12
inches, except as provided in (e) below, and provide a uniform and consistent
bedding layer which shall be stable under loading;
(2) Contain no stones greater than one inch in
diameter, and no sharp or angular materials;
(3) Be compacted to 95% of the maximum dry density
as determined by ASTM International (ASTM) D698-12(2021) (Standard Effort) or
ASTM D1557-12(2021) (Modified Effort) as available in Appendix B; and
(4) Consist of a soil with a saturated hydraulic
conductivity of 1 x 10-4 cm/sec or less.
(e)
Where undisturbed in-situ soils are not present, or where Env-Sw 804.02(d) is not met, the base shall be prepared in
accordance with (d) above to a depth of 24 inches instead of 12 inches.
(f) Facility grades shall be sloped to facilitate
compliance with Env-Sw 805.06 and Env-Sw 806.05.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05
(formerly Env-Wm 2505.03); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24
Env-Sw
805.04 Liner Material and
Construction Requirements.
(a)
Soil liners shall meet or exceed the following specifications:
(1) The liner shall be constructed of no less
than 3 feet of a recompacted natural soil with uniform and consistent
characteristics, or a uniform and consistent natural soil blended with an
admixture, such as bentonite;
(2) The liner shall be free from stones greater
than one inch in diameter and stones having a sharp or angular surface;
(3) Recompaction shall
occur in lifts not to exceed the depth demonstrated in a test pad necessary to
achieve a saturated hydraulic conductivity no greater than 1 x 10-7
cm/sec;
(4) The recompacted lifts shall be constructed in
a step-wise manner to limit the potential for vertical channeling;
(5) Recompacted saturated hydraulic conductivity
shall equal 1 x 10-7 cm/sec or less; and
(6) The liner shall be protected from damage due
to frost, desiccation, and differential movement.
(b)
Geomembrane liners shall meet or exceed the following specifications:
(1) The liner material shall have a minimum
thickness of 60 mils;
(2) The liner material shall be chemically
compatible with anticipated waste and leachate characteristics; and
(3) Seaming methods which involve the use of
solvents shall incorporate quality assurance/quality control procedures
pursuant to Env-Sw 805.16 to assure protection of
groundwater and surface water resources.
(c)
Composite liners shall consist of:
(1) A geomembrane liner, as specified by (b)
above; and
(2) A soil component as specified by (a) above or
a manufactured geosynthetic clay liner (GCL).
(d) All liners shall be constructed in accordance
with a quality assurance/quality control plan established pursuant to Env-Sw 805.16.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2505.04); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
805.05 Liner System Design Standards.
(a)
A liner system shall be comprised of the following components:
(1) A liner which meets the requirements of Env-Sw 805.04;
(2) A leachate collection and removal system
which meets the requirements of Env-Sw 805.06; and
(3) A leak detection and location system
installed below the liner in (1) above, if required by Env-Sw
805.07.
(b)
A landfill shall incorporate one or more liner systems, as specified in
Env-Sw 805.12 through Env-Sw
805.15, based on the type of wastes to be received by the facility.
(c)
Multi-liner systems shall be designed to place one liner system over
another liner system.
(d)
A single-lined facility shall incorporate one liner system.
(e) A double-lined facility shall incorporate 2
liner systems, separated by drainage material as specified in (f) below.
(f) Except as provided by (g) below, each liner
within a liner system shall be covered by a drainage geocomposite
and an overlying layer of select granular soil drainage materials 12 inches in
depth or more as required to:
(1) Sustain anticipated loading conditions;
(2) Protect the underlying liners from puncture,
including simultaneous puncture of multi-liner systems;
(3) Assist in the transmission of leachate in
accordance with Env-Sw 805.06 and Env-Sw 806.05; and
(4) At multi-liner facilities, limit the
potential for hydraulic head to be concurrently experienced on an underlying
liner in the event a leak develops in an overlying liner.
(g) For multi-liner systems, geosynthetics alone
may be used to separate the liners in areas of extended side slopes
where placement and maintenance of granular soil drainage materials
is not possible or practical for reasons of stability.
(h)
The design of all liner systems incorporating geomembrane materials
shall include calculations to demonstrate stability, but in no case shall be
designed to exceed a slope of 2 horizontal to 1 vertical (2H:1V).
(i) All liner systems shall be constructed by
controlled methods, in accordance with a quality assurance/quality control plan
established pursuant to Env-Sw 805.16.
(j)
Liner systems shall not be penetrated by any appurtenances.
(k) For multi-liner systems, GCLs shall extend
across base areas and 10 feet up sideslopes, as
measured in vertical feet.
(l) Each liner system in a multi-liner system
shall be hydraulically separate.
(m) Liner systems shall extend at least 3 feet
beyond the limit of waste, as measured in vertical feet.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2505.05); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
805.06 Leachate Collection and
Removal System Design Standards.
(a)
Leachate collection and removal systems shall be required at all lined
landfills, to prevent leachate discharges and to collect and remove leachate
contained within each liner system in conformance with Env-Sw
806.05.
(b)
Leachate collection and removal systems shall be designed to be
hydraulically separate from the stormwater management system(s).
(c) Leachate collection and removal systems
located outside the waste deposition area shall be leak tight and accessible
for leak testing, inspection, cleaning, and repair.
(d)
Leachate collection and removal systems shall be designed to function
effectively during freezing and frozen-ground conditions.
(e)
Leachate collection and removal systems shall be designed to function
effectively during both the active life of the landfill and the landfill
closure and post-closure care period. Therefore, for the purpose of sizing the
system(s) components and specifying materials with an appropriate design life
expectancy, the leachate generation rates, volumes, chemical composition, and
temperatures for the above specified time period shall be considered.
(f)
Leachate collection and removal systems shall be designed to maintain
one foot or less of hydraulic head on all portions of the liner, excluding the
leachate collection sumps if any, during routine leachate flows plus the
50-year/24-hour storm event.
(g)
Leachate collection and removal systems shall be designed to manage the
quantity of leachate to be generated by the 100-year/24-hour storm event, in a
manner which shall:
(1) Not allow a hydraulic head greater than
one-foot to exist on any portion of the liner system, excluding the leachate
collection sumps, if any, for longer than 7 days;
(2) Provide storage and removal capabilities
determined in accordance with (h) below if for a facility not directly
connected to a permitted wastewater treatment facility or in accordance with (i) below if for a facility directly connected to a
permitted wastewater treatment facility; and
(3) Not rely on leachate recirculation as a
factor in determining the required storage and removal capabilities, even if
leachate recirculation will be a routine operating procedure at the facility.
(h)
Leachate collection and removal systems which are not directly connected
to a permitted wastewater treatment facility shall provide capacity for storing
leachate as follows:
(1) At least 15% of the 100-year storm event
storage volume as specified by (g) above shall be provided in primary storage
units located outside the waste deposition area or in sumps located within the
waste deposition area;
(2) The number of walls or liners in leachate
storage units shall be no less than the number of liners within the landfill;
and
(3) Containment for the volume of leachate
produced by the 100-year storm event which exceeds the volume of the primary
storage units shall be provided:
a. Within contingency storage units located
outside the waste deposition area; and
b. On the uppermost liner within a waste
deposition area provided that:
1. Storage on the liner in excess of one-foot of
hydraulic head shall be limited to a period of 7 days or less, based on
procedures identified in the leachate management plan provided pursuant to Env-Sw 806.05, including the pumping and removal rates required
to reduce the hydraulic head to one foot or less within 7 days
and the specifications for the equipment required to do so; and
2. Systems relying on valve closure to initiate
storage on the liner shall be fully equipped with automated notification alarms
and dialers to minimize the potential for overflow, in accordance with (q)
below.
(i) Leachate collection and removal systems which
are directly connected to a permitted wastewater treatment facility shall be
designed as follows:
(1) The system shall provide leachate storage
units outside the waste deposition area as necessary to meet the requirements
of (g) above based on the allowable discharge rate of leachate to the
wastewater treatment facility, pump capabilities, and other such factors which
limit the rate at which leachate removal can occur;
(2) Compatible pumping and removal rates shall be
provided as a component of the facility’s leachate management plan, pursuant to
Env-Sw 806.05; and
(3) Systems relying on valve closure to initiate
storage shall be fully equipped with automated notification alarms and dialers
to minimize the potential for overflow, in accordance with (q) below.
(j)
The various components of a leachate collection and removal system
shall:
(1) Be chemically compatible with the anticipated
waste and leachate characteristics;
(2) Provide access for monitoring flow,
monitoring hydraulic head in the uppermost liner system, controlling flow,
conducting inspections, and cleaning;
(3) Maintain integrity under both dynamic and
static loading events for all phases of landfill development;
(4) Specify geotextiles based on calculations
which incorporate the leachate generation and flow rates anticipated to occur
during the operating and post-closure care phases of the
landfill; and
(5) Be designed to prevent the passage of fine
particulates into the leachate collection and piping systems as well as
mitigate against or eliminate the effects of any material capable of reducing
the hydraulic flow capacity of the leachate collection and piping systems.
(k)
Pipes which require solvent welding shall only be used in leachate
vaults equipped with a high-water alarm, a backup high-water alarm, and
automatic dialer.
(l)
The granular soil drainage materials in the liner system shall:
(1) Be designed to meet the requirements of (f)
and (g) above; and
(2) Contain no more than 15% calcium carbonate to
prevent deposition and clogging and otherwise be of a quality that shall not
result in clogging of the leachate collection and removal system(s).
(m)
A facility shall not be designed to rely solely on managing leachate by
recirculation methods.
(n)
Recirculation of leachate, if practiced, shall proceed only in
accordance with the provisions of a leachate recirculation plan approved by the
department as part of the facility’s operating plan pursuant to Env-Sw 1105 based on the criteria in Env-Sw
806.05.
(o)
Leachate collection and removal systems which depend on routine pumping,
rather than gravity operating methods, shall only be used at facilities where a
full-time operator shall be present during normal operating hours and where
auxiliary power and pumping equipment shall be available.
(p) Pump stations located outside the waste
deposition area shall be designed to provide the following:
(1) Backup pumping capacity;
(2) Backup power supply;
(3) High-water alarm;
(4) Backup high-water alarm;
(5) Alarms to automatic dialer; and
(6) Efficient operation during both average and
peak flows.
(q)
Tanks, sumps, and other storage units associated with leachate
collection and removal systems shall be equipped with high-water alarms, backup
high-water alarms, and automatic dialers.
(r)
Automatic dialers shall be equipped with a backup power supply and
designed to continue dialing, sending messages, or otherwise attempting to
reach a person at least once every ten minutes until the automatic dialer is
turned off or otherwise reset at the site.
(s)
Pipes, tanks, sumps, and other conveyance or storage units associated
with leachate collection and removal systems outside the waste deposition area
shall have secondary containment or be double-walled except for underground
pipes, manholes, and other buried leachate conveyance or storage systems
existing prior to the 2024 readoption of this chapter unless existing systems:
(1)
Are undersized;
(2) Have failed;
(3) Have reached the end of their service life; or
(4) Are required to be upgraded or replaced for
reasons other than the lack of a double-wall or secondary containment.
(t) A leachate transfer area shall be designed to
contain releases during leachate transfer and constructed of a concrete pad or
other impermeable surface that is of sufficient size for:
(1) All connection points to be situated over the
impermeable area when leachate is being transferred; and
(2) The entire tank portion of the cargo truck or
railcar being filled to be situated over the impermeable area when leachate is
being transferred.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05
(formerly Env-Wm 2505.06); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24
Env-Sw
805.07 Leak Detection and Location
System Design Standards.
(a)
In multi-liner systems, the bottom most liner system shall also be the
leak detection and location system.
(b)
In single-liner systems, a leak detection and location system shall be
installed beneath the bottom most liner, unless the potential for leakage is
reduced by installing a composite liner that meets the requirements of Env-Sw 805.04(c).
