CHAPTER Env-Sw 800  LANDFILL REQUIREMENTS

 

Statutory Authority:  RSA 149-M:7

 

Revision Note:

 

          Document #8459, effective 10-28-05, readopted with amendments, renumbered, and redesignated former Chapter Env-Wm 2500 as Env-Sw 800, pursuant to a rules reorganization plan for Department rules approved by the Director of the Office of Legislative Services on 9-7-05.  The source notes for each section of Env-Sw 800 identify the former subtitle Env-Wm and number for the respective rule prior to Document #8459.

 

PART Env-Sw 801  APPLICABILITY

 

          Env-Sw 801.01  Applicability.  The rules in this chapter shall apply to landfills.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff  7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2501.01); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

PART Env-Sw 802  PERMITTING REQUIREMENTS

 

          Env-Sw 802.01  Permit Required.

 

          (a)  A permit issued pursuant to the solid waste rules shall be required for construction, operation, and closure of a landfill, unless exempt pursuant to Env-Sw 302.

 

          (b)  The type of permit required shall be as specified in Env-Sw 302.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2502.01); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 802.02  Permit Application Requirements.  The applicant for a landfill permit shall prepare the application in accordance with:

 

          (a)  Env-Sw 314 for a standard permit;

 

          (b)  Env-Sw 313 for an emergency permit;

 

          (c)  Env-Sw 312 for a research and development permit; and

 

          (d)  Env-Sw 311 for a permit-by-notification.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2502.02); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

PART Env-Sw 803  FEDERAL REQUIREMENTS FOR MSW LANDFILLS

 

          Env-Sw 803.01  Purpose.  The purpose of the rules in this part is to identify facilities subject to the federal requirements for municipal solid waste landfills (MSWLFs) in 40 CFR 258.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2503.01); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 803.02  Applicability.

 

          (a)  The rules in Env-Sw 803.03 identify the circumstances under which a MSWLF shall be subject to the requirements in 40 CFR 258.

 

          (b)  The rules in Env-Sw 803.04 identify the criteria in 40 CFR 258 and the solid waste rules which apply to MSWLFs which are subject to 40 CFR 258.

 

Source.  #5172, eff 7-1-91; ss by #6372, eff 11-16-96; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2503.02); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 803.03  Applicability of Federal Law.  In order to determine whether a MSWLF is subject to the requirements of 40 CFR 258, the following provisions and definitions from 40 CFR 258.1 and 40 CFR 258.2 shall apply:

 

          (a)  MSWLFs that stopped receiving waste on or before October 9, 1991 shall be exempt from the requirements of 40 CFR 258;

 

          (b)  MSWLFs that received 100 tons per day of waste or less after October 9, 1991 and stopped receiving waste prior to April 9, 1994 shall be exempt from the requirements of 40 CFR 258 except for the final cover requirements specified in 40 CFR 258.60(a) provided the final cover was fully installed by October 9, 1994.  If the final cover was not fully installed by October 9, 1994, the MSWLFs shall be subject to all requirements of 40 CFR 258;

 

          (c)  MSWLFs that received 100 tons per day of waste or less on or after April 9, 1994 shall be subject to all requirements of 40 CFR 258;

 

          (d)  MSWLFs that received greater than 100 tons per day of waste after October 9, 1991 and stopped receiving waste prior to October 9, 1993 shall be exempt from the requirements of 40 CFR 258 except for the final cover requirements specified in 40 CFR 258.60(a) provided the final cover was fully installed by October 9, 1994.  If the final cover was not fully installed by October 9, 1994, the MSWLFs shall be subject to all requirements of 40 CFR 258;

 

          (e)  MSWLFs that received greater than 100 tons per day of waste on or after October 9, 1993 shall be subject to all requirements of 40 CFR 258; and

 

          (f)  In determining the scope and applicability of the federal requirements, the definitions specified in 40 CFR 258.2 for the following terms shall be used:

 

(1)  “Active life”;

 

(2)  “Active portion”;

 

(3)  “Director of an Approved State”;

 

(4)  “Household waste”;

 

(5)  “Industrial solid waste”;

 

(6)  “Owner”;

 

(7)  “Saturated zone”;

 

(8)  “Sludge”;

 

(9)  “Solid waste”;

 

(10)  “State”;

 

(11)  “State director”; and

 

(12)  “Waste management unit boundary.”

 

Source.  #6372, eff 11-16-96; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2503.03); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 803.04  Standards Specific to MSWLFs Subject to 40 CFR 258.

 

          (a)  Any MSWLF that is identified by Env-Sw 803.03 as being subject to 40 CFR 258 shall comply with the following provisions of 40 CFR 258 in addition to the requirements in Env-Sw 900, Env-Sw 1000, Env-Sw 1100, Env-Sw 1400, Env-Sw 1600, and this chapter:

 

(1)  Location restrictions specified in 40 CFR 258.10 through 258.16;

 

(2)  Operating criteria specified in 40 CFR 258.20, 258.21, 258.23, 258.24, 258.28, and 258.29;

 

(3)  Design criteria specified in 40 CFR 258.40;

 

(4)  Groundwater monitoring and corrective action requirements specified in 40 CFR 258.53 through 258.58;

 

(5)  Closure and post-closure requirements specified in 40 CFR 258.60(i) and 258.61; and

 

(6)  Financial assurance mechanisms specified in 40 CFR 258.70 through 258.75.

 

          (b)  The provisions specified in (a)(1) through (a)(6) above shall not be waived under Env-Sw 202.

 

Source.  #6372, eff 11-16-96; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2503.04); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

PART Env-Sw 804  SITING REQUIREMENTS

 

          Env-Sw 804.01  Applicability.

 

          (a)  The siting requirements in this part shall apply to all landfills except:

 

(1)  Landfill footprints and associated infrastructure for which a permit or permit modification was issued prior to the 2024 readoption of the solid waste rules;

 

(2)  Permit-exempt facilities identified in Env-Sw 302.03 or Env-Sw 810;

 

(3)  Permit-by-notification facilities having an active life of 90 days or less;

 

(4)  Research and development permit facilities, as provided by Env-Sw 312.02(b); and

 

(5)  Emergency permit facilities, as provided by Env-Sw 313.02(b).

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; ss by #6894-B, eff 12-1-98; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2504.01); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 804.02  Groundwater Protection Standards.

 

          (a)  A landfill shall not be sited within the well head protection area of a community or non-community, non-transient water supply well system as delineated in the department's source water protection area inventory at https://www.des.nh.gov/climate-and-sustainability/conservation-mitigation-and-restoration/source-water-protection.

 

          (b)  A landfill and all associated stormwater, leachate, and decomposition gas infrastructure, except pipelines carrying leachate or decomposition gas offsite for processing or treatment, shall be located only in areas where groundwater monitoring for release detection, characterization and remediation can be conducted prior to a release having an adverse impact on groundwater quality at the property line.

 

          (c)  A landfill and all associated stormwater, leachate, and decomposition gas infrastructure shall be located only in areas where groundwater monitoring for release detection, characterization, and remediation can be conducted prior to a release having an adverse impact on a water supply.

 

          (d)  Undisturbed in-situ soils for 5 feet immediately beneath the footprint shall have a representative saturated hydraulic conductivity of 1 x 10-3 centimeters per second (cm/sec) or less, unless the landfill design meets the requirement in Env-Sw 805.03(e).

 

          (e)  The base of the bottom most liner system, or the base of the facility if unlined, shall be a minimum of 6 feet above the seasonal high groundwater table and the confirmed bedrock surface.

 

          (f)  Identification of the areas cited in (b) through (e) above shall be based upon a hydrogeologic investigation that includes:

 

(1)  Subsurface investigation(s) to characterize soils and bedrock at the site;

 

(2)  All site-specific information required to model the pre-construction and post-construction groundwater and surface water regimen; and

 

(3)  Other information as necessary to demonstrate compliance with the siting requirements in (b) through (e) above.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2504.02); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 804.03  Surface Water Protection Standards.

 

          (a)  The location of a landfill relative to surface water resources shall comply with the requirements of RSA 485-A.

 

          (b)  A landfill and all associated stormwater, leachate, and decomposition gas infrastructure shall be located only in areas where potential adverse impacts to surface water quality, due to erosion, sedimentation, siltation, flood, or discharge of contaminants, can be prevented or minimized and mitigated by facility design.

 

          (c)  A landfill and associated stormwater, leachate, and decomposition gas infrastructure shall be located such that a discharge, spill, leachate release, or other failure of the waste containment system or associated infrastructure will be detected and assessed, and remediation initiated prior to contamination reaching any perennial water body.

 

          (d)  The footprint of a landfill and leachate storage units shall not be located within:

 

(1)  For any first or second order perennial streams, 200 feet as measured from the closest bank of a stream; and

 

(2)  For any other perennial surface water body, 500 feet as measured from the closest bank of a stream and closest shore of a pond or lake, as applicable.

 

          (e)  The footprint of a landfill and leachate storage units shall not be located within 200 feet of a wetland within the jurisdiction of RSA 482-A, excluding any drainage appurtenances related to the site, that is not allowed to be filled under the authority of RSA 482-A.

 

          (f)  The footprint of a landfill and leachate storage units shall not be located within 1,000 feet of a surface water reservoir or intake used for a community drinking water supply.

 

          (g)  The footprint of a landfill and leachate storage units shall not be located within the 500-year floodplain.

 

          (h)  Identification of the areas cited in (a) through (g) above shall be based on a hydrologic investigation that demonstrates the following:

 

(1)  Compliance with the siting requirements in (a) through (g) above;

 

(2)  That engineering design measures can be incorporated to control erosion, sedimentation, and siltation; and

 

(3)  Any potential release of contaminants to surface waters can be prevented or, in the case of a release, detected and remediated prior to reaching a surface water.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2504.03); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 804.04  Set-back Requirements.

 

          (a)  There shall be a minimum 100-foot setback between the property line and the footprint of the landfill.

 

          (b)  There shall be a minimum 300-foot buffer between the footprint of the landfill and class I and class II roads and a minimum 100-foot buffer between the footprint of the landfill and class III through class VI roads.

 

          (c)  There shall be a minimum 500-foot setback between the footprint of the landfill and all properties not owned by the applicant or its affiliates that contain residences, residential care facilities, nursing homes, prisons, or that are zoned for residential use.

 

          (d)  There shall be a minimum 1,000-foot setback between the footprint of the landfill and all properties containing public schools, licensed day care facilities, and hospitals.

 

          (e)  The footprint of a landfill or landfill expansion receiving putrescible wastes shall not be located within 10,000 feet of any airport runway used by turbojet aircraft or 5,000 feet of any airport runway used by only piston-type aircraft.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2504.04); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 804.05  Geologic Siting Limitations.

 

          (a)  The footprint of a landfill and associated leachate storage units shall be a minimum of 200 feet from faults that have had displacement in Holocene time, meaning from Pleistocene to present or within the last 11,000 years.

 

          (b)  No landfill footprint or associated stormwater, leachate, or decomposition gas, infrastructure shall overlie an area underlain by karstified dolomite or limestone or an area susceptible to mass movements of earth material such as landslides, rockfalls, mudslides, slumps, earth flows, or subsidence.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2504.05); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 804.06  Property Ownership.  A landfill or landfill expansion shall be sited only on property which is owned by the permittee.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2504.06); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

PART Env-Sw 805  DESIGN AND CONSTRUCTION REQUIREMENTS

 

          Env-Sw 805.01  Applicability.

 

          (a)  The design requirements in this part shall apply to all landfills, except:

 

(1)  Portions of existing permitted facilities which were constructed or a facility for which final design plans and specifications are approved for construction in accordance with Env-Sw 315 as of the 2024 effective date of this chapter;

 

(2)  Permit-exempt facilities identified in Env-Sw 302.03 or Env-Sw 810;

 

(3)  Permit-by-notification facilities having an active life of 90 days or less;

 

(4)  Research and development permit facilities, as provided by Env-Sw 312.02(b); and

 

(5)  Emergency permit facilities, as provided by Env-Sw 313.02(b).

 

          (b)  The design requirements in this part shall apply as the complement of the design requirements in Env-Sw 1004 for all facilities, Env-Sw 1103 for facilities having an active life longer than 90 days, Env-Sw 1200 for permit-by-notification facilities and, depending on the type of waste managed, Env-Sw 900.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2505.01); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 805.02  General Landfill Design Requirements.

 

          (a)  A lined landfill shall incorporate the following design features:

 

(1)  A foundation pursuant to Env-Sw 805.03;

 

(2)  A liner system pursuant to Env-Sw 805.05;

 

(3)  A leak detection and location system pursuant to Env-Sw 805.07;

 

(4)  A groundwater and surface water monitoring system, if required pursuant to RSA 485-C and Env-Or 700;

 

(5)  A stormwater management system pursuant to Env-Sw 805.09;

 

(6)  A decomposition gas control and migration monitoring system pursuant to Env-Sw 805.18;

 

(7)  A final capping system pursuant to Env-Sw 805.10; and

 

(8)  Facility structures as necessary to house, maintain, and repair equipment and supplies, and to accommodate the needs of facility personnel relative to shelter, sanitation, and communication.

 

          (b)  An unlined landfill shall incorporate the following design features:

 

(1)  A groundwater and surface water monitoring system, if required by RSA 485-A or RSA 485-C;

 

(2)  A stormwater management system pursuant to Env-Sw 805.09;

 

(3)  A decomposition gas control and migration monitoring system pursuant to Env-Sw 805.18;

 

(4)  A final capping system pursuant to Env-Sw 805.10; and

 

(5)  Facility structures as necessary to house, maintain, and repair equipment and supplies, and to accommodate the needs of facility personnel relative to shelter, sanitation, and communication.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2505.02); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 805.03  Landfill Subgrade and Base Grade Standards.

