CHAPTER
Env-A 600 STATEWIDE PERMIT SYSTEM
Statutory
Authority: RSA 125-C:4, RSA 125-C:6, RSA
125-C:11, RSA 125-C:12, RSA 125-C:13, RSA 125-I:3, and RSA 125-I:5
PART
Env-A 601 PURPOSE AND APPLICABILITY
Env-A 601.01 Purpose. The purpose of this chapter is to implement
the permitting requirements of RSA 125-C and RSA 125-I to regulate the
operation and modification of new and existing stationary sources, area
sources, and devices in order to achieve and maintain:
(a)
The ambient air quality standards established pursuant to RSA 125-C and
Env-A 300; and
(b)
The ambient air limits for regulated toxic air pollutants established
pursuant to RSA 125-I and Env-A 1400.
Source. #120, eff 8-31-73; ss by #721.16 eff 12-7-75;
ss by #1375, eff 7-1-79; ss by #1717, eff 2-19-81; ss by #2332, eff 4-29-83; ss
by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss by #6057-B, eff 6-30-95;
ss by #6468-B, eff 3-5-97; ss by #7879, eff 4-26-03; ss by #9906, INTERIM, eff
4-26-11, EXPIRES: 10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
Env-A 601.02 Applicability. This chapter shall apply to each stationary
source, area source, and device that is required by RSA 125-C:11 to possess a
temporary permit or operating permit, whether a permit-by-notification, general
permit, or individual operating permit, prior to construction, installation,
operation, or modification of such source or device.
Source. #1375, eff 7-1-79; ss by #1717, eff 2-19-81;
ss by #2332, eff 4-29-83; ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90;
ss by #6057-B, eff 6-30-95; ss by #7879, eff 4-26-03; ss and moved by #8129,
eff 7-28-04 (formerly Env-A 602.01); ss by #10000, eff 10-1-11; ss by #10175,
eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 601.03 Compliance Required; Designation of Agent
Allowed.
(a)
The owner or operator of a stationary source, area source, or device
shall comply with applicable statutory requirements in RSA 125-C and the
requirements of this chapter relative to applying for,
obtaining, and maintaining a permit.
(b)
The owner or operator may designate an agent to act as an applicant in order to comply with any application requirements found
in this chapter.
Source. #10000, eff 10-1-11; ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
PART
Env-A 602 REFERENCES
Env-A 602.01 References. For the purpose of
this chapter, unless otherwise specified all references to 40 CFR 51, 40 CFR
52, 40 CFR 70, 40 CFR 72, 40 CFR 73, 40 CFR 76, and 40 CFR 78 shall be to the
July 1, 2011 edition.
Source. #1375, eff 7-1-79; ss by #1717, eff 2-19-81;
ss by #2332, eff 4-29-83; ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90;
ss by #6057-B, eff 6-30-95; ss by #7879, eff 4-26-03; ss by #8129, eff 7-28-04;
ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
PART
Env-A 603 PERMIT OR NOTICE REQUIRED
Env-A 603.01 Permit Required.
(a)
No person shall cause or allow the construction or installation of a new
or modified stationary source, area source, or device as specified in Env-A
607.01, which is required to hold a temporary permit in accordance with the
provisions of this chapter, without having applied for and been issued a
temporary permit.
(b)
No person shall cause or allow the operation of an existing stationary
source, area source, or device as specified in Env-A 608.01, which is required
to hold a state permit to operate in accordance with the provisions of this
chapter, without having applied for and been issued a state permit to operate.
(c)
No person shall cause or allow the operation of a stationary source,
area source, or device, which is required to hold a title V operating permit
pursuant to Env-A 609.01 in accordance with the provisions of this chapter,
without having applied for and been issued a title V operating permit.
(d)
The owner or operator of a stationary source, area source, or device
that is eligible to be installed and operated pursuant to a general permit, as
specified in Env-A 610, shall not be required to obtain a temporary permit or
individual operating permit, if a letter of approval is issued by the
department pursuant to Env-A 610.09.
(e)
The owner or operator of a nonmajor
stationary source, area source, or device that is eligible to be installed and
operated pursuant to a permit-by-notification as
specified in Env-A 603.02(a) shall be exempt from any other permitting requirement
in this chapter if a permit-by-notification is obtained as specified in Env-A
603.02(b).