(c) A leak detection and location system shall be
designed to:
(1) Convey liquids to an observation point for
detection, based on a maximum time of concentration equal to 24-hours under
saturated hydraulic conditions; and
(2) Provide a means for isolating the potential
location of a leak.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2505.07); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
805.08 Groundwater and Surface Water
Monitoring System Design Standards.
(a)
The location and number of groundwater monitoring wells and surface
water sampling points shall be based on site-specific hydrology and
hydrogeology, but in no case shall there be less than one
groundwater monitoring well installed hydraulically upgradient from the
landfill and 3 monitoring wells installed in each down-gradient direction.
(b)
The location, materials, and specifications of the groundwater and
surface water monitoring system shall comply with the requirements of RSA
485-C.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2505.08); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
805.09 Stormwater Management System
Design Standards.
(a) All landfills shall include a stormwater
management system to:
(1) Divert run-on around or away from the
facility;
(2) Control run-off discharge from the facility;
(3) Control erosion, sedimentation, siltation,
and flooding; and
(4) Minimize the generation of leachate.
(b) Stormwater management systems shall be
designed to accommodate the 50-year/24-hour storm event.
(c)
Stormwater management systems shall be designed to accommodate all
phases of the landfill’s active life, as well as the closure and post-closure
care period.
(d) Stormwater management systems shall be
hydraulically separate from the leachate collection and removal system(s).
(e) Stormwater management systems shall be
designed to function effectively during frozen ground conditions.
(f) Permanent sedimentation ponds and detention
ponds shall be sized to handle the 50-year/24-hour storm event with no less
than one foot of freeboard below the emergency spillway invert.
(g) Peak surface run-off from the landfill site
during the 50-year storm event shall be controlled and maintained at the
pre-development discharge rate, in accordance with RSA 485-A.
(h) All stormwater that contacts waste shall be
managed as leachate unless representative analytical characterization conducted
in accordance with the facility’s approved operating plan demonstrates the
liquid may be lawfully discharged to ground or surface waters without
treatment.
(i) Perimeter drainage swales shall be provided
to channel run-off during facility development based on the planned sequence of
filling pursuant to Env-Sw 806.02 and during the
facility’s post-closure period.
(j)
Perimeter drainage swales shall be designed and located to accommodate
facility capping.
(k)
Surface water run-on shall be diverted around and away from the facility
by using berms and ditches, or similar methods.
(l)
Surface water run-off shall be controlled by using benches, terraces,
diversion berms and diversion swales, or similar methods.
(m)
Erosion shall be controlled by using vegetation, terrace berms, silt
fences and check dams, or similar methods.
(n)
Drainage systems shall include provisions for inspections, monitoring,
and maintenance.
(o) Stormwater design reports prepared to
demonstrate compliance with this section shall be prepared in accordance with
the requirements of Env-Wq 1500.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; amd
by #6894-B, eff 12-1-98; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm
2505.09); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24
Env-Sw
805.10 Landfill Capping System Design
Standards.
(a)
Landfill capping systems shall be designed to meet the performance
standards in Env-Sw 807.04 so as to:
(1) Reduce leachate generation by limiting to the
extent practicable precipitation and surface water infiltration of the waste,
through placement of either impermeable or low-permeable cover materials over
landfilled areas;
(2) Promote drainage of stormwater and other
surface waters away from and around the facility, by properly grading the
facility and surrounding areas, and by constructing drainage structures,
including berms, trenches, swales, ditches, and detention ponds;
(3) Limit erosion and sedimentation by controlling
stormwater drainage and by seeding, vegetating, riprapping, or otherwise
stabilizing surface soils against the effects of wind and water;
(4) At facilities that will generate methane gas,
control the release of methane gas from the facility by incorporating vents
designed to function properly in all anticipated weather conditions, including
heavy or drifting snow, or by incorporating recovery wells or similar methods,
to assure compliance with Env-Sw 805.18 and Env-Sw 806.07;
(5) Protect or isolate the underlying waste
materials from exposure to the environment to limit the attraction of vectors,
production of leachate, production of odors, risk of injury or fire, and other
threats to the public health and safety;
(6) Resist damage due to the influences of
freeze-thaw cycles, settlement, loading, or other anticipated conditions which,
not properly considered during design, will result in over stressing the cap;
and
(7) Remediate environmental damage resulting from
the facility, if determined necessary by the department on the basis of
groundwater and surface water quality at the site or on the basis of other
conditions involving environmental degradation at the site prior to closure.
(b)
Lined landfill capping systems shall be designed in cross section
according to the specifications provided in (e) below.
(c)
Unlined landfill capping systems shall be designed in cross section
according to the specifications provided in either (e) or (g) below.
(d)
For unlined landfills, the type of capping system required pursuant to
(e) or (g) below shall be based on which system type will meet the performance
standards in Env-Sw 807.04, using the following
factors to make the determination:
(1) Type and quantity of waste received by the
facility;
(2) Size of facility footprint;
(3) Compliance and performance history of the
facility;
(4) Extent of groundwater to waste contact zones,
if any;
(5) Groundwater and surface water quality at the
facility site;
(6) Proximity to drinking water supplies, surface
waters, and floodplains;
(7) Age of the facility;
(8) Site topography; and
(9) Geologic and hydrogeologic characteristics of
the site.
(e)
Impermeable landfill capping systems shall, at a minimum, be comprised
of the following layers, from the top of the waste to the top of the cap:
(1) Layer 1, immediately overlying the waste,
shall:
a. Serve to provide a stable, properly graded
base for the placement of layer 2;
b. Be designed to resist raveling, or the
sifting of fines downward into the underlying wastes; and
c. Consist of no less than 12 inches of
unspecified soil;
(2) Layer 2 shall:
a. Serve to protect layer 3 from potential
damage by underlying coarse soil materials;
b. Serve to transmit decomposition gases to gas
vents if active gas extraction wells are not used; and
c. Consist of at least 12 inches of sand with
100% passing the one inch sieve and with no more than 12% passing the number
200 sieve on a weight basis if for a facility without an active gas extraction
system or at least 6 inches of soil with 100% passing the one inch sieve if for
a facility with an active gas extraction system;
(3) Layer 3 shall consist of an impermeable
barrier which shall:
a. Minimize the infiltration of water into
underlying wastes so as to limit continued leachate production and the
associated adverse impacts to the quality of groundwater and surface waters;
and
b. Consist of a geomembrane with a minimum
thickness of 40 mils;
(4) Layer 4 shall:
a. Provide for the removal of water which
infiltrates through the topsoil layer, or layer 5;
b. Protect layer 3 from penetration or other
damage, including frost and desiccation;
c. Consist of:
1. At least 18 inches of free-draining sand which
has a saturated hydraulic conductivity of no less than 1 x 10 -3 cm/sec, will
pass on a weight basis no more than 10% through the number 200 sieve, and
contains no more than 15% calcium carbonate; or
2. Drainage geocomposite
and no less than 12 inches of drainage sand, specified based on the results of
a hydraulic calculation supporting the design and containing no more than 15%
calcium carbonate; and
d. Terminate in a drainage system at the toe of
the slope of the cap that is designed to readily remove water transmitted by
layer 4; and
(5) Layer 5 shall:
a. Serve to stabilize the capping system against
the forces of wind and water erosion;
b. Provide a low-maintenance surface;
c. Promote evapotranspiration, meaning loss of
water from the soil by both evaporation and transpiration from plants growing
thereon;
d. Provide ease of visual inspection of the
capping system surface; and
e. Consist of no less than 4 inches of topsoil,
which is fertilized and vegetated.
(f) Alternative or supplemental materials to the
topsoil specified in (e)(5) above shall be used if determined necessary by the
permittee and agreed to by the department on the basis of actual site features
and conditions, to achieve the required stability or erosion control.
(g) Low permeable capping systems, formerly
referred to by the department as “extended interim closure,” shall be comprised
of the following layers, at a minimum, from the top of the waste to the top of
the cap:
(1) Layer 1 shall conform to the requirements for
layer 1 for impermeable capping systems as specified in (e)(1) above;
(2) Layer 2 shall:
a. Serve to isolate wastes from the environment
and to protect public health;
b. Reduce the infiltration of water into
underlying wastes; and
c. Consist of no less than 18 inches of soil
with a saturated hydraulic conductivity not greater than 1 x 10-5 cm/sec; and
(3) Layer 3 shall conform to the requirements for
layer 5 for impermeable capping systems as specified in (e)(5) except as
allowed in (f) above.
(h) Landfill capping systems shall be constructed
in accordance with a quality assurance/quality control plan established
pursuant to Env-Sw 805.16.
(i) Landfill capping systems shall be designed to
manage properly stormwater resulting from the 50-year/24-hour storm event and
incorporate at least one of the following:
(1) Intermittent swales on the side slopes of the
capping system, placed at an interval of 20 vertical feet or minimum spacing of
100 feet as measured from the center line of the swales, with a minimum slope
of 2 percent to allow for settlement; or
(2) An erosion-resistant moisture retention
layer, placed directly under the vegetated layer, designed to sustain
vegetative growth and effectively resist gully erosion.
(j)
Stability calculations for the landfill capping system shall be
submitted by the applicant to support the proposed design.
(k)
Excluding the drainage swales noted in (i)(1)
above, landfill capping systems shall be designed at a slope of 5% or greater,
as necessary to accommodate the anticipated effects of settlement and
consolidation and assure positive drainage and stability of the capping system
during the post-closure period.
(l)
The landfill capping system shall:
(1) Extend beyond the confirmed limits of
landfilled waste and the underlying liner systems; and
(2) Terminate or be anchored in a manner which:
a. Stabilizes the capping system against creep,
pull-out, and material failure due to excessive stress;
b. Limits erosion or wash-out at the
toe-of-landfill slope(s); and
c. Limits surface water from infiltrating into
the waste.
(m)
The landfill capping system and the post-closure period stormwater
management system shall be compatible in design. Hydraulic calculations to
support the proposed design shall be provided, including calculations to
demonstrate that the drainage media shall function as intended in the design.
(n)
Unless the facility only receives inert waste such as concrete debris,
the landfill capping system shall incorporate a decomposition gas management
system meeting the design criteria of Env-Sw 805.18
and the performance criteria of Env-Sw 806.07.
(o)
Landfill capping systems shall be designed to support such loading as
might occur during and following construction, including activities anticipated
to occur during post-closure care, such as maintenance vehicles driving over
the cap.
(p)
On-the-ground markers or other type of clearly visible control points
shall be placed at the facility site to allow facility personnel and inspectors
to readily identify and locate the limits of the capping system.
(q)
Except in areas where berms, swales, other stormwater infrastructure, or
access roads are constructed, the maximum slope of capping systems shall not
exceed 2.5 horizontal to 1 vertical.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter
heading for Env-Sw 800); ss by #8459, eff 10-28-05
(formerly Env-Wm 2505.10); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24
Env-Sw
805.11 Other Landfill Design
Requirements.
(a)
The sequencing of facility development shall be planned based on
subdividing the footprint into areas separated by berms.
(b)
The subdivisions of a footprint shall be referred to as “phases,”
“stages,” and “cells,” each term being used as defined in Env-Sw 104.09, Env-Sw 104.51, and
Env-Sw 102.32, respectively.
(c)
A facility shall be comprised of one or more phases, within which may
exist one or more stages, within which may exist one or more cells, depending
on the size of the facility and the design of the leachate management system.
(d)
The layout and the configuration of, and the sequence for developing the
phases, stages, and cells shall, by design:
(1) Limit leachate generation by controlling the
amount of area open to active operation and otherwise placing waste in a
controlled manner consistent with the requirements in Env-Sw
806.02;
(2) Limit the length of time unused cells remain
inactive; and
(3) Avoid the need to decommission groundwater
monitoring wells as facility development proceeds and new stages or phases are
constructed.