 

          (a)  The landfill subgrade shall:

 

(1)  Underlie the base identified in (d) and (e) below;

 

(2)  Be graded and prepared for landfill construction; and

 

(3)  Have sufficient structural integrity to support the facility under all anticipated loading conditions during all phases of construction, operation, and closure.

 

          (b)  Engineering measures shall be incorporated in the design when necessary to ensure stability of the landfill during all phases of construction, operation, and closure.

 

          (c)  Stability analyses shall be submitted with the application to demonstrate compliance with requirements in (a) above and to support the facility design, including measures incorporated pursuant to (b) above, if any.

 

          (d)  For geomembrane lined facilities, the base below the liner and above the subgrade shall:

 

(1)  Be prepared to a depth of not less than 12 inches, except as provided in (e) below, and provide a uniform and consistent bedding layer which shall be stable under loading;

 

(2)  Contain no stones greater than one inch in diameter, and no sharp or angular materials;

 

(3)  Be compacted to 95% of the maximum dry density as determined by ASTM International (ASTM) D698-12(2021) (Standard Effort) or ASTM D1557-12(2021) (Modified Effort) as available in Appendix B; and

 

(4)  Consist of a soil with a saturated hydraulic conductivity of 1 x 10-4 cm/sec or less.

 

          (e)  Where undisturbed in-situ soils are not present, or where Env-Sw 804.02(d) is not met, the base shall be prepared in accordance with (d) above to a depth of 24 inches instead of 12 inches.

 

          (f)  Facility grades shall be sloped to facilitate compliance with Env-Sw 805.06 and Env-Sw 806.05.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2505.03); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 805.04  Liner Material and Construction Requirements.

 

          (a)  Soil liners shall meet or exceed the following specifications:

 

(1)  The liner shall be constructed of no less than 3 feet of a recompacted natural soil with uniform and consistent characteristics, or a uniform and consistent natural soil blended with an admixture, such as bentonite;

 

(2)  The liner shall be free from stones greater than one inch in diameter and stones having a sharp or angular surface;

 

(3)  Recompaction shall occur in lifts not to exceed the depth demonstrated in a test pad necessary to achieve a saturated hydraulic conductivity no greater than 1 x 10-7 cm/sec;

 

(4)  The recompacted lifts shall be constructed in a step-wise manner to limit the potential for vertical channeling;

 

(5)  Recompacted saturated hydraulic conductivity shall equal 1 x 10-7 cm/sec or less; and

 

(6)  The liner shall be protected from damage due to frost, desiccation, and differential movement.

 

          (b)  Geomembrane liners shall meet or exceed the following specifications:

 

(1)  The liner material shall have a minimum thickness of 60 mils;

 

(2)  The liner material shall be chemically compatible with anticipated waste and leachate characteristics; and

 

(3)  Seaming methods which involve the use of solvents shall incorporate quality assurance/quality control procedures pursuant to Env-Sw 805.16 to assure protection of groundwater and surface water resources.

 

          (c)  Composite liners shall consist of:

 

(1)  A geomembrane liner, as specified by (b) above; and

 

(2)  A soil component as specified by (a) above or a manufactured geosynthetic clay liner (GCL).

 

          (d)  All liners shall be constructed in accordance with a quality assurance/quality control plan established pursuant to Env-Sw 805.16.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2505.04); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 805.05  Liner System Design Standards.

 

          (a)  A liner system shall be comprised of the following components:

 

(1)  A liner which meets the requirements of Env-Sw 805.04;

 

(2)  A leachate collection and removal system which meets the requirements of Env-Sw 805.06; and

 

(3)  A leak detection and location system installed below the liner in (1) above, if required by Env-Sw 805.07.

 

          (b)  A landfill shall incorporate one or more liner systems, as specified in Env-Sw 805.12 through Env-Sw 805.15, based on the type of wastes to be received by the facility.

 

          (c)  Multi-liner systems shall be designed to place one liner system over another liner system.

 

          (d)  A single-lined facility shall incorporate one liner system.

 

          (e)  A double-lined facility shall incorporate 2 liner systems, separated by drainage material as specified in (f) below.

 

(f)  Except as provided by (g) below, each liner within a liner system shall be covered by a drainage geocomposite and an overlying layer of select granular soil drainage materials 12 inches in depth or more as required to:

 

(1)  Sustain anticipated loading conditions;

 

(2)  Protect the underlying liners from puncture, including simultaneous puncture of multi-liner systems;

 

(3)  Assist in the transmission of leachate in accordance with Env-Sw 805.06 and Env-Sw 806.05; and

 

(4)  At multi-liner facilities, limit the potential for hydraulic head to be concurrently experienced on an underlying liner in the event a leak develops in an overlying liner.

 

(g)  For multi-liner systems, geosynthetics alone may be used to separate the liners in areas of extended side slopes where placement and maintenance of granular soil drainage materials is not possible or practical for reasons of stability.

 

          (h)  The design of all liner systems incorporating geomembrane materials shall include calculations to demonstrate stability, but in no case shall be designed to exceed a slope of 2 horizontal to 1 vertical (2H:1V).

 

          (i)  All liner systems shall be constructed by controlled methods, in accordance with a quality assurance/quality control plan established pursuant to Env-Sw 805.16.

 

          (j)  Liner systems shall not be penetrated by any appurtenances.

 

          (k)  For multi-liner systems, GCLs shall extend across base areas and 10 feet up sideslopes, as measured in vertical feet.

 

          (l)  Each liner system in a multi-liner system shall be hydraulically separate.

 

          (m)  Liner systems shall extend at least 3 feet beyond the limit of waste, as measured in vertical feet.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2505.05); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 805.06  Leachate Collection and Removal System Design Standards.

 

          (a)  Leachate collection and removal systems shall be required at all lined landfills, to prevent leachate discharges and to collect and remove leachate contained within each liner system in conformance with Env-Sw 806.05.

 

          (b)  Leachate collection and removal systems shall be designed to be hydraulically separate from the stormwater management system(s).

 

          (c)  Leachate collection and removal systems located outside the waste deposition area shall be leak tight and accessible for leak testing, inspection, cleaning, and repair.

 

          (d)  Leachate collection and removal systems shall be designed to function effectively during freezing and frozen-ground conditions.

 

          (e)  Leachate collection and removal systems shall be designed to function effectively during both the active life of the landfill and the landfill closure and post-closure care period.  Therefore, for the purpose of sizing the system(s) components and specifying materials with an appropriate design life expectancy, the leachate generation rates, volumes, chemical composition, and temperatures for the above specified time period shall be considered.

 

          (f)  Leachate collection and removal systems shall be designed to maintain one foot or less of hydraulic head on all portions of the liner, excluding the leachate collection sumps if any, during routine leachate flows plus the 50-year/24-hour storm event.

 

          (g)  Leachate collection and removal systems shall be designed to manage the quantity of leachate to be generated by the 100-year/24-hour storm event, in a manner which shall:

 

(1)  Not allow a hydraulic head greater than one-foot to exist on any portion of the liner system, excluding the leachate collection sumps, if any, for longer than 7 days;

 

(2)  Provide storage and removal capabilities determined in accordance with (h) below if for a facility not directly connected to a permitted wastewater treatment facility or in accordance with (i) below if for a facility directly connected to a permitted wastewater treatment facility; and

 

(3)  Not rely on leachate recirculation as a factor in determining the required storage and removal capabilities, even if leachate recirculation will be a routine operating procedure at the facility.

 

          (h)  Leachate collection and removal systems which are not directly connected to a permitted wastewater treatment facility shall provide capacity for storing leachate as follows:

 

(1)  At least 15% of the 100-year storm event storage volume as specified by (g) above shall be provided in primary storage units located outside the waste deposition area or in sumps located within the waste deposition area;

 

(2)  The number of walls or liners in leachate storage units shall be no less than the number of liners within the landfill; and

 

(3)  Containment for the volume of leachate produced by the 100-year storm event which exceeds the volume of the primary storage units shall be provided:

 

a.  Within contingency storage units located outside the waste deposition area; and

 

b.  On the uppermost liner within a waste deposition area provided that:

 

1.  Storage on the liner in excess of one-foot of hydraulic head shall be limited to a period of 7 days or less, based on procedures identified in the leachate management plan provided pursuant to Env-Sw 806.05, including the pumping and removal rates required to reduce the hydraulic head to one foot or less within 7 days and the specifications for the equipment required to do so; and

 

2.  Systems relying on valve closure to initiate storage on the liner shall be fully equipped with automated notification alarms and dialers to minimize the potential for overflow, in accordance with (q) below.

 

          (i)  Leachate collection and removal systems which are directly connected to a permitted wastewater treatment facility shall be designed as follows:

 

(1)  The system shall provide leachate storage units outside the waste deposition area as necessary to meet the requirements of (g) above based on the allowable discharge rate of leachate to the wastewater treatment facility, pump capabilities, and other such factors which limit the rate at which leachate removal can occur;

 

(2)  Compatible pumping and removal rates shall be provided as a component of the facility’s leachate management plan, pursuant to Env-Sw 806.05; and

 

(3)  Systems relying on valve closure to initiate storage shall be fully equipped with automated notification alarms and dialers to minimize the potential for overflow, in accordance with (q) below.

 

          (j)  The various components of a leachate collection and removal system shall:

 

(1)  Be chemically compatible with the anticipated waste and leachate characteristics;

 

(2)  Provide access for monitoring flow, monitoring hydraulic head in the uppermost liner system, controlling flow, conducting inspections, and cleaning;

 

(3)  Maintain integrity under both dynamic and static loading events for all phases of landfill development;

 

(4)  Specify geotextiles based on calculations which incorporate the leachate generation and flow rates anticipated to occur during the operating and post-closure care phases of the landfill; and

 

(5)  Be designed to prevent the passage of fine particulates into the leachate collection and piping systems as well as mitigate against or eliminate the effects of any material capable of reducing the hydraulic flow capacity of the leachate collection and piping systems.

 

          (k)  Pipes which require solvent welding shall only be used in leachate vaults equipped with a high-water alarm, a backup high-water alarm, and automatic dialer.

 

          (l)  The granular soil drainage materials in the liner system shall:

 

(1)  Be designed to meet the requirements of (f) and (g) above; and

 

(2)  Contain no more than 15% calcium carbonate to prevent deposition and clogging and otherwise be of a quality that shall not result in clogging of the leachate collection and removal system(s).

 

          (m)  A facility shall not be designed to rely solely on managing leachate by recirculation methods. 

 

          (n)  Recirculation of leachate, if practiced, shall proceed only in accordance with the provisions of a leachate recirculation plan approved by the department as part of the facility’s operating plan pursuant to Env-Sw 1105 based on the criteria in Env-Sw 806.05.

 

          (o)  Leachate collection and removal systems which depend on routine pumping, rather than gravity operating methods, shall only be used at facilities where a full-time operator shall be present during normal operating hours and where auxiliary power and pumping equipment shall be available.

 

          (p)  Pump stations located outside the waste deposition area shall be designed to provide the following:

 

(1)  Backup pumping capacity;

 

(2)  Backup power supply;

 

(3)  High-water alarm;

 

(4)  Backup high-water alarm;

 

(5)  Alarms to automatic dialer; and

 

(6)  Efficient operation during both average and peak flows.

 

          (q)  Tanks, sumps, and other storage units associated with leachate collection and removal systems shall be equipped with high-water alarms, backup high-water alarms, and automatic dialers.

 

          (r)  Automatic dialers shall be equipped with a backup power supply and designed to continue dialing, sending messages, or otherwise attempting to reach a person at least once every ten minutes until the automatic dialer is turned off or otherwise reset at the site.

 

          (s)  Pipes, tanks, sumps, and other conveyance or storage units associated with leachate collection and removal systems outside the waste deposition area shall have secondary containment or be double-walled except for underground pipes, manholes, and other buried leachate conveyance or storage systems existing prior to the 2024 readoption of this chapter unless existing systems:

 

(1)  Are undersized;

 

(2)  Have failed;

 

(3)  Have reached the end of their service life; or

 

(4)  Are required to be upgraded or replaced for reasons other than the lack of a double-wall or secondary containment.

 

          (t)  A leachate transfer area shall be designed to contain releases during leachate transfer and constructed of a concrete pad or other impermeable surface that is of sufficient size for:

 

(1)  All connection points to be situated over the impermeable area when leachate is being transferred; and

 

(2)  The entire tank portion of the cargo truck or railcar being filled to be situated over the impermeable area when leachate is being transferred.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2505.06); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 805.07  Leak Detection and Location System Design Standards.

 

          (a)  In multi-liner systems, the bottom most liner system shall also be the leak detection and location system.

 

          (b)  In single-liner systems, a leak detection and location system shall be installed beneath the bottom most liner, unless the potential for leakage is reduced by installing a composite liner that meets the requirements of Env-Sw 805.04(c).

 

          (c)  A leak detection and location system shall be designed to:

 

(1)  Convey liquids to an observation point for detection, based on a maximum time of concentration equal to 24-hours under saturated hydraulic conditions; and

 

(2)  Provide a means for isolating the potential location of a leak.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2505.07); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 805.08  Groundwater and Surface Water Monitoring System Design Standards.

 

          (a)  The location and number of groundwater monitoring wells and surface water sampling points shall be based on site-specific hydrology and hydrogeology, but in no case shall there be less than one groundwater monitoring well installed hydraulically upgradient from the landfill and 3 monitoring wells installed in each down-gradient direction.

 

          (b)  The location, materials, and specifications of the groundwater and surface water monitoring system shall comply with the requirements of RSA 485-C.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2505.08); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 805.09  Stormwater Management System Design Standards.