(f)
Prior to operating a source in accordance with Env-A 625, the owner or
operator shall submit a written notice to the department in accordance with
Env-A 625.03.
Source. #120, eff 8-31-73; ss by #721.16 eff 12-7-75;
ss by #1375, eff 7-1-79; ss by #1717, eff 2-19-81; ss by #1861, eff 11-16-81;
ss by #2332, eff 4-29-83; ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90;
ss by #6057-B, eff 6-30-95; ss by #7879, eff 4-26-03; ss by #8129, eff 7-28-04;
ss by #9791, eff 10-1-10; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 603.02 Permit-by-Notification.
(a)
A non-metallic mineral processing plant as defined in Env-A 2802, that
is not a major source shall be eligible to be installed or operated pursuant to
a permit-by-notification.
(b)
To install or operate a non-metallic mineral processing plant
pursuant to a permit-by-notification, the owner or operator shall comply with
Env-A 2806.
Source. #9791, eff 10-1-10; ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
PART
Env-A 604 PERMIT CONTENT: TEMPORARY PERMITS AND PERMITS TO OPERATE
Env-A 604.01 Permit Terms and Conditions.
(a)
A temporary permit or permit to operate issued by the department shall
contain terms and conditions establishing the parameters under which the
stationary source, area source, or device to which it applies shall be
constructed or operated.
(b)
Upon the issuance of a temporary permit or permit to operate, the
permittee shall comply with all terms and conditions in the permit.
Source. #1375, eff 7-1-79; ss by #1717, eff 2-19-81;
ss by #1861, eff 11-16-81; ss by #2332, eff 4-29-83; ss by #2938, eff 12-27-84;
ss by #5033, eff 12-27-90; ss by #5989, eff 2-22-95; ss by #7879, eff 4-26-03;
ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000, eff 10-1-11
(from Env-A 604.02); ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 604.02 Terms and Conditions to Ensure Synthetic
Minor Status.
(a)
For each stationary source, area source, or device for which permit
terms and conditions are required in order for the
source or device to retain synthetic minor source status, such terms and
conditions shall include:
(1) Emission limitations;
(2) Limitations and controls on production,
operation, or both; and
(3) Monitoring, recordkeeping, and reporting
requirements capable of demonstrating compliance with such limitations and
controls.
(b)
All emission limitations, controls, and other requirements imposed
pursuant to (a), above, shall be:
(1) Permanent and quantifiable;
(2) At least as stringent as all other applicable
limitations, controls and requirements; and
(3) Enforceable under the state implementation
plan (SIP) or federal Clean Air Act.
Source. #1375, eff 7-1-79; ss by #1717, eff 2-19-81;
ss by #1861, eff 11-16-81; ss by #2332, eff 4-29-83; ss by #2938, eff 12-27-84;
ss by #5033, eff 12-27-90; ss by #5989, eff 2-22-95; ss by #7879, eff 4-26-03;
ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000, eff 10-1-11;
ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
PART
Env-A 605 OBLIGATION OF APPLICANT
Env-A 605.01 Applicability. This part shall apply to each person who
files an application for a permit or a request for any other form of approval
to construct, install, or operate any source or device for which a permit or
other approval is required from the department, whether such application or
request is filed by an owner or operator or by an agent as allowed by Env-A
601.03.
Source. #1375, eff 7-1-79; ss by #1615, eff 7-31-80;
ss by #1710, eff 1-19-81; ss by #2332, eff 4-29-83; ss by #2938, eff 12-27-84;
ss by #5033, eff 12-27-90; ss by #6057-B, eff 6-30-95; ss by #7879, eff 4-26-03;
ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000, eff 10-1-11;
ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 605.02 Proof of Right, Title,
and Interest; Good Standing.
(a)
The department shall consider an application only when the applicant has
certified that the applicant, or the owner or operator the applicant
represents, has right, title, or interest in all of the property that is
proposed for development or use because the owner or operator owns, leases, or
has binding options to purchase all of the property proposed for development or
use.
(b)
The owner or operator shall bear the burden of proving right, title, and
interest in the property.