(e)
Fill sequencing plans shall be prepared as part of the facility
operating plan to show clearly the sequencing of facility development.
(f)
Fill sequencing plans shall:
(1) Show elevations and placements of lifts, as
well as general access points;
(2) Be compatible with the facility’s leachate
management system design capabilities and limitations;
(3) Be compatible with the facility’s stormwater
management system design capabilities and limitations;
(4) Be compatible with the facility closure
design; and
(5) Provide information and detail sufficient to
allow a certified operator to operate the landfill in accordance with the
approved design.
(g)
Main access roads within the property boundary of a landfill leading to
and from the working face of the landfill shall be designed and maintained to
support the required loading, as well as limit to the extent practicable
traffic congestion, road safety hazards, and dust production.
(h) Main access roads onto or into the property
shall be fenced if necessary to catch blowing litter.
(i) Landscaping features shall be incorporated in
conformance with Env-Sw 1103.04.
(j)
Final grades at the facility shall be designed to blend with surrounding
features to the greatest extent practicable.
(k) Perimeter and interior berms shall be analyzed
for stability.
(l) Vegetated buffer zones shall be designed,
established, and maintained to minimize impacts to abutting properties,
including by shielding waste storage, handling, and disposal
areas, and controlling the off-site transport of dust and
windblown litter, as follows:
(1) In the setback required by Env-Sw 804.04(a), the 50 feet nearest the property line;
(2) In the setback required by Env-Sw 804.04(c), the 400 feet nearest the property line; and
(3) In the setback required by Env-Sw 804.04(d), the 500 feet nearest the property line.
(m) A vegetated buffer zone shall be designed,
established, and maintained to minimize the impact of
ingress and egress access roads on abutting properties.
(n) An odor control plan shall be prepared and
implemented as part of the technical specifications when excavation of
putrescible waste is required during landfill construction.
(o)
A landfill shall be designed such that all waste containment and
structural components, including but not limited to, liner and leachate
collection systems and cap systems, are constructed to resist the maximum horizontal
acceleration in lithified earth materials within a seismic impact zone as
defined in 40 CFR 258.14.
(p)
A stability assessment of the landfill leachate management systems,
and other structures such as mechanically stabilized earth berms, shall
be performed and:
(1) Include an analysis of potential failure
planes for both static and seismic conditions; and
(2) Be supported by corroborative field and
laboratory data that defines the site geology and hydrogeology, geotechnical
characteristics, waste mass characteristics, and geosynthetic characteristics.
(q)
All walls, berms, or other structures used to retain waste shall be:
(1) Located on a stable foundation as demonstrated
by geotechnical investigation and calculations;
(2) Designed with a static factor of safety of at
least 1.5 against overturning and sliding; and
(3) Designed to prevent the lateral movement of
the waste mass.
(r)
A settlement assessment to predict total and differential settlement of
landfill systems shall be performed, and include:
(1) A demonstration that systems will maintain
their integrity and performance at maximum predicted settlements; and
(2) A plan view showing settlement contours when
predicted landfill settlements exceed 2 feet.
(s)
Design features shall include the means to control and extinguish fires
which might occur within the landfill and to otherwise limit the potential for
liner damage due to fire.
(t) No permit or permit modification shall be
granted for a landfill or landfill expansion unless groundwater monitoring can
be accomplished, when required, in accordance with this chapter and pursuant to
RSA 485-C.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05
(formerly Env-Wm 2505.11); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24
Env-Sw
805.12 MSW Landfill Design Standards.
(a) Landfills receiving municipal solid waste
(MSW) shall be designed as double-lined facilities pursuant to Env-Sw 805.05 and one of the liners shall be a composite liner
pursuant to Env-Sw 805.04(c) and, as applicable, Env-Sw 805.05(k).
(b)
Landfills receiving MSW shall be designed to provide the capability to
operate in a manner that promotes rapid biological stabilization of landfilled
wastes, as by leachate recirculation or bioreactor technologies, or both.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2505.12); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
805.13 MSW Incinerator Ash Landfill
Design Standards. Landfills
receiving MSW incinerator ash shall be double-lined facilities pursuant to the
requirements of Env-Sw 805.05 and one of the liners
shall be a composite liner pursuant to Env-Sw
805.04(c) and, as applicable, Env-Sw 805.05(k).
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2505.13); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
805.14 Construction/Demolition Debris
Landfill and Coal Ash Landfill Design Standards.
(a)
Except as provided by Env-Sw 805.15 and
subject to (b) below, landfills receiving construction and demolition debris
only or coal ash only may be designed as single-lined facilities pursuant to
the requirements of Env-Sw 805.05 and the liner shall
be a composite liner pursuant to Env-Sw 805.04(c)
and, as applicable, Env-Sw 805.05(k).
(b)
If, based on an evaluation of the facility’s proposed operating plan and
identification of the specific type or source of the wastes, the
characteristics of the wastes cannot be consistently determined or assured or
the characteristics pose a threat to groundwater quality, the facility shall be
a double-lined facility pursuant to Env-Sw 805.05 and
one of the liners shall be a composite liner pursuant to Env-Sw 805.04(c) and, as applicable, Env-Sw
805.05(k).
(c)
Landfills which co-mingle construction and demolition debris with other
waste types shall meet the design requirements set forth in this part relative
to the other waste types, if the latter are more stringent than the
requirements set forth in (a) above.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2505.14); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
805.15 Design Standards for Landfills
Receiving Other Solid Waste Types.
(a)
Landfills for any waste type(s) not specifically identified in Env-Sw 805.12 through Env-Sw 805.14
shall be designed as double lined facilities pursuant to Env-Sw 805.05 and one of the liners shall be a composite liner
pursuant to Env-Sw 805.04(c) and, as applicable, Env-Sw 805.05(k), except as provided by (b) below and subject
to the landfilling prohibitions in Env-Sw 806.12.
(b)
Landfills which receive only stumps and brush, as assured through the
provisions of the facility’s operating plan, may be designed as unlined
landfills pursuant to Env-Sw 805.02(b).
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2505.15); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
805.16 Quality Assurance/Quality
Control (QA/QC) Standards for Liner and Capping Systems.
(a) Liners and capping systems shall be tested and
placed in strict accordance with a quality assurance/quality control (QA/QC)
plan.
(b)
The QA/QC plan shall be developed in accordance with this part and
approved by the department as part of the construction contract documents
provided pursuant to the provisions for a permit modification in Env-Sw 315.
(c) The QA/QC plan shall:
(1) Be included in the project contract documents;
(2) State clearly the minimum qualifications of
the project engineer and their designee, if any;
(3) Outline the specific duties of the project
engineer and their designee with respect to the QA/QC plan;
(4) Require the project engineer to provide
reports as specified in Env-Sw 1104.04, Env-Sw 1104.05, Env-Sw 1104.06, and
Env-Sw 1104.07; and
(5) Reference the appropriate standard tests, such
as ASTM or Geosynthetics Research Institute (GRI), to verify that the
requirements cited in this section have been met.
(d) The QA/QC plan may reference the project
technical specifications as appropriate to ensure consistency and minimize
redundancy.
(e) The QA/QC plan for soils shall, at a minimum,
specify:
(1) Criteria for soil acceptance based on the
following:
a. Grain size distribution pursuant to ASTM
D6913/D6913M-17 and D7928-21e1 for:
1. Every 3,000 cubic yards of unprocessed soil;
or
2. Every 10,000 cubic yards of soil which has
been processed to meet the project specifications;
b. Hydraulic conductivity pursuant to ASTM
D2434-22 for each new source of soil;
c. Calcium carbonate content pursuant to ASTM
D4373-21 for each new source of soil;
d. Compaction test method pursuant to ASTM
D698-12(2021) or ASTM D1557-12(2021) and testing frequency;
e. Hydraulic conductivity test method pursuant to
ASTM D5084-24 and testing frequency; and
f. In place sampling method pursuant to ASTM
D1587/D1587M-15 and hydraulic conductivity testing frequency; and
(2) Provisions for correcting the installation of
off-specification materials.
(f) The QA/QC plan for geosynthetics shall, at a
minimum, include:
(1) Criteria for material acceptance based on
physical, mechanical, hydraulic, endurance, and degradation properties
determined during design;
(2) The frequency at which testing shall occur and
the testing protocol to be met;
(3) Provisions for correcting the installation of
off-specification materials; and
(4) For geomembranes, the requirements of (g)
below.
(g) The QA/QC plan for geomembranes shall
meet the requirements in (f) above and the following:
(1) Require the project engineer or their
designee to be present on site at all times during handling, deployment,
seaming, testing, and covering of any geomembrane liner or cap and have the
authority to order testing and to reject any materials or constructed systems
which might affect the liner's or cap’s performance for any reason;
(2) Contain the manufacturer’s quality assurance
requirements to assure that geomembranes shall be of a consistent quality and
meet the project specifications;
(3) State the type of geomembrane material and
texture, and the minimum requirements of raw material quality and formulation;
(4) Identify the minimum acceptance standards for
manufactured geomembrane sheets, including overall sheet quality, a list of
acceptable index properties and quality of factory seams;
(5) Assure that geomembrane material shall not be
damaged from the time it leaves the factory to the time it is finally covered,
by addressing the following:
a. Requirements for shipping, handling, and site
storage to assure that the material shall be protected from damage and
sunlight;
b. Minimum quality standards for the soil upon
which the geomembrane will rest;
c. Provisions for the project engineer or their
designee to inspect the soil upon which the geomembrane will rest prior to
placement of any geomembrane and, pursuant to Env-Sw
1104.04, certify that such soil has been installed in accordance with contract
documents;
d. Standards for the placement of geomembrane
material which address, at a minimum, placement methods, unfavorable weather
conditions, excessive heat or cold, wind, and wrinkles; and
e. The upper limit as a percentage of the amount
of patching any geomembrane panel can receive;
(6) Contain minimum requirements for seam quality
and specific remedies for when the minimum requirements are not met;
(7) Verify the competence of seaming and welding
equipment and personnel prior to seaming and welding;
(8) Require the project engineer or their designee
to have authority to reject any equipment, material, or personnel
not passing the tests specified by the QA/QC plan;
(9) Specify testing for seam strength at a
specified interval and criteria for pass/fail;
(10) Specify testing for seam continuity; and
(11) Contain provisions for protecting the
geomembrane during covering and backfilling.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2505.16); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
805.17 Vertical Expansion of
Landfills.
(a)
No permit or permit modification shall be granted for
vertical expansion of a landfill, as defined in Env-Sw
104.61 unless:
(1) The existing landfill is equipped with a
liner system meeting the requirements of Env-Sw 805;
(2) The proposed vertical expansion incorporates
a liner system meeting the requirements of Env-Sw 805
over the existing landfill; or
(3) For landfills receiving MSW, the existing
landfill is equipped with a double liner system permitted prior to the 2024
readoption of this chapter, and there is no evidence of release(s) of
contaminants through the liner system(s) to the environment or other damage to
the liner system(s).
(b) Stability and settlement assessments required
pursuant to Env-Sw 805.11 shall be performed, at a
minimum, for the existing landfill prior to vertical expansion, for the
combined existing landfill and vertical expansion during construction and
operation, and for the combined existing landfill and vertical expansion at
full capacity.
Source. #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
805.18 Decomposition Gas Control and
Migration Monitoring System Design Standards.
(a) Decomposition gas control and migration
monitoring systems shall be required at landfills with the potential to
generate decomposition gasses.
(b) Decomposition gas control and migration
monitoring systems shall be designed to meet the decomposition gas control
requirements in Env-Sw 806.07 and to control to the
greatest extent practicable malodorous gas emissions.