 

          (a)  All landfills shall include a stormwater management system to:

 

(1)  Divert run-on around or away from the facility;

 

(2)  Control run-off discharge from the facility;

 

(3)  Control erosion, sedimentation, siltation, and flooding; and

 

(4)  Minimize the generation of leachate.

 

          (b)  Stormwater management systems shall be designed to accommodate the 50-year/24-hour storm event.

 

          (c)  Stormwater management systems shall be designed to accommodate all phases of the landfill’s active life, as well as the closure and post-closure care period.

 

          (d)  Stormwater management systems shall be hydraulically separate from the leachate collection and removal system(s).

 

          (e)  Stormwater management systems shall be designed to function effectively during frozen ground conditions.

 

          (f)  Permanent sedimentation ponds and detention ponds shall be sized to handle the 50-year/24-hour storm event with no less than one foot of freeboard below the emergency spillway invert.

 

          (g)  Peak surface run-off from the landfill site during the 50-year storm event shall be controlled and maintained at the pre-development discharge rate, in accordance with RSA 485-A.

 

          (h)  All stormwater that contacts waste shall be managed as leachate unless representative analytical characterization conducted in accordance with the facility’s approved operating plan demonstrates the liquid may be lawfully discharged to ground or surface waters without treatment.

 

          (i)  Perimeter drainage swales shall be provided to channel run-off during facility development based on the planned sequence of filling pursuant to Env-Sw 806.02 and during the facility’s post-closure period. 

 

          (j)  Perimeter drainage swales shall be designed and located to accommodate facility capping.

 

          (k)  Surface water run-on shall be diverted around and away from the facility by using berms and ditches, or similar methods.

 

          (l)  Surface water run-off shall be controlled by using benches, terraces, diversion berms and diversion swales, or similar methods.

 

          (m)  Erosion shall be controlled by using vegetation, terrace berms, silt fences and check dams, or similar methods.

 

          (n)  Drainage systems shall include provisions for inspections, monitoring, and maintenance.

 

          (o)  Stormwater design reports prepared to demonstrate compliance with this section shall be prepared in accordance with the requirements of Env-Wq 1500.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; amd by #6894-B, eff 12-1-98; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2505.09); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 805.10  Landfill Capping System Design Standards.

 

          (a)  Landfill capping systems shall be designed to meet the performance standards in Env-Sw 807.04 so as to:

 

(1)  Reduce leachate generation by limiting to the extent practicable precipitation and surface water infiltration of the waste, through placement of either impermeable or low-permeable cover materials over landfilled areas;

 

(2)  Promote drainage of stormwater and other surface waters away from and around the facility, by properly grading the facility and surrounding areas, and by constructing drainage structures, including berms, trenches, swales, ditches, and detention ponds;

 

(3)  Limit erosion and sedimentation by controlling stormwater drainage and by seeding, vegetating, riprapping, or otherwise stabilizing surface soils against the effects of wind and water;

 

(4)  At facilities that will generate methane gas, control the release of methane gas from the facility by incorporating vents designed to function properly in all anticipated weather conditions, including heavy or drifting snow, or by incorporating recovery wells or similar methods, to assure compliance with Env-Sw 805.18 and Env-Sw 806.07;

 

(5)  Protect or isolate the underlying waste materials from exposure to the environment to limit the attraction of vectors, production of leachate, production of odors, risk of injury or fire, and other threats to the public health and safety;

 

(6)  Resist damage due to the influences of freeze-thaw cycles, settlement, loading, or other anticipated conditions which, not properly considered during design, will result in over stressing the cap; and

 

(7)  Remediate environmental damage resulting from the facility, if determined necessary by the department on the basis of groundwater and surface water quality at the site or on the basis of other conditions involving environmental degradation at the site prior to closure.

 

          (b)  Lined landfill capping systems shall be designed in cross section according to the specifications provided in (e) below.

 

          (c)  Unlined landfill capping systems shall be designed in cross section according to the specifications provided in either (e) or (g) below.

 

          (d)  For unlined landfills, the type of capping system required pursuant to (e) or (g) below shall be based on which system type will meet the performance standards in Env-Sw 807.04, using the following factors to make the determination:

 

(1)  Type and quantity of waste received by the facility;

 

(2)  Size of facility footprint;

 

(3)  Compliance and performance history of the facility;

 

(4)  Extent of groundwater to waste contact zones, if any;

 

(5)  Groundwater and surface water quality at the facility site;

 

(6)  Proximity to drinking water supplies, surface waters, and floodplains;

 

(7)  Age of the facility;

 

(8)  Site topography; and

 

(9)  Geologic and hydrogeologic characteristics of the site.

 

          (e)  Impermeable landfill capping systems shall, at a minimum, be comprised of the following layers, from the top of the waste to the top of the cap:

 

(1)  Layer 1, immediately overlying the waste, shall:

 

a.  Serve to provide a stable, properly graded base for the placement of layer 2;

 

b.  Be designed to resist raveling, or the sifting of fines downward into the underlying wastes; and

 

c.  Consist of no less than 12 inches of unspecified soil;

 

(2)  Layer 2 shall:

 

a.  Serve to protect layer 3 from potential damage by underlying coarse soil materials;

 

b.  Serve to transmit decomposition gases to gas vents if active gas extraction wells are not used; and

 

c.  Consist of at least 12 inches of sand with 100% passing the one inch sieve and with no more than 12% passing the number 200 sieve on a weight basis if for a facility without an active gas extraction system or at least 6 inches of soil with 100% passing the one inch sieve if for a facility with an active gas extraction system;

 

(3)  Layer 3 shall consist of an impermeable barrier which shall:

 

a.  Minimize the infiltration of water into underlying wastes so as to limit continued leachate production and the associated adverse impacts to the quality of groundwater and surface waters; and

 

b.  Consist of a geomembrane with a minimum thickness of 40 mils;

 

(4)  Layer 4 shall:

 

a.  Provide for the removal of water which infiltrates through the topsoil layer, or layer 5;

 

b.  Protect layer 3 from penetration or other damage, including frost and desiccation;

 

c.  Consist of:

 

1.  At least 18 inches of free-draining sand which has a saturated hydraulic conductivity of no less than 1 x 10 -3 cm/sec, will pass on a weight basis no more than 10% through the number 200 sieve, and contains no more than 15% calcium carbonate; or

 

2.  Drainage geocomposite and no less than 12 inches of drainage sand, specified based on the results of a hydraulic calculation supporting the design and containing no more than 15% calcium carbonate; and

 

d.  Terminate in a drainage system at the toe of the slope of the cap that is designed to readily remove water transmitted by layer 4; and

 

(5)  Layer 5 shall:

 

a.  Serve to stabilize the capping system against the forces of wind and water erosion;

 

b.  Provide a low-maintenance surface;

 

c.  Promote evapotranspiration, meaning loss of water from the soil by both evaporation and transpiration from plants growing thereon;

 

d.  Provide ease of visual inspection of the capping system surface; and

 

e.  Consist of no less than 4 inches of topsoil, which is fertilized and vegetated.

 

          (f)  Alternative or supplemental materials to the topsoil specified in (e)(5) above shall be used if determined necessary by the permittee and agreed to by the department on the basis of actual site features and conditions, to achieve the required stability or erosion control.

 

          (g)  Low permeable capping systems, formerly referred to by the department as “extended interim closure,” shall be comprised of the following layers, at a minimum, from the top of the waste to the top of the cap:

 

(1)  Layer 1 shall conform to the requirements for layer 1 for impermeable capping systems as specified in (e)(1) above;

 

(2)  Layer 2 shall:

 

a.  Serve to isolate wastes from the environment and to protect public health;

 

b.  Reduce the infiltration of water into underlying wastes; and

 

c.  Consist of no less than 18 inches of soil with a saturated hydraulic conductivity not greater than 1 x 10-5 cm/sec; and

 

(3)  Layer 3 shall conform to the requirements for layer 5 for impermeable capping systems as specified in (e)(5) except as allowed in (f) above.

 

          (h)  Landfill capping systems shall be constructed in accordance with a quality assurance/quality control plan established pursuant to Env-Sw 805.16.

 

          (i)  Landfill capping systems shall be designed to manage properly stormwater resulting from the 50-year/24-hour storm event and incorporate at least one of the following:

 

(1)  Intermittent swales on the side slopes of the capping system, placed at an interval of 20 vertical feet or minimum spacing of 100 feet as measured from the center line of the swales, with a minimum slope of 2 percent to allow for settlement; or

 

(2)  An erosion-resistant moisture retention layer, placed directly under the vegetated layer, designed to sustain vegetative growth and effectively resist gully erosion.

 

          (j)  Stability calculations for the landfill capping system shall be submitted by the applicant to support the proposed design.

 

          (k)  Excluding the drainage swales noted in (i)(1) above, landfill capping systems shall be designed at a slope of 5% or greater, as necessary to accommodate the anticipated effects of settlement and consolidation and assure positive drainage and stability of the capping system during the post-closure period.

 

          (l)  The landfill capping system shall:

 

(1)  Extend beyond the confirmed limits of landfilled waste and the underlying liner systems; and

 

(2)  Terminate or be anchored in a manner which:

 

a.  Stabilizes the capping system against creep, pull-out, and material failure due to excessive stress;

 

b.  Limits erosion or wash-out at the toe-of-landfill slope(s); and

 

c.  Limits surface water from infiltrating into the waste.

 

          (m)  The landfill capping system and the post-closure period stormwater management system shall be compatible in design. Hydraulic calculations to support the proposed design shall be provided, including calculations to demonstrate that the drainage media shall function as intended in the design.

 

          (n)  Unless the facility only receives inert waste such as concrete debris, the landfill capping system shall incorporate a decomposition gas management system meeting the design criteria of Env-Sw 805.18 and the performance criteria of Env-Sw 806.07.

 

          (o)  Landfill capping systems shall be designed to support such loading as might occur during and following construction, including activities anticipated to occur during post-closure care, such as maintenance vehicles driving over the cap.

 

          (p)  On-the-ground markers or other type of clearly visible control points shall be placed at the facility site to allow facility personnel and inspectors to readily identify and locate the limits of the capping system.

 

          (q)  Except in areas where berms, swales, other stormwater infrastructure, or access roads are constructed, the maximum slope of capping systems shall not exceed 2.5 horizontal to 1 vertical.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2505.10); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 805.11  Other Landfill Design Requirements.

 

          (a)  The sequencing of facility development shall be planned based on subdividing the footprint into areas separated by berms.

 

          (b)  The subdivisions of a footprint shall be referred to as “phases,” “stages,” and “cells,” each term being used as defined in Env-Sw 104.09, Env-Sw 104.51, and Env-Sw 102.32, respectively.

 

          (c)  A facility shall be comprised of one or more phases, within which may exist one or more stages, within which may exist one or more cells, depending on the size of the facility and the design of the leachate management system.

 

          (d)  The layout and the configuration of, and the sequence for developing the phases, stages, and cells shall, by design:

 

(1)  Limit leachate generation by controlling the amount of area open to active operation and otherwise placing waste in a controlled manner consistent with the requirements in Env-Sw 806.02;

 

(2)  Limit the length of time unused cells remain inactive; and

 

(3)  Avoid the need to decommission groundwater monitoring wells as facility development proceeds and new stages or phases are constructed.

 

          (e)  Fill sequencing plans shall be prepared as part of the facility operating plan to show clearly the sequencing of facility development.

 

          (f)  Fill sequencing plans shall:

 

(1)  Show elevations and placements of lifts, as well as general access points;

 

(2)  Be compatible with the facility’s leachate management system design capabilities and limitations;

 

(3)  Be compatible with the facility’s stormwater management system design capabilities and limitations;

 

(4)  Be compatible with the facility closure design; and

 

(5)  Provide information and detail sufficient to allow a certified operator to operate the landfill in accordance with the approved design.

 

          (g)  Main access roads within the property boundary of a landfill leading to and from the working face of the landfill shall be designed and maintained to support the required loading, as well as limit to the extent practicable traffic congestion, road safety hazards, and dust production.

 

          (h)  Main access roads onto or into the property shall be fenced if necessary to catch blowing litter.

 

          (i)  Landscaping features shall be incorporated in conformance with Env-Sw 1103.04.

 

          (j)  Final grades at the facility shall be designed to blend with surrounding features to the greatest extent practicable.

 

          (k)  Perimeter and interior berms shall be analyzed for stability.

 

          (l)  Vegetated buffer zones shall be designed, established, and maintained to minimize impacts to abutting properties, including by shielding waste storage, handling, and disposal areas, and controlling the off-site transport of dust and windblown litter, as follows:

 

(1)  In the setback required by Env-Sw 804.04(a), the 50 feet nearest the property line;

 

(2)  In the setback required by Env-Sw 804.04(c), the 400 feet nearest the property line; and

 

(3)  In the setback required by Env-Sw 804.04(d), the 500 feet nearest the property line.

 

          (m)  A vegetated buffer zone shall be designed, established, and maintained to minimize the impact of ingress and egress access roads on abutting properties.

 

          (n)  An odor control plan shall be prepared and implemented as part of the technical specifications when excavation of putrescible waste is required during landfill construction.

 

          (o)  A landfill shall be designed such that all waste containment and structural components, including but not limited to, liner and leachate collection systems and cap systems, are constructed to resist the maximum horizontal acceleration in lithified earth materials within a seismic impact zone as defined in 40 CFR 258.14.

 

          (p)  A stability assessment of the landfill leachate management systems, and other structures such as mechanically stabilized earth berms, shall be performed and:

 

(1)  Include an analysis of potential failure planes for both static and seismic conditions; and

 

(2)  Be supported by corroborative field and laboratory data that defines the site geology and hydrogeology, geotechnical characteristics, waste mass characteristics, and geosynthetic characteristics.