(c) An owner or
operator that is an entity which is required by RSA 292, RSA 293, RSA 293-A, or
other applicable provision of New Hampshire law to register with the New
Hampshire secretary of state shall show proof of being registered and in good
standing to do business in
Source. #1710, eff 1-19-81; ss by #2332, eff 4-29-83;
ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss by #6057-B, eff
6-30-95; ss by #7879, eff 4-26-03; ss by #8129, eff 7-28-04; ss by #10000, eff
10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 605.03 Proof of Legal Authority. Where the applicant is not the legal owner or
operator of the source or device that is the subject of the application, a copy
of the agency agreement authorizing the applicant to act on behalf of the owner
or operator for purposes of the application shall be filed as part of the
application for a permit.
Source. #1710, eff 1-19-81; ss by #2332, eff 4-29-83;
ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss and moved by #6057-B,
eff 6-30-95 (formerly Env-A 605.05); ss by #7879, eff 4-26-03; ss by #9791, eff
10-1-10; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 605.04 Certification of the Responsible Official.
(a)
Each applicant, owner or operator shall appoint at least one person to
be a responsible official, as that term is defined in Env-A 104.
(b)
The applicant, owner or operator shall notify the department of the
identity of the responsible official(s) by completing and filing an ARD-1 form,
as specified in Env-A 1703, “Form ARD-1, General Facility Information,” signed
by each appointed responsible official.
(c)
Each application form, report, or compliance certification filed with
the department pursuant to this chapter shall:
(1) Contain a written statement certifying the
truth, accuracy, and completeness of the document; and
(2) Be signed by one responsible official.
(d)
Unless otherwise specified, the certification required by (c), above,
shall state that, to the best of the responsible official’s knowledge and
belief formed after reasonable inquiry, the statements and information in the
document are true, accurate, and complete.
(e)
Within 30 days of any change in the identity of a responsible official
or applicant, the owner or operator shall file with the department an ARD-1
form containing the information specified in Env-A 1703, “Form ARD-1, General
Facility Information,” and the signed certification statement specified in
Env-A 1703.
(f)
Within 30 days of any change in the identity of the owner or operator,
the new owner or operator shall file with the department an ARD-1 form
containing the information specified in Env-A 1703, “Form ARD-1, General
Facility Information,” and the signed certification statement specified in
Env-A 1703.
Source. #1710, eff 1-19-81; ss by #2332, eff 4-29-83;
ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss by #6057-B, eff
6-30-95; ss by #7879, eff 4-26-03; ss by #9791, eff 10-1-10; ss by #10000, eff
10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
PART
Env-A 606 AIR POLLUTION DISPERSION
MODELING IMPACT ANALYSIS
Env-A 606.01 Purpose. The purpose of this part is to establish the
air pollution dispersion modeling impact analysis requirements that apply to
owners and operators of certain stationary sources in order
to demonstrate compliance with the SIP, RSA 125-C, RSA 125-I, and rules
adopted thereunder.
Source. #1375, eff 7-1-79; ss by #1717, eff 2-19-81;
ss by #2332, eff 4-29-83; ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90;
ss by #6057-B, eff 6-30-95; ss by #6342-B, eff 9-28-96; ss by #7879, eff
4-26-03; ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000,
eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 606.02 Applicability.
(a)
Except as provided in (c), below, an air pollution dispersion modeling
impact analysis shall be performed in accordance with this part as part of the
application for a permit for any of the following sources or devices:
(1) A new stationary source with any source or
device that, after construction or installation, will meet or exceed any
applicable threshold in Env-A 607.01;
(2) An existing stationary source that constructs
or installs a new process or device that, after construction or installation,
will meet or exceed any applicable threshold in Env-A 607.01;
(3) An existing stationary source that modifies
an existing source or device that meets or exceeds any applicable threshold in
Env-A 607.01, resulting in an increase in allowable emissions as follows:
a. Annual or hourly emissions of nitrogen
oxides, sulfur dioxide, or PM10; or
b. Emissions equal to or greater than 5 pounds
per hour of carbon monoxide; or
(4) Any stationary source with emissions of
regulated toxic air pollutants using the compliance demonstration method
specified in Env-A 1405.02.
(b)
An existing stationary source shall update its air pollution dispersion
modeling impact analysis performed pursuant to this part prior to making a
modification that will result in any of the following:
(1) Reduction in stack height;
(2) Increase in effective stack diameter;
(3) Obstruction of the stack exit;
(4) Change in stack exit orientation;
(5) Reduction in stack exit temperature by the
lesser of 10% or 40 degrees F;
(6) Reduction in stack flow by the lesser of 10%
or 1,000 actual cubic feet per minute; or
(7) Change in stack location.