Source. #14156, eff 12-21-24
PART Env-Sw 806 OPERATING
REQUIREMENTS
Env-Sw
806.01 Applicability.
(a)
The operating requirements in this part shall apply to all landfills,
except:
(1) Existing landfills which ceased operating
prior to October 29, 1997 and do not resume operations
on or after October 29, 1997;
(2) Permit-exempt landfills identified in Env-Sw 302.03 or Env-Sw 810;
(3) Permit-by-notification landfills having an
active life of 90 days or less;
(4) Research and development permit facilities as
provided by Env-Sw 312.02(b); and
(5) Emergency permit facilities as provided by
Env-Sw 313.02(b).
(b)
The operating requirements in this part shall apply as the complement of
operating requirements in Env-Sw 1005 for all
facilities, Env-Sw 1105 for facilities having an
active life longer than 90 days, Env-Sw 1204 for
permit-by-notification facilities, and, depending on the type of waste managed,
Env-Sw 900.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2506.01); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
806.02 Waste Placement.
(a)
The fill sequencing plan developed in accordance with Env-Sw 805.11 shall be part of the facility operating plan and
implemented in accordance with the requirements of this section.
(b)
Wastes shall be placed only within the permitted vertical and lateral
limits of the landfill.
(c)
Wastes shall be placed in a controlled manner, in accordance with the
fill sequencing plans.
(d)
Fill sequencing plans shall be developed on the basis of limiting the
quantity of leachate a facility generates, through grading and covering
techniques which maximize the quantity of received precipitation that can be
handled as stormwater.
(e)
Unloading of waste shall be confined to the smallest practical area.
(f)
Exposed waste on the working face of the landfill shall be limited, to
reduce precipitation contact with the waste and to allow the area to be covered
as required pursuant to Env-Sw 806.03.
(g)
All waste shall be evenly spread in shallow lifts and compacted, in
accordance with plans and procedures which:
(1) Assure stability;
(2) Limit potential future settlement;
(3) Limit rainfall infiltration; and
(4) Are consistent with the progressive
development of final grades.
(h)
The first layer of waste placed above the leachate collection layer
shall be a minimum of 4 feet in compacted thickness and be of a select nature
containing no large or rigid objects, such as pipes or posts, that might cause
damage to the liner system or instability.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2506.02); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
806.03 Landfill Cover During
Operations.
(a)
An approved cover material shall be applied over all sides and working
faces of the landfill in a manner and at a frequency required to achieve the
following performance objectives:
(1) Minimize the dispersal of offensive odors;
(2) Minimize the potential to attract and harbor
vectors;
(3) Control drainage in accordance with Env-Sw 805.06, Env-Sw 805.09, Env-Sw 806.05, and Env-Sw 806.06;
(4) Control unsightly conditions and windblown
waste;
(5) Reduce the potential for fire;
(6) Provide stability; and
(7) Assist in the proper development of final
grades, as set forth in the facility’s approved fill sequencing plans.
(b)
A material shall not be approved or used as cover material unless:
(1) The material exhibits characteristics
required to achieve the performance objectives in (a) above;
(2) Use of the material will not:
a. Cause equipment or operational problems;
b. Contribute to the deterioration of leachate
quality at lined landfills;
c. Cause surface water or groundwater
contamination; or
d. Pose a hazard to human health through skin
contact or respiration; and
(3) The material itself:
a. Is not a hazardous waste;
b. Is physically and chemically consistent in
nature; and
c. Contains no free liquids.
(c)
At landfills receiving MSW, cover material approved in accordance with
Env-Sw 314 or Env-Sw 315
shall be placed over all exposed waste no less frequently than at the end of
each operating day.
(d)
Cover materials shall be placed over all exposed waste at a minimum
thickness of 6-inches, except for geosynthetic tarps and alternate daily cover
materials approved with a different thickness in accordance with Env-Sw 314 or Env-Sw 315.
(e) Subject to the requirements in (b)
above, the following materials shall be approved as working face cover
material:
(1) Natural soils; and
(2) The following alternate daily cover
materials, provided that use of the material is approved as part of the
facility operating plan or approved via a permit modification
pursuant to Env-Sw 315:
a. Geosynthetic tarps;
b. Casting sands;
c. A waste certified for distribution and use as
landfill cover pursuant to the provisions of Env-Sw
1500 prior to the 2024 readoption of this chapter;
d. A waste approved for distribution and use as
landfill cover pursuant to the provisions of Env-Sw
806.03(f); and
e. Contaminated soil, subject to the
requirements of Env-Sw 903.05.
(f)
Prior to using an alternate daily cover material in
accordance with (e)(2)d. above, the permittee shall:
(1) Obtain approval of a demonstration project
meeting the requirements in (g) and (h) below pursuant to the permit
modification process in Env-Sw 315;
(2) Submit a report meeting the requirements of
Env-Sw 806.03(h) to the department documenting the
results of the demonstration project; and
(3) Obtain approval of the alternate daily cover
pursuant to the permit modification process in Env-Sw
315.
(g) A demonstration project shall be conducted for
a period of no less than 60 days.
(h) The demonstration project required by (f)
above shall include the following information:
(1) The proposed cover material type and name;
(2) Specifications for the material and, if
available, a safety data sheet (SDS);
(3) Test methodology, including procedures for
placement and evaluation;
(4) A contingency plan for the use of natural
soils or geosynthetic tarps if the alternate material cannot be used, is not
available, or is not performing adequately;
(5) Analytical characterization testing; and
(6) Any available documentation of the material’s
use at other landfills which addresses the material’s performance and
regulatory status.
(i) Following completion of the demonstration
project in (f) above, the permittee shall submit a report to the department
that includes:
(1) The proposed cover material type and name;
(2) The results of the project, including an
assessment of;
a. The performance of the material for each
criterion listed in (a) above; and
b. Whether the material meets the requirements in
(a) and (b) above; and
(3) A determination as to whether the material is
suitable for use as cover material and recommendations for its use as cover
material, including:
a. The material specifications for acceptance;
and
b. The weather conditions during which the
material can or cannot be used.
(j) A permittee may rely on a demonstration
project completed by others when seeking a permit modification in accordance
with Env-Sw 315, provided such demonstration project
meets the requirements of (g) and (h) above.
(k) At landfills receiving MSW, an intermediate
cover shall be placed over all waste no later than 90 days following the last
day waste was added to the area and shall consist of at least:
(1) Twelve inches of soil, which
may contain regulated contaminants at concentrations that do not exceed the
soil remediation standards specified in Env-Or 606.19; or
(2) A temporary geomembrane cap underlain by 6
inches of soil that may contain regulated contaminants at concentrations that
do not exceed the soil remediation standards specified in Env-Sw 606.19.
(l) At landfills receiving MSW, a final cap system
designed pursuant to Env-Sw 805.10, shall be
constructed within 5 years of achieving final grade in any phase or portion of
the landfill, unless an alternative schedule is approved in accordance with
Env-Sw 314 or Env-Sw 315
based on information provided in the application which demonstrates:
(1) The intermediate cover used will meet the
performance standards in Env-Sw 805.10(a) for the
duration of time requested in the alternative schedule; and
(2) The alternative schedule for placing final cap
will not result in problems relating to the conditions identified in Env-Sw 1005.01(d).
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; ss by #6894-B, eff
12-1-98; (See Revision Note at chapter heading for Env-Sw
800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2506.03); ss by #10597, eff
7-1-14; ss by #14156, eff 12-21-24
Env-Sw
806.04 Operating Standards for
Groundwater and Surface Water Monitoring.
A water quality monitoring program shall be implemented at all
landfills, if required pursuant to the provisions of RSA 485-C.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2506.04); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
806.05 Leachate Management
Requirements.
(a)
The quantity of leachate generated at the facility shall be limited to
the greatest extent practicable, by properly planning the sequenced development
of the facility, properly managing stormwater infiltration and inflow,
minimizing the active area of the landfill, and applying cover in accordance
with Env-Sw 806.03.
(b) All leachate generated at a lined landfill
shall be managed:
(1) To prevent releases to the environment; and
(2) By collecting and removing it from the liner
system(s) to an approved treatment or disposal facility as described in (c)
through (h), below; or
(3) Pursuant to an approval to use an innovative
alternative leachate management system as described in (i)
through (o), below.
(c) A leachate management plan shall be developed,
included in the facility’s operating plan, and implemented at all lined
landfills, based on the following criteria:
(1) Routine facility operations, including
operations during the 50-year/24-hour storm event, shall not result in more than one foot of
hydraulic head on the liner system(s);
(2) No less than 2 locations for leachate
treatment or disposal shall be available by written agreement to manage the
quantity of leachate generated by the facility during its active life, except
as provided in (3) below;
(3) Facilities that are directly connected to a
permitted wastewater treatment facility need only to provide one
location for leachate management, other than the connected treatment
facility; and
(4) A pumping and removal schedule to assure the
availability of storage capacity.
(d)
The recirculation of leachate shall be prohibited at ash monofills.
(e)
At MSW landfills, leachate recirculation shall be allowed if approved by
the department subject to (f) below, as part of the facility's operating plan
prepared pursuant to Env-Sw 1105.
(f)
The practice of leachate recirculation shall:
(1) Not adversely affect the quality of the
leachate so as to preclude its acceptance at waste water treatment facilities
listed in the leachate management plan;
(2) Not cause the facility to operate in excess of
12 inches of hydraulic head on the liner under routine operations including the
50-year/24 hour storm event;
(3) Not result in a loss of structural stability;
(4) Not be adversely affected by weather
conditions, such as freezing temperatures or periods of heavy rainfall; and
(5) Provide a benefit to facility operations,
exclusive of any short or long-term economic benefit which might be associated
with postponing leachate collection and removal.
(g)
Storage capacity shall be required to contain the leachate generated by
the precipitation from the 100-year storm event in accordance with Env-Sw 805.06.
(h)
Regularly scheduled inspections and routine maintenance of the leachate
collection and removal systems, including backup equipment, shall be conducted
to limit clogging of the systems and to otherwise assure the functional
integrity of the systems.
(i) The permittee of a landfill having a leachate
collection system designed and constructed to maintain less than a 30-cm depth
of leachate on the liner may apply for approval to use innovative alternative
leachate management methods which vary from the requirements of (a) through
(h), above, and the run-on control systems in 40 CFR 258.26(a)(1), May 10,
2016, or the liquids restrictions in 40 CFR 258.28(a), May 10, 2016, or both.
(j)
Prior to implementing any innovative alternative leachate management
method, the permittee shall apply for permit modification as specified in Env-Sw 315.
(k) The department shall not approve an
application for an innovative alternative leachate management method unless the
permittee demonstrates that the innovative alternative method will not cause
contamination of groundwater or surface water, or cause leachate depth on the
liner to exceed 30 cm.
(l)
Any permit modification issued pursuant to (k), above, shall include
such terms and conditions as are necessary to ensure that the innovative
alternative leachate management method is at least as protective as the
leachate management methods otherwise required by (a) through (h), above,
including but not limited to conditions relating to monitoring and testing the
efficacy and performance capabilities of the innovative alternative technology
or process and reporting on the efficacy and performance capabilities of the
innovative alternative method.
(m) A permit modification issued pursuant to (k),
above, shall be valid for 3 years, subject to the following:
(1) The permittee shall maintain compliance with
all terms and conditions of the permit, the solid waste rules, and 40 CFR
258.4, May 10, 2016;
(2) If such compliance is not maintained, the
permit modification shall be terminated or other corrective measures shall be
ordered, in accordance with 40 CFR 258.4(d), May 10, 2016;
(3) If the permittee wishes to continue using the
innovative alternative method beyond the term of the permit modification, the
permittee shall apply for renewal at least 90 days prior to the expiration of
the modification by submitting a written renewal application and a report,
including supporting data, which documents the efficacy and performance
capabilities of the innovative alternative method; and
(4) The department shall renew the modification to
allow continued use of the innovative alternative method if:
a. The permittee demonstrates that the innovative
alternative method is effective in preventing contamination of groundwater or
surface water and that leachate depth on the liner has not exceeded 30 cm; and
b. The permittee is in compliance with all terms
and conditions of the permit, the solid waste rules, and 40 CFR 258.4, May 10,
2016.