 

          (q)  All walls, berms, or other structures used to retain waste shall be:

 

(1)  Located on a stable foundation as demonstrated by geotechnical investigation and calculations;

 

(2)  Designed with a static factor of safety of at least 1.5 against overturning and sliding; and

 

(3)  Designed to prevent the lateral movement of the waste mass.

 

          (r)  A settlement assessment to predict total and differential settlement of landfill systems shall be performed, and include:

 

(1)  A demonstration that systems will maintain their integrity and performance at maximum predicted settlements; and

 

(2)  A plan view showing settlement contours when predicted landfill settlements exceed 2 feet.

 

          (s)  Design features shall include the means to control and extinguish fires which might occur within the landfill and to otherwise limit the potential for liner damage due to fire.

 

          (t)  No permit or permit modification shall be granted for a landfill or landfill expansion unless groundwater monitoring can be accomplished, when required, in accordance with this chapter and pursuant to RSA 485-C.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2505.11); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 805.12  MSW Landfill Design Standards.

 

          (a)  Landfills receiving municipal solid waste (MSW) shall be designed as double-lined facilities pursuant to Env-Sw 805.05 and one of the liners shall be a composite liner pursuant to Env-Sw 805.04(c) and, as applicable, Env-Sw 805.05(k).

 

          (b)  Landfills receiving MSW shall be designed to provide the capability to operate in a manner that promotes rapid biological stabilization of landfilled wastes, as by leachate recirculation or bioreactor technologies, or both.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2505.12); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 805.13  MSW Incinerator Ash Landfill Design Standards.  Landfills receiving MSW incinerator ash shall be double-lined facilities pursuant to the requirements of Env-Sw 805.05 and one of the liners shall be a composite liner pursuant to Env-Sw 805.04(c) and, as applicable, Env-Sw 805.05(k).

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2505.13); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 805.14  Construction/Demolition Debris Landfill and Coal Ash Landfill Design Standards.

 

          (a)  Except as provided by Env-Sw 805.15 and subject to (b) below, landfills receiving construction and demolition debris only or coal ash only may be designed as single-lined facilities pursuant to the requirements of Env-Sw 805.05 and the liner shall be a composite liner pursuant to Env-Sw 805.04(c) and, as applicable, Env-Sw 805.05(k).

 

          (b)  If, based on an evaluation of the facility’s proposed operating plan and identification of the specific type or source of the wastes, the characteristics of the wastes cannot be consistently determined or assured or the characteristics pose a threat to groundwater quality, the facility shall be a double-lined facility pursuant to Env-Sw 805.05 and one of the liners shall be a composite liner pursuant to Env-Sw 805.04(c) and, as applicable, Env-Sw 805.05(k).

 

          (c)  Landfills which co-mingle construction and demolition debris with other waste types shall meet the design requirements set forth in this part relative to the other waste types, if the latter are more stringent than the requirements set forth in (a) above.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2505.14); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 805.15  Design Standards for Landfills Receiving Other Solid Waste Types.

 

          (a)  Landfills for any waste type(s) not specifically identified in Env-Sw 805.12 through Env-Sw 805.14 shall be designed as double lined facilities pursuant to Env-Sw 805.05 and one of the liners shall be a composite liner pursuant to Env-Sw 805.04(c) and, as applicable, Env-Sw 805.05(k), except as provided by (b) below and subject to the landfilling prohibitions in Env-Sw 806.12.

 

          (b)  Landfills which receive only stumps and brush, as assured through the provisions of the facility’s operating plan, may be designed as unlined landfills pursuant to Env-Sw 805.02(b).

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2505.15); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 805.16  Quality Assurance/Quality Control (QA/QC) Standards for Liner and Capping Systems.

 

          (a)  Liners and capping systems shall be tested and placed in strict accordance with a quality assurance/quality control (QA/QC) plan.

 

          (b)  The QA/QC plan shall be developed in accordance with this part and approved by the department as part of the construction contract documents provided pursuant to the provisions for a permit modification in Env-Sw 315.

 

          (c)  The QA/QC plan shall:

 

(1)  Be included in the project contract documents;

 

(2)  State clearly the minimum qualifications of the project engineer and their designee, if any;

 

(3)  Outline the specific duties of the project engineer and their designee with respect to the QA/QC plan;

 

(4)  Require the project engineer to provide reports as specified in Env-Sw 1104.04, Env-Sw 1104.05, Env-Sw 1104.06, and Env-Sw 1104.07; and

 

(5)  Reference the appropriate standard tests, such as ASTM or Geosynthetics Research Institute (GRI), to verify that the requirements cited in this section have been met.

 

          (d)  The QA/QC plan may reference the project technical specifications as appropriate to ensure consistency and minimize redundancy.

 

          (e)  The QA/QC plan for soils shall, at a minimum, specify:

 

(1)  Criteria for soil acceptance based on the following:

 

a.  Grain size distribution pursuant to ASTM D6913/D6913M-17 and D7928-21e1 for:

 

1.  Every 3,000 cubic yards of unprocessed soil; or

 

2.  Every 10,000 cubic yards of soil which has been processed to meet the project specifications;

 

b.  Hydraulic conductivity pursuant to ASTM D2434-22 for each new source of soil;

 

c.  Calcium carbonate content pursuant to ASTM D4373-21 for each new source of soil;

 

d.  Compaction test method pursuant to ASTM D698-12(2021) or ASTM D1557-12(2021) and testing frequency;

 

e.  Hydraulic conductivity test method pursuant to ASTM D5084-24 and testing frequency; and

 

f.  In place sampling method pursuant to ASTM D1587/D1587M-15 and hydraulic conductivity testing frequency; and

 

(2)  Provisions for correcting the installation of off-specification materials.

 

          (f)  The QA/QC plan for geosynthetics shall, at a minimum, include:

 

(1)  Criteria for material acceptance based on physical, mechanical, hydraulic, endurance, and degradation properties determined during design;

 

(2)  The frequency at which testing shall occur and the testing protocol to be met;

 

(3)  Provisions for correcting the installation of off-specification materials; and

 

(4)  For geomembranes, the requirements of (g) below.

 

          (g)  The QA/QC plan for geomembranes shall meet the requirements in (f) above and the following:

 

(1)  Require the project engineer or their designee to be present on site at all times during handling, deployment, seaming, testing, and covering of any geomembrane liner or cap and have the authority to order testing and to reject any materials or constructed systems which might affect the liner's or cap’s performance for any reason;

 

(2)  Contain the manufacturer’s quality assurance requirements to assure that geomembranes shall be of a consistent quality and meet the project specifications;

 

(3)  State the type of geomembrane material and texture, and the minimum requirements of raw material quality and formulation;

 

(4)  Identify the minimum acceptance standards for manufactured geomembrane sheets, including overall sheet quality, a list of acceptable index properties and quality of factory seams;

 

(5)  Assure that geomembrane material shall not be damaged from the time it leaves the factory to the time it is finally covered, by addressing the following:

 

a.  Requirements for shipping, handling, and site storage to assure that the material shall be protected from damage and sunlight;

 

b.  Minimum quality standards for the soil upon which the geomembrane will rest;

 

c.  Provisions for the project engineer or their designee to inspect the soil upon which the geomembrane will rest prior to placement of any geomembrane and, pursuant to Env-Sw 1104.04, certify that such soil has been installed in accordance with contract documents;

 

d.  Standards for the placement of geomembrane material which address, at a minimum, placement methods, unfavorable weather conditions, excessive heat or cold, wind, and wrinkles; and

 

e.  The upper limit as a percentage of the amount of patching any geomembrane panel can receive;

 

(6)  Contain minimum requirements for seam quality and specific remedies for when the minimum requirements are not met;

 

(7)  Verify the competence of seaming and welding equipment and personnel prior to seaming and welding;

 

(8)  Require the project engineer or their designee to have authority to reject any equipment, material, or personnel not passing the tests specified by the QA/QC plan;

 

(9)  Specify testing for seam strength at a specified interval and criteria for pass/fail;

 

(10)  Specify testing for seam continuity; and

 

(11)  Contain provisions for protecting the geomembrane during covering and backfilling.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2505.16); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 805.17  Vertical Expansion of Landfills.

 

          (a)  No permit or permit modification shall be granted for vertical expansion of a landfill, as defined in Env-Sw 104.61 unless:

 

(1)  The existing landfill is equipped with a liner system meeting the requirements of Env-Sw 805;

 

(2)  The proposed vertical expansion incorporates a liner system meeting the requirements of Env-Sw 805 over the existing landfill; or

 

(3)  For landfills receiving MSW, the existing landfill is equipped with a double liner system permitted prior to the 2024 readoption of this chapter, and there is no evidence of release(s) of contaminants through the liner system(s) to the environment or other damage to the liner system(s).

 

          (b)  Stability and settlement assessments required pursuant to Env-Sw 805.11 shall be performed, at a minimum, for the existing landfill prior to vertical expansion, for the combined existing landfill and vertical expansion during construction and operation, and for the combined existing landfill and vertical expansion at full capacity.

 

Source.  #10597, eff 7-1-14; ss by #14156, eff 12-21-24

         

          Env-Sw 805.18  Decomposition Gas Control and Migration Monitoring System Design Standards.

 

          (a)  Decomposition gas control and migration monitoring systems shall be required at landfills with the potential to generate decomposition gasses.

 

          (b)  Decomposition gas control and migration monitoring systems shall be designed to meet the decomposition gas control requirements in Env-Sw 806.07 and to control to the greatest extent practicable malodorous gas emissions.

 

Source.  #14156, eff 12-21-24

 

PART Env-Sw 806  OPERATING REQUIREMENTS

 

          Env-Sw 806.01  Applicability.

 

          (a)  The operating requirements in this part shall apply to all landfills, except:

 

(1)  Existing landfills which ceased operating prior to October 29, 1997 and do not resume operations on or after October 29, 1997;

 

(2)  Permit-exempt landfills identified in Env-Sw 302.03 or Env-Sw 810;

 

(3)  Permit-by-notification landfills having an active life of 90 days or less;

 

(4)  Research and development permit facilities as provided by Env-Sw 312.02(b); and

 

(5)  Emergency permit facilities as provided by Env-Sw 313.02(b).

 

          (b)  The operating requirements in this part shall apply as the complement of operating requirements in Env-Sw 1005 for all facilities, Env-Sw 1105 for facilities having an active life longer than 90 days, Env-Sw 1204 for permit-by-notification facilities, and, depending on the type of waste managed, Env-Sw 900.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2506.01); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 806.02  Waste Placement.

 

          (a)  The fill sequencing plan developed in accordance with Env-Sw 805.11 shall be part of the facility operating plan and implemented in accordance with the requirements of this section.

 

          (b)  Wastes shall be placed only within the permitted vertical and lateral limits of the landfill.

 

          (c)  Wastes shall be placed in a controlled manner, in accordance with the fill sequencing plans.

 

          (d)  Fill sequencing plans shall be developed on the basis of limiting the quantity of leachate a facility generates, through grading and covering techniques which maximize the quantity of received precipitation that can be handled as stormwater.

 

          (e)  Unloading of waste shall be confined to the smallest practical area.

 

          (f)  Exposed waste on the working face of the landfill shall be limited, to reduce precipitation contact with the waste and to allow the area to be covered as required pursuant to Env-Sw 806.03.

 

          (g)  All waste shall be evenly spread in shallow lifts and compacted, in accordance with plans and procedures which:

 

(1)  Assure stability;

 

(2)  Limit potential future settlement;

 

(3)  Limit rainfall infiltration; and

 

(4)  Are consistent with the progressive development of final grades.

 

          (h)  The first layer of waste placed above the leachate collection layer shall be a minimum of 4 feet in compacted thickness and be of a select nature containing no large or rigid objects, such as pipes or posts, that might cause damage to the liner system or instability.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2506.02); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 806.03  Landfill Cover During Operations.

 

          (a)  An approved cover material shall be applied over all sides and working faces of the landfill in a manner and at a frequency required to achieve the following performance objectives:

 

(1)  Minimize the dispersal of offensive odors;

 

(2)  Minimize the potential to attract and harbor vectors;

 

(3)  Control drainage in accordance with Env-Sw 805.06, Env-Sw 805.09, Env-Sw 806.05, and Env-Sw 806.06;

 

(4)  Control unsightly conditions and windblown waste;

 

(5)  Reduce the potential for fire;

 

(6)  Provide stability; and

 

(7)  Assist in the proper development of final grades, as set forth in the facility’s approved fill sequencing plans.

 

          (b)  A material shall not be approved or used as cover material unless:

 

(1)  The material exhibits characteristics required to achieve the performance objectives in (a) above;

 

(2)  Use of the material will not:

 

a.  Cause equipment or operational problems;

 

b.  Contribute to the deterioration of leachate quality at lined landfills;

 

c.  Cause surface water or groundwater contamination; or

 

d.  Pose a hazard to human health through skin contact or respiration; and

 

(3)  The material itself:

 

a.  Is not a hazardous waste;

 

b.  Is physically and chemically consistent in nature; and

 

c.  Contains no free liquids.

 

          (c)  At landfills receiving MSW, cover material approved in accordance with Env-Sw 314 or Env-Sw 315 shall be placed over all exposed waste no less frequently than at the end of each operating day.

 

          (d)  Cover materials shall be placed over all exposed waste at a minimum thickness of 6-inches, except for geosynthetic tarps and alternate daily cover materials approved with a different thickness in accordance with Env-Sw 314 or Env-Sw 315.

 

          (e)  Subject to the requirements in (b) above, the following materials shall be approved as working face cover material:

 

(1)  Natural soils; and

 

(2)  The following alternate daily cover materials, provided that use of the material is approved as part of the facility operating plan or approved via a permit modification pursuant to Env-Sw 315:

 

a.  Geosynthetic tarps;

 

b.  Casting sands;

 

c.  A waste certified for distribution and use as landfill cover pursuant to the provisions of Env-Sw 1500 prior to the 2024 readoption of this chapter;

 

d.  A waste approved for distribution and use as landfill cover pursuant to the provisions of Env-Sw 806.03(f); and

 

e.  Contaminated soil, subject to the requirements of Env-Sw 903.05.  