(c)
An air pollutant emission dispersion modeling analysis for regulated air
pollutants shall not be required for any of the following devices:
(1) An emergency generator or other engines used
for mechanical power in emergencies, such as fire pump engines, where the hours
of operation are limited to 500 hours per year or less by an enforceable permit
condition;
(2) A non-metallic mineral processing plant
equipped with dust suppression controls operated to prevent, abate, and control
the emission of fugitive dust as specified in Env-A 2800;
(3) Any source or device that meets or exceeds
only VOC or HAP thresholds in Env-A 607.01;
(4) Any source or device being modeled solely to
determine compliance with Env-A 1400 in accordance with Env-A 606.02(a)(4); or
(5) Any device equipped with a vertical and
unobstructed emission stack located at a stationary source with facility-wide
allowable emission rates less than all of the
following:
a. 100 tons per calendar year of carbon
monoxide;
b. 40 tons per calendar year of nitrogen oxides;
c. 40 tons per calendar year of sulfur dioxide;
and
d. 15 tons per calendar year of PM10.
Source. #6342-B, eff 9-28-96; ss by #7879, eff
4-26-03; amd by #9791, eff 10-1-10; amd by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss
by #10000, eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 606.03 Demonstration of Compliance with Ambient
Air Quality Standards and Ambient Air Increment Values.
(a)
The owner or operator of a source shall demonstrate, using the air
pollution dispersion modeling impact analysis required in this part, that the
source will not:
(1) Cause or
contribute to a violation of any National Ambient Air Quality Standard (NAAQS)
listed in Env-A
300 that is required to be included in the analysis pursuant to Env-A
606.06(b), (c), (d), or (e); or
(2) Cause an increase in
pollutant concentration over the baseline concentration that is greater than
the value specified in 40 CFR §52.21(c) resulting from net emissions increases
at the source after the baseline date determined pursuant to 40 CFR
§52.21(a)(14), if applicable.
(b)
A source shall be considered to cause or contribute to a violation of a
NAAQS when such source’s contribution would exceed the significance levels at
any locality that does not or would not meet the applicable national standard,
as shown in table 606-1 below:
Table 606-1: NAAQS Significance
Levels
|
Pollutant |
Averaging
Time and Significance Levels |
||||
|
Annual |
24-hour |
8-hour |
3-hour |
1-hour |
|
|
SO2 |
1.0
ug/m3 |
5
ug/m3 |
|
25
ug/m3 |
|
|
PM10 |
1.0
ug/m3 |
5
ug/m3 |
|
|
|
|
PM2.5 |
0.3
ug/m3 |
1.2
ug/m3 |
|
|
|
|
NO2 |
1.0
ug/m3 |
|
|
|
|
|
CO |
|
|
0.5
mg/m3 |
|
2
mg/m3 |
Source. #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 606.04 Responsibility for Conducting Air
Pollution Dispersion Modeling Impact Analysis. The owner or operator shall file with the
department as part of the permit application for any stationary source subject
to this part one of the following:
(a)
A request that the department conduct an air pollution dispersion
modeling impact analysis; or
(b)
A protocol describing the proposed air pollution dispersion modeling
impact analysis methods, the report summarizing results of the air pollution
dispersion modeling impact analysis, and all data files necessary to verify the
results.
Source. #6342-B, eff 9-28-96; ss by #7879, eff
4-26-03; ss by #9791, eff 10-1-10; ss by #10175, eff 9-1-12 (from Env-A 606.03);
ss by #13510, eff 12-17-22
Env-A 606.05 Air Pollution Dispersion Modeling Impact
Analysis Methods.
(a)
Except as provided in (b), below, an air pollution dispersion modeling
impact analysis shall be conducted as specified in 40 CFR 51, Appendix W, using
any model or methodology, as applicable, that the administrator has specified,
referenced, or proposed for inclusion in 40 CFR 51, Appendix W.