(n)
A renewal under (m), above, shall be valid for 3 years, provided however
that the total term for an innovative alternative method including renewals
shall not exceed 12 years.
(o)
The limitations in 40 CFR 258.4(f), May 10, 2016, relative to small
MSWLF units shall apply.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97,
EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter
heading for Env-Sw 800); ss by #8459, eff 10-28-05
(formerly Env-Wm 2506.05); amd by #9695, eff 4-22-10;
ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24
Env-Sw
806.06 Stormwater Management
Requirements. The permittee shall
grade the site to redirect run-on and run-off away from the active face of the
landfill, reduce the amount of leachate generated, and reduce the potential for
erosion, in accordance with Env-Sw 805.09.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2506.06); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
806.07 Decomposition Gas Control
Requirements.
(a)
Decomposition gases shall be controlled to prevent hazards to health,
safety, or property.
(b)
Facility operations and construction shall not cause the concentration
of methane and other explosive gases to:
(1) Exceed 25 percent of the lower explosive limit
for gases in structures on or off-site, excluding leachate collection and gas
control and recovery components; and
(2) Exceed 50 percent of the lower explosive limit
for the gases at and beyond the property boundary within the soil.
(c)
To assure that the requirements in (a) and (b) above are met, a
monitoring program shall be designed, included in the facility’s operating and
closure plans, and implemented by the permittee in accordance with Env-Sw 805.18.
(d)
The type, location, and frequency of monitoring shall be based on the
following factors:
(1) Soil conditions;
(2) The hydrogeological and hydraulic conditions
surrounding the disposal area; and
(3) The location of any man-made structures and
property boundaries.
(e)
If methane or other explosive gases are detected above the limits
specified in (b) above, the permittee shall notify the department immediately
in accordance with the incident reporting requirements in Env-Sw 1005.09 and implement contingency procedures to ensure
the protection of public health and safety.
(f) A decomposition gas management
program shall be implemented by the permittee under the provisions of the
facility’s approved operating plan and closure plan to assure that the facility
complies with the federal clean air act and state air quality standards.
(g)
A written plan for confined space entry, based on the standards
specified by Federal Occupational, Safety and Health Administration (OSHA)
requirements in 29 CFR 1910.146, shall be prepared and implemented as part of
facility operations.
(h)
For landfills with active gas extraction systems, the permittee shall
maintain authority for complete operational control of any and all gas
extraction wells and blower systems, together with at least one mechanism for
destroying the gas.
(i) The permittee may transmit landfill gas
collected using an active gas extraction system to other locations for use as
fuel, provided the permittee complies with all federal, state, and local
requirements that apply to the method by which the gas is transmitted.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2506.07); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
806.08 Inspections, Maintenance,
Monitoring, Reporting, and Recordkeeping Requirements.
(a)
This section establishes requirements, in addition to those requirements
specified in Env-Sw 1000 and Env-Sw
1100, for inspecting, maintaining, and monitoring landfills which have not
undergone closure pursuant to an approved closure plan, and specifies the
reporting and recordkeeping requirements related thereto.
(b)
Unless otherwise specified, the word “daily” as used in this section
shall mean on each operating day.
(c)
The permittee shall regularly inspect and maintain all facility
components, including:
(1) Roads;
(2) Berms;
(3) Active and inactive filling areas;
(4) Pipes;
(5) Vaults;
(6) Valves;
(7) Tanks;
(8) Ponds;
(9) Equipment;
(10) Temporary, intermediate, and final cover;
(11) Permanent and temporary fencing;
(12) Groundwater monitoring wells;
(13) Gas management and monitoring devices; and
(14) Electric panels, switches, relays, alarms, and
automatic dialers.
(d) At least once weekly, litter shall be
collected from fences, roadways, trees, and other areas, and stored or
disposed.
(e) Leachate management systems shall be
monitored, and the data reviewed by the permittee and recorded in the facility
operating records, as follows:
(1) The hydraulic head elevation on the liner
shall be measured at the low point of a cell, phase, or stage where leachate is
collected, and recorded:
a. At least once per month;
b. After each storm event greater than or equal
to the 2-year/24-hour storm; and
c. If the hydraulic head is found to be 12
inches or greater, daily until the hydraulic head is less than 12 inches;
(2) The quantity of leachate collected off the
liner systems and transported off-site or treated shall be measured daily, and
the destination recorded;
(3) Flow in the secondary leachate collection
system(s), shall be measured and recorded:
a. At least once per week; and
b. More frequently when required to complete the
reporting pursuant to (n) below;
(4) The average flow in the secondary leachate
collection system(s) occurring during the 30-day operating period preceding the
last measurement shall be calculated, recorded, and, when required pursuant to
(l) below, reported;
(5) Analytical characteristics, based on
representative samples taken from the primary leachate collection system in
April, July, and November, and, if liquid is present, from the secondary
leachate collection system in July, shall be determined for the following
parameters:
a. pH;
b Temperature;
c. Chemical oxygen demand (COD);
d Specific conductance;
e. Iron;
f. Manganese;
g. Sulfates;
h. Chlorides;
i. Chromium;
j. Lead;
k. Cadmium; and
l. Except for ash landfills, volatile organic
compounds (VOCs);
(6) Analytical characteristics, based on
representative samples taken from the primary leachate collection system in
July, shall be determined for the following additional parameters:
a. Per- and polyfluoroalkyl substances (PFAS) as
determined by EPA Method 1633;
b. Total solids (TS);
c. Total volatile solids (TVS);
d Total suspended solids (TSS);
e. Volatile suspended solids (VSS);
f. Five-day biochemical oxygen demand (BOD5);
g. Total Kjeldahl nitrogen (TKN);
h. Ammonia-nitrogen (NH3-N);
i. Total phosphorous;
j. Alkalinity;
k. Grease; and
l. Linear alkylbenzene sulfonate (LAS); and
(7) The liquid level in the leachate storage
tanks shall be measured on a daily basis at facilities not connected to a
wastewater treatment facility and on a weekly basis at facilities connected to
a wastewater treatment facility.
(f)
Landfill gas concentrations shall be measured no less than quarterly and
in accordance with Env-Sw 806.07.
(g)
Groundwater and surface water quality monitoring systems shall be
monitored, and the data reported as required pursuant to RSA 485-A or RSA
485-C, as applicable.
(h) Where electronic monitoring and recording
systems are used, including supervisory control and data acquisition systems,
the maximum value identified by the system for the subject monitoring period
shall be used for purposes of monitoring, recording, and reporting data in
accordance with this part.
(i) Permittees shall
file quarterly and annual reports in accordance with Env-Sw
303, according to the following schedule:
(1) Quarterly reports shall be filed no later
than 30 days following the end of the quarterly reporting period;
(2) Annual reports shall be filed no later than
March 31 of the year following the calendar year being reported; and
(3) For facilities managing putrescible wastes,
annual odor control evaluations shall be filed no later than August 31 of the
year following the year being reported, which reporting year shall be July 1
through June 30.
(j)
The quarterly report shall include:
(1) The name and permit number of the reporting
facility;
(2) The data specified by (d) and (e) above,
excluding leachate analytical data required by (d)(5) and (d)(6);
(3) Quantity and type of waste received by the
facility daily, in tons;
(4) Data units for each type of data reported;
(5) Reporting period or dates the data was
collected, for each type of data reported;
(6) Monthly and quarterly subtotals for each type
of data reported;
(7) A summary of complaints received, and
mitigation measures taken relative to each complaint; and
(8) A summary of leachate breakouts, including a
site plan showing the approximate location(s), and actions taken to address the
breakout.
(k)
The leachate analytical data required pursuant to (e)(5) and (e)(6),
above, shall be compiled, evaluated, and filed in accordance with Env-Sw 303, no later than 60 days following receipt of
analytical results.
(l)
Annual reports shall:
(1) Be prepared as specified by Env-Sw 1105.13 and Env-Sw 1105.14, as
applicable; and
(2) Include:
a. A summary of the facility inspection and
maintenance activities;
b. An analysis of remaining capacity based on a
site survey which identifies the remaining facility capacity;
c. A 5-year trend analysis of changes in flow
rates for primary and secondary leachate systems; and
d. A 5-year trend comparison of the leachate
indicator parameters of chloride, nitrate, TKN, iron, and manganese in the
primary leachate system to the same leachate indicator parameters in the
secondary leachate system.
(m) An annual odor control evaluation shall
include:
(1) Facility description, including a description
of the landfill gas collection and control system, and facility changes since
the previous reporting year;
(2) A review and evaluation of odor control
practices and measures employed by the facility during the reporting period,
including:
a. A comparison of those practices with industry
standard and best practices;
b. A review of odor control methods used at the
facility specifically including but not limited to control measures employed
for areas used to stage trucks waiting to off-load, the working face, locations
under construction, and locations without final cap; and
c. An assessment of the effectiveness of odor
control measures based on an evaluation of records compiled for odor events
including sludge, construction related odors, landfill gas odors, leachate
odors, and control methods used;
(3) A landfill gas collection system analysis,
including system design and development, for example, phased installation,
system and well field coverage, system design, and landfill gas collection,
recovery, and efficiency;
(4) Odor complaint analysis and summary, including
geographical trends, weather-related trends, temporal trends, such as,
time-of-day, seasonal, waste composition trends, working face location trends,
landfill cover trends, and landfill gas system function trends;
(5) Conclusions and recommendations, including
such relative to daily and routine operations, landfill gas system operations,
leachate management practices, construction practices, and odor complaint
reporting and response procedures;
(6) An implementation plan, including dates by
which the permittee has already or shall timely implement the recommendations;
(7) A status update regarding the implementation
of recommendations in prior odor control evaluation reports; and
(8) Figures, tables, and attachments, including a
site locus map, a gas extraction well location plan, a figure showing odor
complaints by location, figures showing graphical trends of landfill gas and
waste composition data relative to odor complaints and weather, tables
summarizing final cover installation and daily cover use as well as annual odor
complaints and surface emissions monitoring results, and logs of odor
complaints and waste loads rejected due to odors.
(n) The following reporting requirements shall
apply to the average secondary leachate collection system flow rates occurring
over a 30-day period:
(1) Rates less than or equal to 25 gallons per
tributary acre per day shall be reported to the department in accordance with
(h) above;
(2) Rates which exceed 25 gallons per tributary
acre per day shall be reported to the department in accordance with Env-Sw 1005.09, except for flow which the department agrees is
the result of the dewatering of the drainage layer following construction; and
(3) Rates which exceed 50 gallons per tributary
acre per day shall:
a. Be reported to the department in accordance
with Env-Sw 1005.09; and
b. Require the permittee to submit to the
department a report of the investigation into the cause(s) of the rate
exceedance(s) and a response action plan within 60 days of submitting the
report required by a. above.
(o) The response action plan required by (n)(3)
above:
(1) Shall include:
a. Confirmation of the source and cause(s) of the
increase in flow;
b. Response actions to address the cause(s); and
c. A schedule for implementing the response
action plan; and
(2) May include but is not limited to the
following response actions necessary to remedy the likely cause of the problem:
a. Increasing monitoring and reporting;
b. Instituting operational changes to limit
hydraulic head on the overlying liner;
c. Locating and repairing leak(s);
d. Retrofitting the overlying liner; or
e. Closing part or all of the facility.