 

          (f)  Prior to using an alternate daily cover material in accordance with (e)(2)d. above, the permittee shall:

 

(1)  Obtain approval of a demonstration project meeting the requirements in (g) and (h) below pursuant to the permit modification process in Env-Sw 315;

 

(2)  Submit a report meeting the requirements of Env-Sw 806.03(h) to the department documenting the results of the demonstration project; and

 

(3)  Obtain approval of the alternate daily cover pursuant to the permit modification process in Env-Sw 315.

 

          (g)  A demonstration project shall be conducted for a period of no less than 60 days.

 

          (h)  The demonstration project required by (f) above shall include the following information:

 

(1)  The proposed cover material type and name;

 

(2)  Specifications for the material and, if available, a safety data sheet (SDS);

 

(3)  Test methodology, including procedures for placement and evaluation;

 

(4)  A contingency plan for the use of natural soils or geosynthetic tarps if the alternate material cannot be used, is not available, or is not performing adequately;

 

(5)  Analytical characterization testing; and

 

(6)  Any available documentation of the material’s use at other landfills which addresses the material’s performance and regulatory status.

 

          (i)  Following completion of the demonstration project in (f) above, the permittee shall submit a report to the department that includes:

 

(1)  The proposed cover material type and name;

 

(2)  The results of the project, including an assessment of;

 

a.  The performance of the material for each criterion listed in (a) above; and

 

b.  Whether the material meets the requirements in (a) and (b) above; and

 

(3)  A determination as to whether the material is suitable for use as cover material and recommendations for its use as cover material, including:

 

a.  The material specifications for acceptance; and

 

b.  The weather conditions during which the material can or cannot be used.

 

          (j)  A permittee may rely on a demonstration project completed by others when seeking a permit modification in accordance with Env-Sw 315, provided such demonstration project meets the requirements of (g) and (h) above.  

 

          (k)  At landfills receiving MSW, an intermediate cover shall be placed over all waste no later than 90 days following the last day waste was added to the area and shall consist of at least:

 

(1)  Twelve inches of soil, which may contain regulated contaminants at concentrations that do not exceed the soil remediation standards specified in Env-Or 606.19; or

 

(2)  A temporary geomembrane cap underlain by 6 inches of soil that may contain regulated contaminants at concentrations that do not exceed the soil remediation standards specified in Env-Sw 606.19.

 

          (l)  At landfills receiving MSW, a final cap system designed pursuant to Env-Sw 805.10, shall be constructed within 5 years of achieving final grade in any phase or portion of the landfill, unless an alternative schedule is approved in accordance with Env-Sw 314 or Env-Sw 315 based on information provided in the application which demonstrates:

 

(1)  The intermediate cover used will meet the performance standards in Env-Sw 805.10(a) for the duration of time requested in the alternative schedule; and

 

(2)  The alternative schedule for placing final cap will not result in problems relating to the conditions identified in Env-Sw 1005.01(d).

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; ss by #6894-B, eff 12-1-98; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2506.03); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 806.04  Operating Standards for Groundwater and Surface Water Monitoring.  A water quality monitoring program shall be implemented at all landfills, if required pursuant to the provisions of RSA 485-C.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2506.04); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 806.05  Leachate Management Requirements.

 

          (a)  The quantity of leachate generated at the facility shall be limited to the greatest extent practicable, by properly planning the sequenced development of the facility, properly managing stormwater infiltration and inflow, minimizing the active area of the landfill, and applying cover in accordance with Env-Sw 806.03.

 

          (b)  All leachate generated at a lined landfill shall be managed:

 

(1)  To prevent releases to the environment; and

 

(2)  By collecting and removing it from the liner system(s) to an approved treatment or disposal facility as described in (c) through (h), below; or

 

(3)  Pursuant to an approval to use an innovative alternative leachate management system as described in (i) through (o), below.

 

          (c)  A leachate management plan shall be developed, included in the facility’s operating plan, and implemented at all lined landfills, based on the following criteria:

 

(1)  Routine facility operations, including operations during the 50-year/24-hour storm event,  shall not result in more than one foot of hydraulic head on the liner system(s);

 

(2)  No less than 2 locations for leachate treatment or disposal shall be available by written agreement to manage the quantity of leachate generated by the facility during its active life, except as provided in (3) below;

 

(3)  Facilities that are directly connected to a permitted wastewater treatment facility need only to provide one location for leachate management, other than the connected treatment facility; and

 

(4)  A pumping and removal schedule to assure the availability of storage capacity.

 

          (d)  The recirculation of leachate shall be prohibited at ash monofills.

 

          (e)  At MSW landfills, leachate recirculation shall be allowed if approved by the department subject to (f) below, as part of the facility's operating plan prepared pursuant to Env-Sw 1105.

 

          (f)  The practice of leachate recirculation shall:

 

(1)  Not adversely affect the quality of the leachate so as to preclude its acceptance at waste water treatment facilities listed in the leachate management plan;

 

(2)  Not cause the facility to operate in excess of 12 inches of hydraulic head on the liner under routine operations including the 50-year/24 hour storm event;

 

(3)  Not result in a loss of structural stability;

 

(4)  Not be adversely affected by weather conditions, such as freezing temperatures or periods of heavy rainfall; and

 

(5)  Provide a benefit to facility operations, exclusive of any short or long-term economic benefit which might be associated with postponing leachate collection and removal.

 

          (g)  Storage capacity shall be required to contain the leachate generated by the precipitation from the 100-year storm event in accordance with Env-Sw 805.06.

 

          (h)  Regularly scheduled inspections and routine maintenance of the leachate collection and removal systems, including backup equipment, shall be conducted to limit clogging of the systems and to otherwise assure the functional integrity of the systems.

 

          (i)  The permittee of a landfill having a leachate collection system designed and constructed to maintain less than a 30-cm depth of leachate on the liner may apply for approval to use innovative alternative leachate management methods which vary from the requirements of (a) through (h), above, and the run-on control systems in 40 CFR 258.26(a)(1), May 10, 2016, or the liquids restrictions in 40 CFR 258.28(a), May 10, 2016, or both.

 

          (j)  Prior to implementing any innovative alternative leachate management method, the permittee shall apply for permit modification as specified in Env-Sw 315.

 

          (k)  The department shall not approve an application for an innovative alternative leachate management method unless the permittee demonstrates that the innovative alternative method will not cause contamination of groundwater or surface water, or cause leachate depth on the liner to exceed 30 cm.

 

          (l)  Any permit modification issued pursuant to (k), above, shall include such terms and conditions as are necessary to ensure that the innovative alternative leachate management method is at least as protective as the leachate management methods otherwise required by (a) through (h), above, including but not limited to conditions relating to monitoring and testing the efficacy and performance capabilities of the innovative alternative technology or process and reporting on the efficacy and performance capabilities of the innovative alternative method.

 

          (m)  A permit modification issued pursuant to (k), above, shall be valid for 3 years, subject to the following:

 

(1)  The permittee shall maintain compliance with all terms and conditions of the permit, the solid waste rules, and 40 CFR 258.4, May 10, 2016;

 

(2)  If such compliance is not maintained, the permit modification shall be terminated or other corrective measures shall be ordered, in accordance with 40 CFR 258.4(d), May 10, 2016;

 

(3)  If the permittee wishes to continue using the innovative alternative method beyond the term of the permit modification, the permittee shall apply for renewal at least 90 days prior to the expiration of the modification by submitting a written renewal application and a report, including supporting data, which documents the efficacy and performance capabilities of the innovative alternative method; and

 

(4)  The department shall renew the modification to allow continued use of the innovative alternative method if:

 

a.  The permittee demonstrates that the innovative alternative method is effective in preventing contamination of groundwater or surface water and that leachate depth on the liner has not exceeded 30 cm; and

 

b.  The permittee is in compliance with all terms and conditions of the permit, the solid waste rules, and 40 CFR 258.4, May 10, 2016.

 

          (n)  A renewal under (m), above, shall be valid for 3 years, provided however that the total term for an innovative alternative method including renewals shall not exceed 12 years.

 

          (o)  The limitations in 40 CFR 258.4(f), May 10, 2016, relative to small MSWLF units shall apply.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2506.05); amd by #9695, eff 4-22-10; ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 806.06  Stormwater Management Requirements.  The permittee shall grade the site to redirect run-on and run-off away from the active face of the landfill, reduce the amount of leachate generated, and reduce the potential for erosion, in accordance with Env-Sw 805.09.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2506.06); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 806.07  Decomposition Gas Control Requirements.

 

          (a)  Decomposition gases shall be controlled to prevent hazards to health, safety, or property.

 

          (b)  Facility operations and construction shall not cause the concentration of methane and other explosive gases to:

 

(1)  Exceed 25 percent of the lower explosive limit for gases in structures on or off-site, excluding leachate collection and gas control and recovery components; and

 

(2)  Exceed 50 percent of the lower explosive limit for the gases at and beyond the property boundary within the soil.

 

          (c)  To assure that the requirements in (a) and (b) above are met, a monitoring program shall be designed, included in the facility’s operating and closure plans, and implemented by the permittee in accordance with Env-Sw 805.18.

 

          (d)  The type, location, and frequency of monitoring shall be based on the following factors:

 

(1)  Soil conditions;

 

(2)  The hydrogeological and hydraulic conditions surrounding the disposal area; and

 

(3)  The location of any man-made structures and property boundaries.

 

          (e)  If methane or other explosive gases are detected above the limits specified in (b) above, the permittee shall notify the department immediately in accordance with the incident reporting requirements in Env-Sw 1005.09 and implement contingency procedures to ensure the protection of public health and safety.

 

          (f)  A decomposition gas management program shall be implemented by the permittee under the provisions of the facility’s approved operating plan and closure plan to assure that the facility complies with the federal clean air act and state air quality standards.

 

          (g)  A written plan for confined space entry, based on the standards specified by Federal Occupational, Safety and Health Administration (OSHA) requirements in 29 CFR 1910.146, shall be prepared and implemented as part of facility operations.

 

          (h)  For landfills with active gas extraction systems, the permittee shall maintain authority for complete operational control of any and all gas extraction wells and blower systems, together with at least one mechanism for destroying the gas.

 

          (i)  The permittee may transmit landfill gas collected using an active gas extraction system to other locations for use as fuel, provided the permittee complies with all federal, state, and local requirements that apply to the method by which the gas is transmitted.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2506.07); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 806.08  Inspections, Maintenance, Monitoring, Reporting, and Recordkeeping Requirements.

 

          (a)  This section establishes requirements, in addition to those requirements specified in Env-Sw 1000 and Env-Sw 1100, for inspecting, maintaining, and monitoring landfills which have not undergone closure pursuant to an approved closure plan, and specifies the reporting and recordkeeping requirements related thereto.

 

          (b)  Unless otherwise specified, the word “daily” as used in this section shall mean on each operating day.

 

          (c)  The permittee shall regularly inspect and maintain all facility components, including:

 

(1)  Roads;

 

(2)  Berms;

 

(3)  Active and inactive filling areas;

 

(4)  Pipes;

 

(5)  Vaults;

 

(6)  Valves;

 

(7)  Tanks;

 

(8)  Ponds;

 

(9)  Equipment;

 

(10)  Temporary, intermediate, and final cover;

 

(11)  Permanent and temporary fencing;

 

(12)  Groundwater monitoring wells;

 

(13)  Gas management and monitoring devices; and

 

(14)  Electric panels, switches, relays, alarms, and automatic dialers.

 

(d)  At least once weekly, litter shall be collected from fences, roadways, trees, and other areas, and stored or disposed.

 

(e)  Leachate management systems shall be monitored, and the data reviewed by the permittee and recorded in the facility operating records, as follows:

 

(1)  The hydraulic head elevation on the liner shall be measured at the low point of a cell, phase, or stage where leachate is collected, and recorded:

 

a.  At least once per month;

 

b.  After each storm event greater than or equal to the 2-year/24-hour storm; and

 

c.  If the hydraulic head is found to be 12 inches or greater, daily until the hydraulic head is less than 12 inches;

 

(2)  The quantity of leachate collected off the liner systems and transported off-site or treated shall be measured daily, and the destination recorded;

 

(3)  Flow in the secondary leachate collection system(s), shall be measured and recorded:

 

a.  At least once per week; and

 

b.  More frequently when required to complete the reporting pursuant to (n) below;

 

(4)  The average flow in the secondary leachate collection system(s) occurring during the 30-day operating period preceding the last measurement shall be calculated, recorded, and, when required pursuant to (l) below, reported;

 

(5)  Analytical characteristics, based on representative samples taken from the primary leachate collection system in April, July, and November, and, if liquid is present, from the secondary leachate collection system in July, shall be determined for the following parameters:

 

a.  pH;

 

b  Temperature;

 

c.  Chemical oxygen demand (COD);

 

d  Specific conductance;

 

e.  Iron;

 

f.  Manganese;

 

g.  Sulfates;

 

h.  Chlorides;

 

i.  Chromium;

 

j.  Lead;

 

k.  Cadmium; and

 

l.  Except for ash landfills, volatile organic compounds (VOCs);

 

(6)  Analytical characteristics, based on representative samples taken from the primary leachate collection system in July, shall be determined for the following additional parameters:

 

a.  Per- and polyfluoroalkyl substances (PFAS) as determined by EPA Method 1633;

 

b.  Total solids (TS);

 

c.  Total volatile solids (TVS);

 

d  Total suspended solids (TSS);

 

e.  Volatile suspended solids (VSS);

 

f.  Five-day biochemical oxygen demand (BOD5);

 

g.  Total Kjeldahl nitrogen (TKN);

 

h.  Ammonia-nitrogen (NH3-N);

 

i.  Total phosphorous;

 

j.  Alkalinity;

 

k.  Grease; and

 

l.  Linear alkylbenzene sulfonate (LAS); and

 

(7)  The liquid level in the leachate storage tanks shall be measured on a daily basis at facilities not connected to a wastewater treatment facility and on a weekly basis at facilities connected to a wastewater treatment facility.