(p)
Upon receipt of solid waste by a landfill, the permittee shall obtain a
written statement bearing the signature or electronic equivalent of the
transporter certifying that the following information is true and correct to
the best of the transporter’s knowledge and belief:
(1) The printed or typed name and mailing address
of the person delivering the solid waste;
(2) The date of delivery;
(3) A declaration of the total number of tons of
solid waste being delivered to the facility; and
(4) The point of origin of the waste contained in
each load, identified by individual state, and number of tons from that state.
(q) Destruction of facility records or electronic
storage of facility records shall not occur unless approved pursuant to the
provisions for a permit modification in accordance with Env-Sw
315.
(r) The landfill owner shall attach notification
to the property deed that a landfill exists on the property and cause the
notification to be recorded at the registry of deeds in the county where the
property is located within 30 days of commencing operations.
(s)
Proof of notification of filing pursuant to (p) above shall be provided
to the department by the permittee within 30 days of commencing placement of
waste.
(t)
Notification pursuant to (p) shall include the following information:
(1) A statement that a landfill exists on this
property;
(2) Identification of the book and page numbers
in the registry of deeds where title to the property is recorded;
(3) Identification of the property tax map and lot
numbers as identified by the political subdivision in which the facility is
located;
(4) Latitude and longitude of a known fixed point
at the landfill site; and
(5) The facility name, permit number, and
standard permit issuance date.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; ss by #8459, eff
10-28-05 (formerly Env-Wm 2506.08); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
806.09 Other Operating Standards.
(a)
Equipment for spreading, compacting, and covering solid wastes under all
anticipated weather conditions shall be available and in operating condition at
all times.
(b)
Auxiliary equipment shall be available and maintained in operational
condition.
(c)
Salvaging of solid waste shall be controlled so as not to interfere with
landfill operations and not to harbor vectors or otherwise result in violating
the universal facility requirements in Env-Sw 1000.
(d)
Salvaging that constitutes landfill reclamation shall be subject to Env-Sw 808.
(e)
The permittee shall investigate the occurrence of flow rate in the
secondary leachate collection system that exceeds 50-gallons per tributary acre
per day and which cannot be reasonably attributed to the dewatering of the
drainage layer following construction.
(f)
The permittee shall post on its facility website a “contact us” form or
a specific telephone number and email address for the public to use to submit
questions and issues relating to the facility.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2506.09); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
806.10 Construction and Demolition
Debris Landfill Operating Requirements.
Landfills receiving construction and demolition debris shall comply with
the operating standards set forth in this part and in Env-Sw
805.14.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2506.10); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
806.11 Asbestos Waste Landfill
Operating Requirements. Landfills
receiving asbestos shall operate in compliance with Env-Sw
901, this part, and Env-Sw 805.15.
Source. #5172, eff 7-1-91; amd
by #5297, eff 12-24-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss
by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm
2506.11); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24
Env-Sw
806.12 Prohibitions. The
following wastes shall not be landfilled:
(a)
Untreated infectious waste;
(b)
Contained gaseous waste;
(c)
Liquid wastes
(d)
Wet cell batteries, and after June 30, 2025, lithium-ion batteries, and
electronic devices, pursuant to RSA 149-M:27, II;
(e)
Leaf or yard waste, except as provided in RSA 149-M:27, III;
(f)
Video
display devices, central processing units from computers, or non-mobile video
display
media recorders or players, pursuant to RSA 149-M:27, IV;
(g) Food waste after January 31, 2025, pursuant
to RSA 149-M:27, V;
(h)
Mercuric oxide batteries, pursuant to
RSA 149-M:28, IV; and
(i) Mercury-added
products, pursuant to RSA 149-M:58, I.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2506.12); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
PART Env-Sw 807 CLOSURE
REQUIREMENTS
Env-Sw
807.01 Applicability.
(a)
The rules in this part shall apply to closure of all landfills, except:
(1) Facilities that have closed in accordance
with a department-approved closure plan and have achieved the performance
standards in Env-Sw 807.04;
(2) Permit-exempt facilities, operated and closed
in compliance with the exemption;
(3) Permit-by-notification facilities having an
active life of 90 days or less, which have operated and closed in compliance
with the permit-by-notification;
(4) Research and development permit facilities as
provided by Env-Sw 312.02(b); and
(5) Emergency permit facilities as provided by
Env-Sw 313.02(b).
(b)
The closure requirements in this part shall apply as the complement of
the closure requirements in Env-Sw 1006 for all
facilities, Env-Sw 1106 for facilities having an
active life longer than 90 consecutive days, and, depending on the type of
waste managed, Env-Sw 900.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2507.01); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
807.02 Closure Scheduling.
(a)
Except as noted in (b) below, a landfill which has operated in
compliance with its permit shall be subject to closure on a schedule specified
in the permit based on the facility capacity and life expectancy.
(b)
A landfill which holds a temporary permit shall be subject to closure on
a schedule determined pursuant to Env-Sw 307.
(c) Other circumstances which shall provide cause
for closure shall be as specified in Env-Sw 1006.01.
Source. #5172, eff 7-1-91; ss by #6535, INTERIM, eff
7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; amd
by #6894-B, eff 12-1-98; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm
2507.02); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24
Env-Sw
807.03 Landfill Closure and
Post-Closure Requirements.
(a)
Landfills shall be closed in accordance with an approved closure plan.
(b) Subject to (c), below, landfill closure and
post-closure activities shall involve all activities required at a facility to
achieve the performance standards in Env-Sw 807.04,
including:
(1) Terminating active use of the facility;
(2) At unlined landfills, investigating the
extent of waste to groundwater contact zones, if any, and if required under RSA
485-C:
a. Removing the waste out of groundwater; or
b. Lowering the groundwater table;
(3) Consolidating landfilled waste within the
permitted footprint, grading slopes, and otherwise configuring the facility for
acceptance of a capping system that meets the requirements of Env-Sw 805.10;
(4) Constructing and maintaining a capping system
at the facility which meets the standards set forth in Env-Sw
805.10;
(5) Constructing, operating, and
maintaining a stormwater management system for the capped facility and site so
as to redirect run-on and run-off away from the cap of the landfill, reduce the
amount of leachate generated, and reduce the potential for erosion in
accordance with the standards set forth in Env-Sw
805.09 and Env-Sw 806.06;
(6) Operating and maintaining the facility's
leachate management system in accordance with Env-Sw
806.05 and in accordance with a schedule specified in the approved post-closure
care plan;
(7) Operating, maintaining, and monitoring the
facility’s leak detection system(s) in accordance with the provisions of the
approved post-closure care plan;
(8) Constructing, operating, and maintaining the
facility’s groundwater and surface water monitoring system and implementing the
facility’s approved post-closure groundwater and surface water monitoring
program in accordance with RSA 485-C;
(9) Constructing, operating, and maintaining the
facility's decomposition gas control and migration monitoring systems as
applicable, in accordance with Env-Sw 805.18 and Env-Sw 806.07;
(10) Monitoring settlement, both by visual
inspection and by topographic survey using established control points, and
making related repairs to the facility as needed including the repair of areas
where settlement exceeds the capping system’s design tolerances and the repair
of areas where settlement results in the loss of positive drainage;
(11) Providing control of access to the facility
in accordance with Env-Sw 1103 and to facilitate
compliance with the performance standards provided in Env-Sw
807.04 and to otherwise limit threats to public health, safety, and the
environment;
(12) Providing financial assurance for the cost of
post-closure monitoring, in accordance with Env-Sw
1400;
(13) Meeting all requirements in Env-Sw 807.05 and filing all reports with the department in
accordance with Env-Sw 1105.14; and
(14) Undertaking any other activities, including
repair and remedial activities, as necessary to achieve compliance with Env-Sw 807.04.
(c)
Maintaining a closed landfill or any component thereof shall include all
inspection, monitoring, and repair work required to satisfy the performance
standards in Env-Sw 807.04 and the reporting
requirements in Env-Sw 807.05.
(d)
For landfills existing prior to October 29, 1997
and located on property not owned by the permittee, the permittee shall obtain
legal rights of access to the property prior to facility closure for the
purpose of meeting all required closure and post-closure obligations at the
facility in accordance with the solid waste rules. Such legal rights of access shall be for a
period of not less than 99 years.
Source. #5172, eff 7-1-91; amd
by #5297, eff 12-24-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss
by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm
2507.03); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24
Env-Sw
807.04 Performance Standards. The permittee shall implement an approved
closure plan requiring that:
(a)
The facility and site effectively cease generating leachate;
(b)
The facility and site effectively cease generating decomposition gases;
(c) The facility and site achieve maximum
settlement, with the capping system intact and no reasonable expectation that
integrity of the capping system will be at risk without regular maintenance;
(d)
The facility and site have no adverse impact to air, groundwater, or
surface water; and
(e)
The facility and site do not otherwise pose a risk to human health or
the environment.
Source. #5172, eff 7-1-91; amd
by #5297, eff 12-24-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss
by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm
2507.04); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24
Env-Sw
807.05 Post-Closure Care and
Reporting Requirements.
(a)
The post-closure period of a landfill shall be the period required to
demonstrate the facility has achieved the performance standards specified in
Env-Sw 807.04.
(b)
During the post-closure period, the permittee shall have specific
obligations to regularly inspect, monitor, and maintain the facility in
conformance with the solid waste rules based on the provisions of a post-closure
care plan.
(c)
Subject to (d) below, solely for the purposes of determining financial
assurance requirements, the post-closure period for landfills shall be 30 years
from the date the complete capping system is installed, or the date of the last
most recent estimate obtained by the permittee as required by Env-Sw 1405.02, whichever is later.
(d)
The post-closure period shall be subject
to periodic adjustment by implementing the permit modification procedures in
Env-Sw 306 and Env-Sw 315
as follows:
(1) In the event that post-closure monitoring
data or other available information provides an indication that the required
performance standards are unlikely to be achieved during the
approved post-closure monitoring period:
a. The permittee shall identify the likely
cause(s) in a report to the department; and
b. Depending on the cause(s), the department
shall adjust the post-closure monitoring period or require the permittee to
implement repair or remedial closure or post-closure work, pursuant to the
permit modification procedures in Env-Sw 306; or
(2) In the event the permittee believes that
post-closure monitoring data and other available information provides
sufficient evidence that the required performance standards are achieved at the
facility, the permittee may submit an application for permit modification
pursuant to Env-Sw 315 to request an appropriate
reduction in the post-closure period for the facility.
(e)
A detailed post-closure care plan shall be developed and implemented by
the permittee to assure compliance with Env-Sw
807.03, Env-Sw 807.04, Env-Sw
1106, and this section. The plan shall be a condition of the facility’s permit.
(f)
All facility systems shall be thoroughly monitored and inspected on a
schedule that is initially the same as required of operating facilities in Env-Sw 806.08.
(g) The permittee may request a decrease in the
frequency of monitoring and inspections based on a favorable comparison of the
performance expectations and actual performance but in no case shall
inspections occur less than semi-annually.
(h)
Inspections shall:
(1) Be conducted twice annually, one conducted in
the period between January 1 and June 30, and the other conducted in the period
between July 1 and December 31;
(2) Be conducted at a minimum of 3 months apart;
and
(3) Be recorded and the report submitted to the
department within 30 days following completion of inspection.
(i) Pursuant to Env-Sw
1105.14, the permittee shall file an annual report with the department
including an assessment of whether the facility is achieving the performance
requirements in Env-Sw 807.04.
(j)
The permittee shall notify the department in accordance with Env-Sw 1005.09 when facility damage, malfunction, or
sub-standard performance occurs at the facility.
(k)
Following completion of the capping system construction, the permittee
shall file record drawings for the closed facility in accordance with Env-Sw 1104.07.
(l)
Unless previously performed under Env-Sw
806.08(r), the permittee shall attach notification to the property deed that a
landfill exists on the property and cause the notification to be recorded at
the registry of deeds in the county where the property is located.
(m)
Proof of notification filing pursuant to (l) above shall be provided to
the department by the permittee with the submission of record drawings pursuant
to (k) above.
(n)
Notification pursuant to (l) shall include the following information:
(1) A statement that a landfill exists on this
property;
(2) Identification of the registry of deeds,
book, and page numbers where title to the property is recorded;
(3) Identification of the property tax map and lot
numbers as identified by the political subdivision in which the facility is
located;
(4) Latitude and longitude of a known fixed point
at the landfill site;
(5) Description of the facility, including size,
type of wastes received, type of liner if any, and type of cap;
(6) Description of closure implemented, and
identification of the permit issued by the department under which closure
occurred, including a statement that the permit might contain certain legal
obligations regarding the site;
(7) A statement that any future change in use
shall be subject to review and approval by the department pursuant to Env-Sw 807.06;
(8) A statement that post-closure use of the
property shall not disturb the integrity of the final cover, liners, or any
other components of the containment systems or the function of the monitoring
systems unless approved by the department via the applicable permit or permit
modification as specified in Env-Sw 311 through Env-Sw 315; and
(9) A statement that access shall be assured to
department inspection personnel and the permittee for monitoring and
maintenance purposes.
(o) The permittee shall implement such repairs or
remedial activities as necessary to assure compliance with the performance
standards set forth in Env-Sw 807.04 and other
requirements of this chapter.
Source. #5172, eff 7-1-91; amd
by #5297, eff 12-24-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss
by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm
2507.05); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24
Env-Sw
807.06 Post-Closure Use.
(a) The permittee shall obtain department
approval, via the permit modification procedures in Env-Sw
315, for any post-closure use or activity at the site not specifically approved
in the facility’s permit.
(b) A post-closure use shall not increase the
potential hazards to public health, safety, and the environment from the closed
landfill.
(c) A post-closure use shall not preclude access
to components of the landfill closure system for purposes of inspection,
maintenance, monitoring, and repair.
(d) A post-closure use shall not cause damage to
any component of the landfill closure system as specified in Env-Sw 1004.04.
(e) If damage occurs to any component of the
landfill closure system during post-closure use, the damage shall be repaired
in a timely manner and the incident reported to the department in accordance
with Env-Sw 1005.09.
(f) Residential and commercial buildings, except
buildings used for landfill operation, maintenance, and post-closure care,
shall be prohibited on top of or within 100 feet of the landfill footprint or
property line, whichever is less.
(g) The following information shall be included
with the application for permit modification for post-closure use:
(1) A description of the proposed post-closure
use;
(2) The intended start date of the proposed
post-closure use or activity, and the proposed duration;
(3) A site plan showing the proposed location(s)
of post-closure use and existing components of the landfill closure systems,
including monitoring points;
(4) Post-closure use design plan(s);
(5) Record drawings of landfill closure systems
located within 100 feet of the post-closure use or activity;
(6) An updated post-closure care plan as specified
in Env-Sw 807.05(e);
(7) An evaluation of the available environmental
monitoring data and other information pertaining to the facility conditions and
the proposed post-closure use including a statement by a qualified professional
engineer identifying whether the proposed post-closure use will meet the
requirements of (b) above;
(8) A plan for the repair of any disturbance or
damage to the landfill and associated infrastructure, including the capping
system;
(9) A plan for the protection of all existing
landfill components including liners, leachate collection piping, gas recovery
systems, stormwater systems, and other landfill infrastructure present;
(10) Updated financial assurance plan in accordance
with Env-Sw 1400; and
(11) Certification, signed by the applicant, that
the proposed activity shall not adversely affect the post-closure care of the
landfill.
(h)
Post-closure use requiring construction shall follow the applicable
requirements of Env-Sw 1104.
(i) Following
termination of a post-closure use or activity, the facility shall be restored
to conditions that existed prior to commencing the post-closure use.
Source. #14156, eff 12-21-24
PART Env-Sw 808 LANDFILL
RECLAMATION
Env-Sw
808.01 Applicability. The rules in this part shall apply to
facilities where landfill reclamation activities occur.
Source. #5172, eff 7-1-91; amd
by #5297, eff 12-24-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss
by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm
2508.01); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24
Env-Sw
808.02 Pre-Requisites for Landfill
Reclamation.
(a)
Prior to conducting landfill reclamation activities, the permittee
shall:
(1) Obtain approval of a feasibility study
scope-of-work meeting the requirements in Env-Sw
808.03(b) pursuant to the standard permit process in Env-Sw
314 or the permit modification process in Env-Sw 315;
(2) Submit a report meeting the requirements of
Env-Sw 808.03(c) to the department documenting the
results of the feasibility study;
(3) Obtain approval of a landfill reclamation work
plan meeting the requirements of Env-Sw 808.04
pursuant to the permit modification process in Env-Sw
315; and
(4) After complying with (1) through (3) above,
receive approval from the department to commence reclamation
activities.
Source. #5172, eff 7-1-91; amd
by #5297, eff 12-24-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss
by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm
2508.02); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24
Env-Sw
808.03 Feasibility Study.
(a)
The permittee shall complete a feasibility study prior to seeking
approval to conduct any landfill reclamation activities.
(b)
The scope-of-work for the feasibility study shall include:
(1) The reclamation project goals;
(2) Provisions for
a review of existing background information to include:
a. Site inspections and personnel interviews;
b. Operating history and waste receipt records;
c. Analytical data and engineering records; and
d. Permittee, facility owner, property owner,
facility operator, host municipality, host solid waste district, and department
records;
(3) A proposed field investigation to include:
a. A site plan showing the location of all
proposed work areas;
b. The proposed number and location of all test
borings, trenches, and test pits, and their estimated depth and volume;
c. A description of all excavation and materials
handling operations;
d. A description of all material quantification
methods, laboratory analyses, test burns, and other tests or methods that will
be used to characterize and estimate the quantities of recyclable materials,
soils, combustibles, and other reclaimed materials;
e. A plan for the repair of any disturbance or
damage to the landfill and associated infrastructure, including the capping
system and groundwater monitoring wells; and
f. A plan for the protection of all existing
landfill components including liners, leachate collection systems, active or
passive decomposition gas collection and control systems, stormwater management
systems, and other landfill infrastructure;
(4) A proposed work schedule that includes the
intended starting date of the field investigation and the discrete field
activities to be performed; and
(5) A contingency plan as described in Env-Sw 808.05.
(c)
No later than 90-days following completion of the field investigation,
the permittee shall submit a report to the department documenting the results
of the feasibility study which shall include the following:
(1) A summary of existing background information;
(2) The results of the field investigation,
including:
a. The results of all sampling and analyses
performed on excavated materials;
b. The logs of all excavations, including test
pits and test borings, and a site plan showing the locations and identification
of each such excavation; and
c. The composition and relative quantities of
excavated materials, including recyclable materials, combustibles, soils, and
other materials such as asbestos waste;
(3) An evaluation of the suitability of the
excavated materials for reuse or recycling, the need for further processing and
the expected final disposition of all materials reclaimed from the landfill as
well as the final disposition of any waste materials not reclaimed;
(4) An assessment of potential landfill
reclamation costs and if applicable following reclamation activities, the
revised landfill closure costs estimated in accordance with Env-Sw 1400;
(5) Identification and assessment of the
potential impacts associated with landfill reclamation, including potential
pathways for nuisance conditions and off-site contamination, and methods for
mitigating impacts associated with landfill reclamation; and
(6) An evaluation of the reclamation project
goals and a determination if landfill reclamation is feasible at the subject
facility.
Source. #5172, eff 7-1-91; amd
by #5297, eff 12-24-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss
by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm
2508.03); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24
Env-Sw
808.04 Landfill Reclamation Work Plan.
(a)
If landfill reclamation is determined to be feasible in accordance with
Env-Sw 808.02, and prior to conducting landfill
reclamation activities, the permittee shall obtain approval of a landfill
reclamation work plan pursuant to Env-Sw 315.
(b)
A landfill reclamation work plan shall include the following:
(1) A detailed plan for the management and control
of odors, which specifically addresses measures to avoid the dispersion of
offensive odors and includes provisions for work stoppage in the event planned
odor control measures fail;
(2) A map showing the location of all buildings
within 2,000 feet of the reclamation area and the direction of prevailing
winds;
(3) A site plan which details the proposed
reclamation area and delineates in plan and cross-sectional view the depth of
excavation, proximity to the liner and leachate collection system, if any,
other landfill structures and components, and the direction in which the
landfill reclamation will progress;
(4) A description of the excavation and sorting
procedures for all removed materials;
(5) A contingency plan in accordance with Env-Sw 808.05;
(6) A description of all procedures, including
quality assurance and quality control provisions, for processing, testing,
storage, removal, transfer, use, and disposal of excavated materials;
(7) Identification of any special waste handling
procedures required during reclamation activities;
(8) A stormwater management and leachate
management plan; and
(9) The procedure for site clean-up and grading
after the reclamation with detailed drawings depicting original and final
grades.
(c) If construction or reconstruction of landfill
systems is required during or following reclamation activities, the permittee
shall obtain approval of construction plans pursuant to the permit modification
requirements of Env-Sw 315 and adhere to the
construction requirements in Env-Sw 1104.
Source. #5172, eff 7-1-91; ss by #6619-B, eff
10-29-97; (See Revision Note at chapter heading for Env-Sw
800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2508.04); ss by #10597, eff
7-1-14; ss by #14156, eff 12-21-24
Env-Sw
808.05 Site Safety and Contingency
Plan. A site safety and contingency
plan shall include the following:
(a)
A description of actions to be taken with respect to personnel safety,
on-site personnel injury, fires, explosions, landfill gases, dust, odor, noise,
vectors, and excavation and release of hazardous substances or toxic materials;
(b)
Hazard evaluation and protection from potential hazards, including
engineering controls, personal protection equipment, and air monitoring
techniques;
(c)
Designation of exclusion, decontamination and support zones,
decontamination procedures, on-site communication procedures, emergency
procedures, and access control; and
(d)
Designation of a qualified, full-time site health and safety
coordinator.
Source. #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2508.05); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
808.06 Reclamation Activities.
(a) Reclamation activities shall be approved as
construction activities by the department in accordance with Env-Sw 1104.
(b) Reclamation activities shall be conducted by
the permittee in accordance with the construction requirements of Env-Sw 1104.
Source. #14156, eff 12-21-24
Env-Sw
808.07 Landfill Footprint Reduction. If reclamation
activities result in a landfill footprint reduction, the areas from which
wastes were not removed shall be subject to the closure requirements of Env-Sw 807.
Source. #14156, eff 12-21-24
PART Env-Sw 809 RESERVED
PART Env-Sw 810 PERMIT-EXEMPT
LANDFILLS
Env-Sw
810.01 Purpose. The purpose of the rules in this part is to
identify landfills which are permit-exempt, pursuant to Env-Sw
302.03.
Source. #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2510.01); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
810.02 General Exemption Provisions.
(a) The landfills described in this part shall be
exempt from obtaining a permit, subject to the requirements in Env-Sw 810.03.
(b)
A permit exemption shall not affect a person’s obligation to obtain all
requisite federal, state, or local permits, licenses, or approvals, or to
comply with all other applicable federal, state, district, or local permits,
ordinances, laws, or approvals or conditions pertaining to the permit-exempt
activities.