 

          (f)  Landfill gas concentrations shall be measured no less than quarterly and in accordance with Env-Sw 806.07.

 

          (g)  Groundwater and surface water quality monitoring systems shall be monitored, and the data reported as required pursuant to RSA 485-A or RSA 485-C, as applicable.

 

          (h)  Where electronic monitoring and recording systems are used, including supervisory control and data acquisition systems, the maximum value identified by the system for the subject monitoring period shall be used for purposes of monitoring, recording, and reporting data in accordance with this part.

 

(i)  Permittees shall file quarterly and annual reports in accordance with Env-Sw 303, according to the following schedule:

 

(1)  Quarterly reports shall be filed no later than 30 days following the end of the quarterly reporting period;

 

(2)  Annual reports shall be filed no later than March 31 of the year following the calendar year being reported; and

 

(3)  For facilities managing putrescible wastes, annual odor control evaluations shall be filed no later than August 31 of the year following the year being reported, which reporting year shall be July 1 through June 30.

 

          (j)  The quarterly report shall include:

 

(1)  The name and permit number of the reporting facility;

 

(2)  The data specified by (d) and (e) above, excluding leachate analytical data required by (d)(5) and (d)(6);

 

(3)  Quantity and type of waste received by the facility daily, in tons;

 

(4)  Data units for each type of data reported;

 

(5)  Reporting period or dates the data was collected, for each type of data reported;

 

(6)  Monthly and quarterly subtotals for each type of data reported;

 

(7)  A summary of complaints received, and mitigation measures taken relative to each complaint; and

 

(8)  A summary of leachate breakouts, including a site plan showing the approximate location(s), and actions taken to address the breakout.

 

          (k)  The leachate analytical data required pursuant to (e)(5) and (e)(6), above, shall be compiled, evaluated, and filed in accordance with Env-Sw 303, no later than 60 days following receipt of analytical results.

 

          (l)  Annual reports shall:

 

(1)  Be prepared as specified by Env-Sw 1105.13 and Env-Sw 1105.14, as applicable; and

 

(2)  Include:

 

a.  A summary of the facility inspection and maintenance activities;

 

b.  An analysis of remaining capacity based on a site survey which identifies the remaining facility capacity;

 

c.  A 5-year trend analysis of changes in flow rates for primary and secondary leachate systems; and

 

d.  A 5-year trend comparison of the leachate indicator parameters of chloride, nitrate, TKN, iron, and manganese in the primary leachate system to the same leachate indicator parameters in the secondary leachate system.

 

          (m)  An annual odor control evaluation shall include:

 

(1)  Facility description, including a description of the landfill gas collection and control system, and facility changes since the previous reporting year;

 

(2)  A review and evaluation of odor control practices and measures employed by the facility during the reporting period, including:

 

a.  A comparison of those practices with industry standard and best practices;

 

b.  A review of odor control methods used at the facility specifically including but not limited to control measures employed for areas used to stage trucks waiting to off-load, the working face, locations under construction, and locations without final cap; and

 

c.  An assessment of the effectiveness of odor control measures based on an evaluation of records compiled for odor events including sludge, construction related odors, landfill gas odors, leachate odors, and control methods used;

 

(3)  A landfill gas collection system analysis, including system design and development, for example, phased installation, system and well field coverage, system design, and landfill gas collection, recovery, and efficiency;

 

(4)  Odor complaint analysis and summary, including geographical trends, weather-related trends, temporal trends, such as, time-of-day, seasonal, waste composition trends, working face location trends, landfill cover trends, and landfill gas system function trends;

 

(5)  Conclusions and recommendations, including such relative to daily and routine operations, landfill gas system operations, leachate management practices, construction practices, and odor complaint reporting and response procedures;

 

(6)  An implementation plan, including dates by which the permittee has already or shall timely implement the recommendations;

 

(7)  A status update regarding the implementation of recommendations in prior odor control evaluation reports; and

 

(8)  Figures, tables, and attachments, including a site locus map, a gas extraction well location plan, a figure showing odor complaints by location, figures showing graphical trends of landfill gas and waste composition data relative to odor complaints and weather, tables summarizing final cover installation and daily cover use as well as annual odor complaints and surface emissions monitoring results, and logs of odor complaints and waste loads rejected due to odors.

 

          (n)  The following reporting requirements shall apply to the average secondary leachate collection system flow rates occurring over a 30-day period:

 

(1)  Rates less than or equal to 25 gallons per tributary acre per day shall be reported to the department in accordance with (h) above;

 

(2)  Rates which exceed 25 gallons per tributary acre per day shall be reported to the department in accordance with Env-Sw 1005.09, except for flow which the department agrees is the result of the dewatering of the drainage layer following construction; and

 

(3)  Rates which exceed 50 gallons per tributary acre per day shall:

 

a.  Be reported to the department in accordance with Env-Sw 1005.09; and

 

b.  Require the permittee to submit to the department a report of the investigation into the cause(s) of the rate exceedance(s) and a response action plan within 60 days of submitting the report required by a. above.

 

          (o)  The response action plan required by (n)(3) above:

 

(1)  Shall include:

 

a.  Confirmation of the source and cause(s) of the increase in flow;

 

b.  Response actions to address the cause(s); and

 

c.  A schedule for implementing the response action plan; and

 

(2)  May include but is not limited to the following response actions necessary to remedy the likely cause of the problem:

 

a.  Increasing monitoring and reporting;

 

b.  Instituting operational changes to limit hydraulic head on the overlying liner;

 

c.  Locating and repairing leak(s);

 

d.  Retrofitting the overlying liner; or

 

e.  Closing part or all of the facility.

 

          (p)  Upon receipt of solid waste by a landfill, the permittee shall obtain a written statement bearing the signature or electronic equivalent of the transporter certifying that the following information is true and correct to the best of the transporter’s knowledge and belief:

 

(1)  The printed or typed name and mailing address of the person delivering the solid waste;

 

(2)  The date of delivery;

 

(3)  A declaration of the total number of tons of solid waste being delivered to the facility; and

 

(4)  The point of origin of the waste contained in each load, identified by individual state, and number of tons from that state.

 

          (q)  Destruction of facility records or electronic storage of facility records shall not occur unless approved pursuant to the provisions for a permit modification in accordance with Env-Sw 315.

 

          (r)  The landfill owner shall attach notification to the property deed that a landfill exists on the property and cause the notification to be recorded at the registry of deeds in the county where the property is located within 30 days of commencing operations.

 

          (s)  Proof of notification of filing pursuant to (p) above shall be provided to the department by the permittee within 30 days of commencing placement of waste.

 

          (t)  Notification pursuant to (p) shall include the following information:

 

(1)  A statement that a landfill exists on this property;

 

(2)  Identification of the book and page numbers in the registry of deeds where title to the property is recorded;

 

(3)  Identification of the property tax map and lot numbers as identified by the political subdivision in which the facility is located;

 

(4)  Latitude and longitude of a known fixed point at the landfill site; and

 

(5)  The facility name, permit number, and standard permit issuance date.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; ss by #8459, eff 10-28-05 (formerly Env-Wm 2506.08); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 806.09  Other Operating Standards.

 

          (a)  Equipment for spreading, compacting, and covering solid wastes under all anticipated weather conditions shall be available and in operating condition at all times. 

 

          (b)  Auxiliary equipment shall be available and maintained in operational condition.

 

          (c)  Salvaging of solid waste shall be controlled so as not to interfere with landfill operations and not to harbor vectors or otherwise result in violating the universal facility requirements in Env-Sw 1000.

 

          (d)  Salvaging that constitutes landfill reclamation shall be subject to Env-Sw 808.

 

          (e)  The permittee shall investigate the occurrence of flow rate in the secondary leachate collection system that exceeds 50-gallons per tributary acre per day and which cannot be reasonably attributed to the dewatering of the drainage layer following construction.

 

          (f)  The permittee shall post on its facility website a “contact us” form or a specific telephone number and email address for the public to use to submit questions and issues relating to the facility.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2506.09); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 806.10  Construction and Demolition Debris Landfill Operating Requirements.  Landfills receiving construction and demolition debris shall comply with the operating standards set forth in this part and in Env-Sw 805.14.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2506.10); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 806.11  Asbestos Waste Landfill Operating Requirements.  Landfills receiving asbestos shall operate in compliance with Env-Sw 901, this part, and Env-Sw 805.15.

 

Source.  #5172, eff 7-1-91; amd by #5297, eff 12-24-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2506.11); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 806.12 Prohibitions.  The following wastes shall not be landfilled:

 

          (a)  Untreated infectious waste;

 

          (b)  Contained gaseous waste;

 

          (c)  Liquid wastes

 

          (d)  Wet cell batteries, and after June 30, 2025, lithium-ion batteries, and electronic devices, pursuant to RSA 149-M:27, II;

 

          (e)  Leaf or yard waste, except as provided in RSA 149-M:27, III;

 

          (f)  Video display devices, central processing units from computers, or non-mobile video display media recorders or players, pursuant to RSA 149-M:27, IV;

 

          (g)  Food waste after January 31, 2025, pursuant to RSA 149-M:27, V;

 

          (h)  Mercuric oxide batteries, pursuant to RSA 149-M:28, IV; and

 

          (i)  Mercury-added products, pursuant to RSA 149-M:58, I.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2506.12); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

PART Env-Sw 807  CLOSURE REQUIREMENTS

 

          Env-Sw 807.01  Applicability.

 

          (a)  The rules in this part shall apply to closure of all landfills, except:

 

(1)  Facilities that have closed in accordance with a department-approved closure plan and have achieved the performance standards in Env-Sw 807.04;

 

(2)  Permit-exempt facilities, operated and closed in compliance with the exemption;

 

(3)  Permit-by-notification facilities having an active life of 90 days or less, which have operated and closed in compliance with the permit-by-notification;

 

(4)  Research and development permit facilities as provided by Env-Sw 312.02(b); and

 

(5)  Emergency permit facilities as provided by Env-Sw 313.02(b).

 

          (b)  The closure requirements in this part shall apply as the complement of the closure requirements in Env-Sw 1006 for all facilities, Env-Sw 1106 for facilities having an active life longer than 90 consecutive days, and, depending on the type of waste managed, Env-Sw 900.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2507.01); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 807.02  Closure Scheduling.

 

          (a)  Except as noted in (b) below, a landfill which has operated in compliance with its permit shall be subject to closure on a schedule specified in the permit based on the facility capacity and life expectancy.

 

          (b)  A landfill which holds a temporary permit shall be subject to closure on a schedule determined pursuant to Env-Sw 307.

 

          (c)  Other circumstances which shall provide cause for closure shall be as specified in Env-Sw 1006.01.

 

Source.  #5172, eff 7-1-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; amd by #6894-B, eff 12-1-98; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2507.02); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 807.03  Landfill Closure and Post-Closure Requirements.

 

          (a)  Landfills shall be closed in accordance with an approved closure plan.

 

          (b)  Subject to (c), below, landfill closure and post-closure activities shall involve all activities required at a facility to achieve the performance standards in Env-Sw 807.04, including:

 

(1)  Terminating active use of the facility;

 

(2)  At unlined landfills, investigating the extent of waste to groundwater contact zones, if any, and if required under RSA 485-C:

 

a.  Removing the waste out of groundwater; or

 

b.  Lowering the groundwater table;

 

(3)  Consolidating landfilled waste within the permitted footprint, grading slopes, and otherwise configuring the facility for acceptance of a capping system that meets the requirements of Env-Sw 805.10;

 

(4)  Constructing and maintaining a capping system at the facility which meets the standards set forth in Env-Sw 805.10;

 

(5)  Constructing, operating, and maintaining a stormwater management system for the capped facility and site so as to redirect run-on and run-off away from the cap of the landfill, reduce the amount of leachate generated, and reduce the potential for erosion in accordance with the standards set forth in Env-Sw 805.09 and Env-Sw 806.06;

 

(6)  Operating and maintaining the facility's leachate management system in accordance with Env-Sw 806.05 and in accordance with a schedule specified in the approved post-closure care plan;

 

(7)  Operating, maintaining, and monitoring the facility’s leak detection system(s) in accordance with the provisions of the approved post-closure care plan;

 

(8)  Constructing, operating, and maintaining the facility’s groundwater and surface water monitoring system and implementing the facility’s approved post-closure groundwater and surface water monitoring program in accordance with RSA 485-C;

 

(9)  Constructing, operating, and maintaining the facility's decomposition gas control and migration monitoring systems as applicable, in accordance with Env-Sw 805.18 and Env-Sw 806.07;

 

(10)  Monitoring settlement, both by visual inspection and by topographic survey using established control points, and making related repairs to the facility as needed including the repair of areas where settlement exceeds the capping system’s design tolerances and the repair of areas where settlement results in the loss of positive drainage;

 

(11)  Providing control of access to the facility in accordance with Env-Sw 1103 and to facilitate compliance with the performance standards provided in Env-Sw 807.04 and to otherwise limit threats to public health, safety, and the environment;

 

(12)  Providing financial assurance for the cost of post-closure monitoring, in accordance with Env-Sw 1400;

 

(13)  Meeting all requirements in Env-Sw 807.05 and filing all reports with the department in accordance with Env-Sw 1105.14; and

 

(14)  Undertaking any other activities, including repair and remedial activities, as necessary to achieve compliance with Env-Sw 807.04.

 

          (c)  Maintaining a closed landfill or any component thereof shall include all inspection, monitoring, and repair work required to satisfy the performance standards in Env-Sw 807.04 and the reporting requirements in Env-Sw 807.05.

 

          (d)  For landfills existing prior to October 29, 1997 and located on property not owned by the permittee, the permittee shall obtain legal rights of access to the property prior to facility closure for the purpose of meeting all required closure and post-closure obligations at the facility in accordance with the solid waste rules.  Such legal rights of access shall be for a period of not less than 99 years.

 

Source.  #5172, eff 7-1-91; amd by #5297, eff 12-24-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2507.03); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 807.04  Performance Standards.  The permittee shall implement an approved closure plan requiring that:

 

          (a)  The facility and site effectively cease generating leachate;

 

          (b)  The facility and site effectively cease generating decomposition gases;

 

          (c)  The facility and site achieve maximum settlement, with the capping system intact and no reasonable expectation that integrity of the capping system will be at risk without regular maintenance;

 

          (d)  The facility and site have no adverse impact to air, groundwater, or surface water; and

 

          (e)  The facility and site do not otherwise pose a risk to human health or the environment.

 

Source.  #5172, eff 7-1-91; amd by #5297, eff 12-24-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2507.04); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 807.05  Post-Closure Care and Reporting Requirements.

 

          (a)  The post-closure period of a landfill shall be the period required to demonstrate the facility has achieved the performance standards specified in Env-Sw 807.04.

 

          (b)  During the post-closure period, the permittee shall have specific obligations to regularly inspect, monitor, and maintain the facility in conformance with the solid waste rules based on the provisions of a post-closure care plan.

 

          (c)  Subject to (d) below, solely for the purposes of determining financial assurance requirements, the post-closure period for landfills shall be 30 years from the date the complete capping system is installed, or the date of the last most recent estimate obtained by the permittee as required by Env-Sw 1405.02, whichever is later.

 

          (d)  The post-closure period shall be subject to periodic adjustment by implementing the permit modification procedures in Env-Sw 306 and Env-Sw 315 as follows:

 

(1)  In the event that post-closure monitoring data or other available information provides an indication that the required performance standards are unlikely to be achieved during the approved post-closure monitoring period:

 

a.  The permittee shall identify the likely cause(s) in a report to the department; and

 

b.  Depending on the cause(s), the department shall adjust the post-closure monitoring period or require the permittee to implement repair or remedial closure or post-closure work, pursuant to the permit modification procedures in Env-Sw 306; or

 

(2)  In the event the permittee believes that post-closure monitoring data and other available information provides sufficient evidence that the required performance standards are achieved at the facility, the permittee may submit an application for permit modification pursuant to Env-Sw 315 to request an appropriate reduction in the post-closure period for the facility.

 

          (e)  A detailed post-closure care plan shall be developed and implemented by the permittee to assure compliance with Env-Sw 807.03, Env-Sw 807.04, Env-Sw 1106, and this section. The plan shall be a condition of the facility’s permit.

 

          (f)  All facility systems shall be thoroughly monitored and inspected on a schedule that is initially the same as required of operating facilities in Env-Sw 806.08.

 

          (g)  The permittee may request a decrease in the frequency of monitoring and inspections based on a favorable comparison of the performance expectations and actual performance but in no case shall inspections occur less than semi-annually.

 

          (h)  Inspections shall:

 

(1)  Be conducted twice annually, one conducted in the period between January 1 and June 30, and the other conducted in the period between July 1 and December 31;

 

(2)  Be conducted at a minimum of 3 months apart; and

 

(3)  Be recorded and the report submitted to the department within 30 days following completion of inspection.

 

          (i)  Pursuant to Env-Sw 1105.14, the permittee shall file an annual report with the department including an assessment of whether the facility is achieving the performance requirements in Env-Sw 807.04.

 

          (j)  The permittee shall notify the department in accordance with Env-Sw 1005.09 when facility damage, malfunction, or sub-standard performance occurs at the facility.

 

          (k)  Following completion of the capping system construction, the permittee shall file record drawings for the closed facility in accordance with Env-Sw 1104.07.

 

          (l)  Unless previously performed under Env-Sw 806.08(r), the permittee shall attach notification to the property deed that a landfill exists on the property and cause the notification to be recorded at the registry of deeds in the county where the property is located.

 

          (m)  Proof of notification filing pursuant to (l) above shall be provided to the department by the permittee with the submission of record drawings pursuant to (k) above.

 

          (n)  Notification pursuant to (l) shall include the following information:

 

(1)  A statement that a landfill exists on this property;

 

(2)  Identification of the registry of deeds, book, and page numbers where title to the property is recorded;

 

(3)  Identification of the property tax map and lot numbers as identified by the political subdivision in which the facility is located;

 

(4)  Latitude and longitude of a known fixed point at the landfill site;

 

(5)  Description of the facility, including size, type of wastes received, type of liner if any, and type of cap;

 

(6)  Description of closure implemented, and identification of the permit issued by the department under which closure occurred, including a statement that the permit might contain certain legal obligations regarding the site;

 

(7)  A statement that any future change in use shall be subject to review and approval by the department pursuant to Env-Sw 807.06;

 

(8)  A statement that post-closure use of the property shall not disturb the integrity of the final cover, liners, or any other components of the containment systems or the function of the monitoring systems unless approved by the department via the applicable permit or permit modification as specified in Env-Sw 311 through Env-Sw 315; and

 

(9)  A statement that access shall be assured to department inspection personnel and the permittee for monitoring and maintenance purposes.

 

          (o)  The permittee shall implement such repairs or remedial activities as necessary to assure compliance with the performance standards set forth in Env-Sw 807.04 and other requirements of this chapter.

 

Source.  #5172, eff 7-1-91; amd by #5297, eff 12-24-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2507.05); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

          Env-Sw 807.06  Post-Closure Use.

 

          (a)  The permittee shall obtain department approval, via the permit modification procedures in Env-Sw 315, for any post-closure use or activity at the site not specifically approved in the facility’s permit.

 

          (b)  A post-closure use shall not increase the potential hazards to public health, safety, and the environment from the closed landfill.

 

          (c)  A post-closure use shall not preclude access to components of the landfill closure system for purposes of inspection, maintenance, monitoring, and repair.

 

          (d)  A post-closure use shall not cause damage to any component of the landfill closure system as specified in Env-Sw 1004.04.

 

          (e)  If damage occurs to any component of the landfill closure system during post-closure use, the damage shall be repaired in a timely manner and the incident reported to the department in accordance with Env-Sw 1005.09.

 

          (f)  Residential and commercial buildings, except buildings used for landfill operation, maintenance, and post-closure care, shall be prohibited on top of or within 100 feet of the landfill footprint or property line, whichever is less. 

 

          (g)  The following information shall be included with the application for permit modification for post-closure use:

 

(1)  A description of the proposed post-closure use;

 

(2)  The intended start date of the proposed post-closure use or activity, and the proposed duration;

 

(3)  A site plan showing the proposed location(s) of post-closure use and existing components of the landfill closure systems, including monitoring points;

 

           (4)  Post-closure use design plan(s);

 

(5)  Record drawings of landfill closure systems located within 100 feet of the post-closure use or activity;

 

(6)  An updated post-closure care plan as specified in Env-Sw 807.05(e);

 

(7)  An evaluation of the available environmental monitoring data and other information pertaining to the facility conditions and the proposed post-closure use including a statement by a qualified professional engineer identifying whether the proposed post-closure use will meet the requirements of (b) above;

 

(8)  A plan for the repair of any disturbance or damage to the landfill and associated infrastructure, including the capping system;

 

(9)  A plan for the protection of all existing landfill components including liners, leachate collection piping, gas recovery systems, stormwater systems, and other landfill infrastructure present;

 

(10)  Updated financial assurance plan in accordance with Env-Sw 1400; and

 

(11)  Certification, signed by the applicant, that the proposed activity shall not adversely affect the post-closure care of the landfill.

 

          (h)  Post-closure use requiring construction shall follow the applicable requirements of Env-Sw 1104.

 

          (i)  Following termination of a post-closure use or activity, the facility shall be restored to conditions that existed prior to commencing the post-closure use.

 

Source.  #14156, eff 12-21-24

 

PART Env-Sw 808  LANDFILL RECLAMATION

 

          Env-Sw 808.01  Applicability.  The rules in this part shall apply to facilities where landfill reclamation activities occur.

 

Source.  #5172, eff 7-1-91; amd by #5297, eff 12-24-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2508.01); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 808.02  Pre-Requisites for Landfill Reclamation.

 

          (a)  Prior to conducting landfill reclamation activities, the permittee shall:

 

(1)  Obtain approval of a feasibility study scope-of-work meeting the requirements in Env-Sw 808.03(b) pursuant to the standard permit process in Env-Sw 314 or the permit modification process in Env-Sw 315;

 

(2)  Submit a report meeting the requirements of Env-Sw 808.03(c) to the department documenting the results of the feasibility study;

 

(3)  Obtain approval of a landfill reclamation work plan meeting the requirements of Env-Sw 808.04 pursuant to the permit modification process in Env-Sw 315; and

 

(4)  After complying with (1) through (3) above, receive approval from the department to commence reclamation activities.

 

Source.  #5172, eff 7-1-91; amd by #5297, eff 12-24-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2508.02); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 808.03  Feasibility Study.

 

          (a)  The permittee shall complete a feasibility study prior to seeking approval to conduct any landfill reclamation activities.

 

          (b)  The scope-of-work for the feasibility study shall include:

 

(1)  The reclamation project goals;

 

(2) Provisions for a review of existing background information to include:

 

a.  Site inspections and personnel interviews;

 

b.  Operating history and waste receipt records;

 

c.  Analytical data and engineering records; and

 

d.  Permittee, facility owner, property owner, facility operator, host municipality, host solid waste district, and department records;

 

(3)  A proposed field investigation to include:

 

a.  A site plan showing the location of all proposed work areas;

 

b.  The proposed number and location of all test borings, trenches, and test pits, and their estimated depth and volume;

 

c.  A description of all excavation and materials handling operations;

 

d.  A description of all material quantification methods, laboratory analyses, test burns, and other tests or methods that will be used to characterize and estimate the quantities of recyclable materials, soils, combustibles, and other reclaimed materials;

 

e.  A plan for the repair of any disturbance or damage to the landfill and associated infrastructure, including the capping system and groundwater monitoring wells; and

 

f.  A plan for the protection of all existing landfill components including liners, leachate collection systems, active or passive decomposition gas collection and control systems, stormwater management systems, and other landfill infrastructure;

 

(4)  A proposed work schedule that includes the intended starting date of the field investigation and the discrete field activities to be performed; and

 

(5)  A contingency plan as described in Env-Sw 808.05.

 

          (c)  No later than 90-days following completion of the field investigation, the permittee shall submit a report to the department documenting the results of the feasibility study which shall include the following:

 

(1)  A summary of existing background information;

 

(2)  The results of the field investigation, including:

 

a.  The results of all sampling and analyses performed on excavated materials;

 

b.  The logs of all excavations, including test pits and test borings, and a site plan showing the locations and identification of each such excavation; and

 

c.  The composition and relative quantities of excavated materials, including recyclable materials, combustibles, soils, and other materials such as asbestos waste;

 

(3)  An evaluation of the suitability of the excavated materials for reuse or recycling, the need for further processing and the expected final disposition of all materials reclaimed from the landfill as well as the final disposition of any waste materials not reclaimed;

 

(4)  An assessment of potential landfill reclamation costs and if applicable following reclamation activities, the revised landfill closure costs estimated in accordance with Env-Sw 1400;

 

(5)  Identification and assessment of the potential impacts associated with landfill reclamation, including potential pathways for nuisance conditions and off-site contamination, and methods for mitigating impacts associated with landfill reclamation; and

 

(6)  An evaluation of the reclamation project goals and a determination if landfill reclamation is feasible at the subject facility.

 

Source.  #5172, eff 7-1-91; amd by #5297, eff 12-24-91; ss by #6535, INTERIM, eff 7-1-97, EXPIRES: 10-29-97; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2508.03); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 808.04  Landfill Reclamation Work Plan.

 

          (a)  If landfill reclamation is determined to be feasible in accordance with Env-Sw 808.02, and prior to conducting landfill reclamation activities, the permittee shall obtain approval of a landfill reclamation work plan pursuant to Env-Sw 315.

 

          (b)  A landfill reclamation work plan shall include the following:

 

(1)  A detailed plan for the management and control of odors, which specifically addresses measures to avoid the dispersion of offensive odors and includes provisions for work stoppage in the event planned odor control measures fail;

 

(2)  A map showing the location of all buildings within 2,000 feet of the reclamation area and the direction of prevailing winds;

 

(3)  A site plan which details the proposed reclamation area and delineates in plan and cross-sectional view the depth of excavation, proximity to the liner and leachate collection system, if any, other landfill structures and components, and the direction in which the landfill reclamation will progress;

 

(4)  A description of the excavation and sorting procedures for all removed materials;

 

(5)  A contingency plan in accordance with Env-Sw 808.05;

 

(6)  A description of all procedures, including quality assurance and quality control provisions, for processing, testing, storage, removal, transfer, use, and disposal of excavated materials;

 

(7)  Identification of any special waste handling procedures required during reclamation activities;

 

(8)  A stormwater management and leachate management plan; and

 

(9)  The procedure for site clean-up and grading after the reclamation with detailed drawings depicting original and final grades.

 

          (c)  If construction or reconstruction of landfill systems is required during or following reclamation activities, the permittee shall obtain approval of construction plans pursuant to the permit modification requirements of Env-Sw 315 and adhere to the construction requirements in Env-Sw 1104.