Source. #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2510.02); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
810.03 Exemption Conditions. All permit-exempt landfills identified in this
part shall comply with the following requirements:
(a) A permit-exempt landfill shall not be located
on property that is subject to any ongoing enforcement action by the
department, unless approved by the presiding authority over the enforcement
action, such as the department in an action commenced under Env-C 204, an
environmental council over an administrative action appealed pursuant to RSA
21-O:14, or the judge in a civil action brought before a court of competent
jurisdiction;
(b)
A permit-exempt landfill shall not adversely affect the operation and
closure of any existing facility;
(c)
The owner of the property on which the facility is located shall be
designated as the permittee and subject to all obligations related thereto;
(d)
At all times during facility operations, the permittee shall maintain
cover materials at the facility site in a sufficient quantity as to comply with
the applicable cover requirements;
(e)
During the active life of the facility, the permittee shall control
access to the facility in a manner as to prevent unlawful dumping;
(f)
The permittee shall close the facility in conformance with Env-Sw 1006 and the following:
(1) No less than 2 feet of clean, compacted soil,
and more when specified by the rules in this part, shall be placed as final
cover over all landfilled waste;
(2) Final cover shall be properly graded, seeded,
and mulched to produce and sustain vegetative growth, or otherwise stabilized
to prevent erosion;
(3) The permittee shall regularly inspect the
facility to assure that the cover materials maintain their integrity, that
voids and sink holes do not develop, and that the site is otherwise protective
of the environment, public health and safety; and
(4) The permittee shall implement repairs or take
other remedial action as necessary to achieve and maintain compliance
therewith;
(g)
The facility shall comply with all other requirements specified in Env-Sw 1000 and, depending on the type of waste managed at the
facility, Env-Sw 900; and
(h)
All waste managed at the facility shall be actively managed.
Source. #6619-B, eff 10-29-97; amd
by #6894-B, eff 12-1-98; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm
2510.03); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24
Env-Sw
810.04 On-site Asphalt and Masonry
Debris Landfills. Asphalt and
masonry debris buried at the waste generation site pursuant to Env-Wm 2510.04
as effective on October 29, 1997 shall not be required
to be removed provided that:
(a)
The facility buried the following waste types only:
(1) Fully cured asphalt, concrete, brick, cement,
or other inert masonry materials substantially free of protruding reinforcing
materials;
(2) Fully cured asphalt which is not ground or
pulverized; or
(3) A combination thereof;
(b) The buried waste does not include any
materials or substances that have the potential to leach contaminants to
groundwater or surface water or to emit pollutants to the air, including lead
paint, asbestos, or chemicals;
(c)
The waste was buried in a manner as to preclude the development of sink
holes and to otherwise be protective of the environment, public health and
safety; and
(d)
The waste was buried at least 75 feet from all water supply wells and
surface waters and at least 4 feet above the seasonal high water table and
bedrock.
Source. #6619-B, eff 10-29-97; ss by #6894-B, eff
12-1-98; (See Revision Note at chapter heading for Env-Sw
800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2510.04); ss by #10597, eff
7-1-14; ss by #14156, eff 12-21-24
Env-Sw
810.05 Leachfield
Repair Residuals Landfills. Subject
to Env-Sw 810.03, no permit shall be required to bury
waste soil and stone from the repair or replacement of existing leaching fields
regulated under Env-Wq 1000, provided that:
(a)
The burial location shall be on the same property as the waste
generation site;
(b)
The buried waste shall be placed at least 4 feet above the seasonal high
water table and bedrock; and
(c)
The burial location shall meet the minimum separation distances for
leach bed trenches required in Env-Wq 1008.
Source. #6619-B, eff 10-29-97; amd
by #6894-B, eff 12-1-98; ss by #8459, eff 10-28-05 (formerly Env-Wm 2510.05);
ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24
Env-Sw
810.06 Abandoned Underground
Structures. Subject to Env-Sw 810.03, no permit shall be required to bury in place
existing abandoned underground structures, such as foundation walls, footings,
pipes, and culverts, provided that:
(a)
The abandoned structure shall not include:
(1) Materials or substances that have the
potential to leach contaminants to groundwater or surface water or to emit
pollutants to the air;
(2) Treated wood;
(3) Insulation; or
(4) General construction and demolition debris;
(b)
The abandoned structure shall not be a structure which is required by
other rules or regulations to be removed;
(c)
The structure shall be buried in a manner as to preclude the development
of sink holes and to otherwise be protective of the environment, public health
and safety; and
(d)
The material used to fill and cover the structure shall not be a waste.
Source. #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2510.06); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
810.07 Incidental Animal Burial. Subject to Env-Sw
810.03, no permit shall be required to bury a deceased animal, provided that:
(a)
The person controlling the land where the animal is buried shall agree
to the location of the grave site;
(b)
The grave shall be covered with a sufficient quantity and depth of soil
as to avoid disturbance of the burial site by other animals; and
(c)
The grave site shall not constitute an animal burial ground as otherwise
regulated under the provisions of Env-Sw 810.08.
Source. #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05
(formerly Env-Wm 2510.07); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24
Env-Sw
810.08 Animal Burial Grounds. Subject to Env-Sw
810.03, no permit shall be required to bury animal carcasses not regulated
under Env-Sw 904.01(e) and not exempt pursuant to
Env-Sw 810.07, provided that:
(a)
The location shall be at least 100 feet from any property boundary or
surface water, and shall not be located within the well head
protection area of a community or non-transient, non-community water supply
well system as delineated in the department’s source water protection area
inventory;
(b) The buried material shall be placed at least 4
feet above the seasonal high water table and bedrock;
(c)
The carcasses shall be covered with at least 3 feet of clean fill
immediately following placement in the ground; and
(d) Written notification shall be provided to the
state veterinarian in instances where 10 or more carcasses are buried.
Source. #6619-B, eff 10-29-97; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2510.08); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Env-Sw
810.09 Off-site Stump Dumps. Subject to Env-Sw
810.03, no permit shall be required to bury stumps and tree parts thereof
received from off-site locations, provided that:
(a)
The burial site is:
(1) At least 75 feet from any water supply well;
(2) At least 25 feet from any property line; and
(3) At least 4 feet above the seasonal high
groundwater table;
(b)
The stumps and tree parts thereof are buried in a manner as to preclude
the development of sink holes and erosion of cover materials, and to otherwise
be protective of the environment, public health and safety; and
(c)
A notation is recorded in the chain of title for the property on which
the burial site is located, to include the following information:
(1) A statement that the property has been used
for the disposal of stumps and tree parts thereof;
(2) The date(s) the disposal activity took place;
(3) The location of the burial area(s), with
sufficient specificity as to allow an independent third party to locate the
area(s); and
(4) The estimated quantity of waste disposed on
the property.
Source. #7225, eff 3-31-00; (See Revision Note at
chapter heading for Env-Sw 800); ss by #8459, eff
10-28-05 (formerly Env-Wm 2510.09); ss by #10597, eff 7-1-14; ss by #14156, eff
12-21-24
Appendix A
|
Rule Sections |
State Statute(s) Implemented |
Federal Regulations Implemented |
|
Env-Sw 800 (see also specific sections listed below) |
RSA 149-M:6,
III; RSA 149-M:7, II, III, V, XIV, XVI; RSA 149-M:9 |
40 CFR 258 |
|
Env-Sw 806.05 |
RSA 149-M:6,
III; RSA 149-M:7, II, III, XIV; RSA 149-M:9 |
40 CFR 258.4 |
|
Env-Sw 806.12 |
RSA 149-M:27,
II, III, IV, V; RSA 149-M:28, IV; RSA 149-M:58, I |
|
Appendix B
|
Rule |
Title/ Date |
Obtain at: |
|
Env-Sw 805.03(d)(3) |
ASTM D698-12(2021): Standard Test
Methods for Laboratory Compaction Characteristics of Soil Using Standard
Effort (12,400 ft-lbf/ft3 (600 kN-m/m3))
(July 2021) |
ASTM International 100 Barr Harbor Drive PO Box C700 West Conshohocken, PA 19428-2959 Available electronically (Volume
abstract is free, full content may be purchased for $76): https://www.astm.org/d0698-12r21.html All ASTM
Standards available online, amounts vary by volume: https://www.astm.org/products-services/bos.html |
|
Env-Sw 805.03(d)(3) Env-Sw 805.16(e)(1)d. |
ASTM D 1557-12(2021): Standard Test
Methods for Laboratory Compaction Characteristics of Soil Using Modified
Effort (56,000 ft-lbf/ft3 (2,700 kN-m/m3)) (July 2021) |
ASTM International 100 Barr Harbor Drive PO Box C700 West Conshohocken, PA 19428-2959 Available electronically (Volume
abstract is free, full content may be purchased for $76): https://www.astm.org/d1557-12r21.html All ASTM
Standards available online, amounts vary by volume: https://www.astm.org/products-services/bos.html |
|
Env-Sw 805.16(e)(1)a. |
ASTM D6913/D6913M-17: Standard Test
Methods for Particle-Size Distribution (Gradation) of Soils Using Sieve
Analysis (February 2021) |
ASTM International 100 Barr Harbor Drive PO Box C700 West Conshohocken, PA 19428-2959 Available electronically (Volume
abstract is free, full content may be purchased for $99): https://www.astm.org/d6913_d6913m-17.html All ASTM
Standards available online, amounts vary by volume: https://www.astm.org/products-services/bos.html |
|
Env-Sw 805.16(e)(1)a. |
ASTM D7928-21e1: Standard Test Method
for Particle-Size Distribution (Gradation) of Fine-Grained Soils Using the
Sedimentation (Hydrometer) Analysis (June 2021) |
ASTM International 100 Barr Harbor Drive PO Box C700 West Conshohocken, PA 19428-2959 Available electronically (Volume
abstract is free, full content may be purchased for $99): https://www.astm.org/d7928-21e01.html All ASTM
Standards available online, amounts vary by volume: https://www.astm.org/products-services/bos.html |
|
Env-Sw 805.16(e)(1)b. |
ASTM D2434-22: Standard Test Methods for
Measurement of Hydraulic Conductivity of Coarse-Grained Soils (April 2022) |
ASTM International 100 Barr Harbor Drive PO Box C700 West Conshohocken, PA 19428-2959 Available electronically (Volume
abstract is free, full content may be purchased for $76): https://www.astm.org/d2434-22.html All ASTM
Standards available online, amounts vary by volume: https://www.astm.org/products-services/bos.html |
|
Env-Sw 805.16(e)(1)c. |
ASTM D4373-21: Standard Test Method for
Rapid Determination of Carbonate Content of Soils (June 2021) |
ASTM International 100 Barr Harbor Drive PO Box C700 West Conshohocken, PA 19428-2959 Available electronically (Volume
abstract is free, full content may be purchased for $69): https://www.astm.org/d4373-21.html All ASTM
Standards available online, amounts vary by volume: https://www.astm.org/products-services/bos.html |
|
Env-Sw 805.16(e)(1)e. |
ASTM D5084-24: Standard Test Methods for
Measurement of Hydraulic Conductivity of Saturated Porous Materials Using a
Flexible Wall Permeameter (August 2024) |
ASTM International 100 Barr Harbor Drive PO Box C700 West Conshohocken, PA 19428-2959 Available electronically (Volume
abstract is free, full content may be purchased for $119): https://www.astm.org/d5084-24.html
All ASTM
Standards available online, amounts vary by volume: https://www.astm.org/products-services/bos.html |
|
Env-Sw 805.16(e)(1)f. |
ASTM D1587/D1587M-15: Standard Practice
for Thin-Walled Tube Sampling of Fine-Grained Soils for Geotechnical Purposes
(November 2015) |
ASTM International 100 Barr Harbor Drive PO Box C700 West Conshohocken, PA 19428-2959 Available electronically: Volume abstract is free: https://www.astm.org/d1587_d1587m-15.html Withdrawn, but full content may still be
purchased for $75: https://store.accuristech.com/standards/astm-d1587-d1587m-15?product_id=1909240#document All ASTM
Standards available online, amounts vary by volume: https://www.astm.org/products-services/bos.html |