 

Source.  #5172, eff 7-1-91; ss by #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2508.04); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 808.05  Site Safety and Contingency Plan.  A site safety and contingency plan shall include the following:

 

          (a)  A description of actions to be taken with respect to personnel safety, on-site personnel injury, fires, explosions, landfill gases, dust, odor, noise, vectors, and excavation and release of hazardous substances or toxic materials;

 

          (b)  Hazard evaluation and protection from potential hazards, including engineering controls, personal protection equipment, and air monitoring techniques;

 

          (c)  Designation of exclusion, decontamination and support zones, decontamination procedures, on-site communication procedures, emergency procedures, and access control; and

 

          (d)  Designation of a qualified, full-time site health and safety coordinator.

 

Source.  #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2508.05); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 808.06 Reclamation Activities.

 

          (a)  Reclamation activities shall be approved as construction activities by the department in accordance with Env-Sw 1104.

 

          (b)  Reclamation activities shall be conducted by the permittee in accordance with the construction requirements of Env-Sw 1104.

 

Source.  #14156, eff 12-21-24

 

          Env-Sw 808.07 Landfill Footprint Reduction. If reclamation activities result in a landfill footprint reduction, the areas from which wastes were not removed shall be subject to the closure requirements of Env-Sw 807.

 

Source.  #14156, eff 12-21-24

 

PART Env-Sw 809  RESERVED

 

PART Env-Sw 810  PERMIT-EXEMPT LANDFILLS

 

          Env-Sw 810.01  Purpose.  The purpose of the rules in this part is to identify landfills which are permit-exempt, pursuant to Env-Sw 302.03.

 

Source.  #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2510.01); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 810.02  General Exemption Provisions.

 

          (a)  The landfills described in this part shall be exempt from obtaining a permit, subject to the requirements in Env-Sw 810.03.

 

          (b)  A permit exemption shall not affect a person’s obligation to obtain all requisite federal, state, or local permits, licenses, or approvals, or to comply with all other applicable federal, state, district, or local permits, ordinances, laws, or approvals or conditions pertaining to the permit-exempt activities.

 

Source.  #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2510.02); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 810.03  Exemption Conditions.  All permit-exempt landfills identified in this part shall comply with the following requirements:

 

          (a)  A permit-exempt landfill shall not be located on property that is subject to any ongoing enforcement action by the department, unless approved by the presiding authority over the enforcement action, such as the department in an action commenced under Env-C 204, an environmental council over an administrative action appealed pursuant to RSA 21-O:14, or the judge in a civil action brought before a court of competent jurisdiction;

 

          (b)  A permit-exempt landfill shall not adversely affect the operation and closure of any existing facility;

 

          (c)  The owner of the property on which the facility is located shall be designated as the permittee and subject to all obligations related thereto;

 

          (d)  At all times during facility operations, the permittee shall maintain cover materials at the facility site in a sufficient quantity as to comply with the applicable cover requirements;

 

          (e)  During the active life of the facility, the permittee shall control access to the facility in a manner as to prevent unlawful dumping;

 

          (f)  The permittee shall close the facility in conformance with Env-Sw 1006 and the following:

 

(1)  No less than 2 feet of clean, compacted soil, and more when specified by the rules in this part, shall be placed as final cover over all landfilled waste;

 

(2)  Final cover shall be properly graded, seeded, and mulched to produce and sustain vegetative growth, or otherwise stabilized to prevent erosion;

 

(3)  The permittee shall regularly inspect the facility to assure that the cover materials maintain their integrity, that voids and sink holes do not develop, and that the site is otherwise protective of the environment, public health and safety; and

 

(4)  The permittee shall implement repairs or take other remedial action as necessary to achieve and maintain compliance therewith;

 

          (g)  The facility shall comply with all other requirements specified in Env-Sw 1000 and, depending on the type of waste managed at the facility, Env-Sw 900; and

 

          (h)  All waste managed at the facility shall be actively managed.

 

Source.  #6619-B, eff 10-29-97; amd by #6894-B, eff 12-1-98; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2510.03); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 810.04  On-site Asphalt and Masonry Debris Landfills.  Asphalt and masonry debris buried at the waste generation site pursuant to Env-Wm 2510.04 as effective on October 29, 1997 shall not be required to be removed provided that:

 

          (a)  The facility buried the following waste types only:

 

(1)  Fully cured asphalt, concrete, brick, cement, or other inert masonry materials substantially free of protruding reinforcing materials;

 

(2)  Fully cured asphalt which is not ground or pulverized; or

 

(3)  A combination thereof;

 

          (b)  The buried waste does not include any materials or substances that have the potential to leach contaminants to groundwater or surface water or to emit pollutants to the air, including lead paint, asbestos, or chemicals;

 

          (c)  The waste was buried in a manner as to preclude the development of sink holes and to otherwise be protective of the environment, public health and safety; and

 

          (d)  The waste was buried at least 75 feet from all water supply wells and surface waters and at least 4 feet above the seasonal high water table and bedrock.

 

Source.  #6619-B, eff 10-29-97; ss by #6894-B, eff 12-1-98; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2510.04); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 810.05  Leachfield Repair Residuals Landfills.  Subject to Env-Sw 810.03, no permit shall be required to bury waste soil and stone from the repair or replacement of existing leaching fields regulated under Env-Wq 1000, provided that:

 

          (a)  The burial location shall be on the same property as the waste generation site;

 

          (b)  The buried waste shall be placed at least 4 feet above the seasonal high water table and bedrock; and

 

          (c)  The burial location shall meet the minimum separation distances for leach bed trenches required in Env-Wq 1008.

 

Source.  #6619-B, eff 10-29-97; amd by #6894-B, eff 12-1-98; ss by #8459, eff 10-28-05 (formerly Env-Wm 2510.05); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 810.06  Abandoned Underground Structures.  Subject to Env-Sw 810.03, no permit shall be required to bury in place existing abandoned underground structures, such as foundation walls, footings, pipes, and culverts, provided that:

 

          (a)  The abandoned structure shall not include:

 

(1)  Materials or substances that have the potential to leach contaminants to groundwater or surface water or to emit pollutants to the air;

 

(2)  Treated wood;

 

(3)  Insulation; or

 

(4)  General construction and demolition debris;

 

          (b)  The abandoned structure shall not be a structure which is required by other rules or regulations to be removed;

 

          (c)  The structure shall be buried in a manner as to preclude the development of sink holes and to otherwise be protective of the environment, public health and safety; and

 

          (d)  The material used to fill and cover the structure shall not be a waste.

 

Source.  #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2510.06); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 810.07  Incidental Animal Burial.  Subject to Env-Sw 810.03, no permit shall be required to bury a deceased animal, provided that:

 

          (a)  The person controlling the land where the animal is buried shall agree to the location of the grave site;

 

          (b)  The grave shall be covered with a sufficient quantity and depth of soil as to avoid disturbance of the burial site by other animals; and

 

          (c)  The grave site shall not constitute an animal burial ground as otherwise regulated under the provisions of Env-Sw 810.08.

 

Source.  #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2510.07); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 810.08  Animal Burial Grounds.  Subject to Env-Sw 810.03, no permit shall be required to bury animal carcasses not regulated under Env-Sw 904.01(e) and not exempt pursuant to Env-Sw 810.07, provided that:

 

          (a)  The location shall be at least 100 feet from any property boundary or surface water, and shall not be located within the well head protection area of a community or non-transient, non-community water supply well system as delineated in the department’s source water protection area inventory;

 

          (b)  The buried material shall be placed at least 4 feet above the seasonal high water table and bedrock;

 

          (c)  The carcasses shall be covered with at least 3 feet of clean fill immediately following placement in the ground; and

 

          (d)  Written notification shall be provided to the state veterinarian in instances where 10 or more carcasses are buried.

Source.  #6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2510.08); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 

          Env-Sw 810.09  Off-site Stump Dumps.  Subject to Env-Sw 810.03, no permit shall be required to bury stumps and tree parts thereof received from off-site locations, provided that:

 

          (a)  The burial site is:

 

(1)  At least 75 feet from any water supply well;

 

(2)  At least 25 feet from any property line; and

 

(3)  At least 4 feet above the seasonal high groundwater table;

 

          (b)  The stumps and tree parts thereof are buried in a manner as to preclude the development of sink holes and erosion of cover materials, and to otherwise be protective of the environment, public health and safety; and

 

          (c)  A notation is recorded in the chain of title for the property on which the burial site is located, to include the following information:

 

(1)  A statement that the property has been used for the disposal of stumps and tree parts thereof;

 

(2)  The date(s) the disposal activity took place;

 

(3)  The location of the burial area(s), with sufficient specificity as to allow an independent third party to locate the area(s); and

 

(4)  The estimated quantity of waste disposed on the property.

 

Source.  #7225, eff 3-31-00; (See Revision Note at chapter heading for Env-Sw 800); ss by #8459, eff 10-28-05 (formerly Env-Wm 2510.09); ss by #10597, eff 7-1-14; ss by #14156, eff 12-21-24

 


Appendix A

 

Rule Sections

State Statute(s) Implemented

Federal Regulations Implemented

Env-Sw 800 (see also specific sections listed below)

RSA 149-M:6, III; RSA 149-M:7, II, III, V, XIV, XVI; RSA 149-M:9

40 CFR 258

Env-Sw 806.05

RSA 149-M:6, III; RSA 149-M:7, II, III, XIV; RSA 149-M:9

40 CFR 258.4

Env-Sw 806.12

RSA 149-M:27, II, III, IV, V; RSA 149-M:28, IV; RSA 149-M:58, I

 

 

Appendix B

 

Rule

Title/ Date

Obtain at:

Env-Sw 805.03(d)(3)
Env-Sw 805.16(e)(1)d.

ASTM D698-12(2021): Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3)) (July 2021)

ASTM International

100 Barr Harbor Drive

PO Box C700

West Conshohocken, PA 19428-2959

 

Available electronically (Volume abstract is free, full content may be purchased for $76): https://www.astm.org/d0698-12r21.html

 

All ASTM Standards available online, amounts vary by volume: https://www.astm.org/products-services/bos.html

 

Env-Sw 805.03(d)(3)

Env-Sw 805.16(e)(1)d.

ASTM D 1557-12(2021): Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN-m/m3)) (July 2021)

ASTM International

100 Barr Harbor Drive

PO Box C700

West Conshohocken, PA 19428-2959

 

Available electronically (Volume abstract is free, full content may be purchased for $76): https://www.astm.org/d1557-12r21.html

 

All ASTM Standards available online, amounts vary by volume: https://www.astm.org/products-services/bos.html

 

Env-Sw 805.16(e)(1)a.

ASTM D6913/D6913M-17: Standard Test Methods for Particle-Size Distribution (Gradation) of Soils Using Sieve Analysis (February 2021)

ASTM International

100 Barr Harbor Drive

PO Box C700

West Conshohocken, PA 19428-2959

 

Available electronically (Volume abstract is free, full content may be purchased for $99): https://www.astm.org/d6913_d6913m-17.html

 

All ASTM Standards available online, amounts vary by volume: https://www.astm.org/products-services/bos.html

 

Env-Sw 805.16(e)(1)a.

ASTM D7928-21e1: Standard Test Method for Particle-Size Distribution (Gradation) of Fine-Grained Soils Using the Sedimentation (Hydrometer) Analysis (June 2021)

ASTM International

100 Barr Harbor Drive

PO Box C700

West Conshohocken, PA 19428-2959

 

Available electronically (Volume abstract is free, full content may be purchased for $99): https://www.astm.org/d7928-21e01.html

 

All ASTM Standards available online, amounts vary by volume: https://www.astm.org/products-services/bos.html

 

Env-Sw 805.16(e)(1)b.

ASTM D2434-22: Standard Test Methods for Measurement of Hydraulic Conductivity of Coarse-Grained Soils (April 2022)

ASTM International

100 Barr Harbor Drive

PO Box C700

West Conshohocken, PA 19428-2959

 

Available electronically (Volume abstract is free, full content may be purchased for $76): https://www.astm.org/d2434-22.html

 

All ASTM Standards available online, amounts vary by volume: https://www.astm.org/products-services/bos.html

 

Env-Sw 805.16(e)(1)c.

ASTM D4373-21: Standard Test Method for Rapid Determination of Carbonate Content of Soils (June 2021)

ASTM International

100 Barr Harbor Drive

PO Box C700

West Conshohocken, PA 19428-2959

 

Available electronically (Volume abstract is free, full content may be purchased for $69): https://www.astm.org/d4373-21.html

 

All ASTM Standards available online, amounts vary by volume: https://www.astm.org/products-services/bos.html

 

Env-Sw 805.16(e)(1)e.

ASTM D5084-24: Standard Test Methods for Measurement of Hydraulic Conductivity of Saturated Porous Materials Using a Flexible Wall Permeameter (August 2024)

ASTM International

100 Barr Harbor Drive

PO Box C700

West Conshohocken, PA 19428-2959

 

Available electronically (Volume abstract is free, full content may be purchased for $119): https://www.astm.org/d5084-24.html

 

All ASTM Standards available online, amounts vary by volume: https://www.astm.org/products-services/bos.html

 

Env-Sw 805.16(e)(1)f.

ASTM D1587/D1587M-15: Standard Practice for Thin-Walled Tube Sampling of Fine-Grained Soils for Geotechnical Purposes (November 2015)

ASTM International

100 Barr Harbor Drive

PO Box C700

West Conshohocken, PA 19428-2959

 

Available electronically:

Volume abstract is free: https://www.astm.org/d1587_d1587m-15.html

Withdrawn, but full content may still be purchased for $75: https://store.accuristech.com/standards/astm-d1587-d1587m-15?product_id=1909240#document

 

All ASTM Standards available online, amounts vary by volume: https://www.astm.org/products-services/bos.html