(b)
Impacts within the property boundary from internal combustion engines
and hot mix asphalt plants shall not be included in the air pollution
dispersion modeling impact analysis provided that:
(1) The engine or plant is located at a
stationary source with a primary SIC classification of 1442 or 2951;
(2) The facility at which the
engine or plant is located is not a major stationary source as defined in Env-A
104; and
(3) The engine or plant exhausts all emissions
through a vertical and unobstructed exhaust stack.
Source. #6342-B, eff 9-28-96; ss by #7879, eff
4-26-03; ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000,
eff 10-1-11; ss by #10175, eff 9-1-12 (from Env-A 606.04); ss by #13510, eff
12-17-22
Env-A 606.06 Specific Sources, Devices, and Emissions
Included in an Air Pollution Dispersion Modeling Impact Analysis.
(a)
An air pollution dispersion modeling impact analysis for sources subject
to Env-A 606.02(a)(1), (2), or (3) shall include emissions from the following:
(1) Each source or device at the stationary
source required to do the air pollution dispersion modeling impact analysis
that meets or exceeds any applicable threshold in Env-A 607.01
and which is not exempt from inclusion pursuant to the Env-A 606.02(c); and
(2) All sources identified as nearby in
accordance with 40 CFR 51, Appendix W, that are listed in the department’s
inventory of sources that meet the applicability thresholds of this part.
(b)
Except as provided in (c), below, an air pollution dispersion modeling
impact analysis for a source subject to Env-A 606.02(a)(1), (2), or (3)a. shall
be performed for nitrogen oxides, sulfur dioxide, carbon monoxide, and PM10 emitted from the device(s) being analyzed.
(c)
The following emissions, if from sources or devices located at facility
that is not a major source as defined in Env-A 619, are not required to be
included in an air pollution dispersion modeling analysis:
(1) Nitrogen oxides emissions from sources or
devices that achieve Reasonably Available Control Technology standards
specified in Env-A 1300 for nitrogen oxide;
(2) Sulfur dioxide emissions from sources or
devices with a sulfur dioxide emission rate equal to or less than 0.025 lb/MMBtu of heat input; and
(3) PM10 emissions from sources or
devices with the following:
a. A PM emission rate equal to or less than 0.10
lb/MMBtu; or
b. A PM control device which achieves a PM
capture and control efficiency of at least 95%.
(d)
An air pollution dispersion modeling impact analysis for sources subject
to Env-A 619 shall include emissions of PM2.5. For purposes of this analysis, nearby sources
of PM2.5 shall be identified
in accordance with 40 CFR 51, Appendix W, and selected from the department’s
inventory of sources that are classified as major sources pursuant to Env-A
619.
(e)
An air pollution dispersion modeling impact analysis for sources subject
only to Env-A 606.02(a)(3)b. shall be performed for carbon monoxide only.
(f)
Except as provided in (g), below, an air pollution dispersion modeling
impact analysis for sources subject to Env-A 606.02(a)(4) shall include
emissions from each source or device at the stationary source which emits the
same regulated toxic air pollutant for which the analysis is being performed.
(g)
An air pollution dispersion modeling impact analysis for sources subject
to Env-A 606.02(a)(4) shall not include emissions from any exempt device or
process as specified in Env-A 1402.
Source. #6342-B, eff 9-28-96; ss by #7879, eff
4-26-03; ss by #9906, INTERIM, eff 4-26-11,
EXPIRES: 10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12 (from
Env-A 606.05); ss by #13510, eff 12-17-22
PART
Env-A 607 TEMPORARY PERMITS
Env-A 607.01 Specific Applicability for Temporary
Permits. The owner or operator of a
new or modified stationary source, area source, or device shall obtain a
temporary permit as specified in this chapter prior to the construction or
installation of the source or device if the source or device is any of the
following:
(a)
An external combustion device with a design gross heat input greater
than or equal to 10 million British thermal units (BTUs) per hour that
combusts:
(1) Gaseous fuel, as defined in Env-A 1302,
(2) Liquefied petroleum gas;
(3) Distillate weight liquid fuel, including but
not limited to #2 fuel oil or diesel fuel oil; or
(4) Any combination of (1) through (3), above;
(b)
An external combustion device with a design gross heat input greater
than or equal to 4 million BTUs per hour that combusts #4 fuel oil;
(c)
An external combustion device with a design
gross heat input greater than or equal to 2 million BTUs per hour that
combusts:
(1) Solid fuel;
(2) Residual weight liquid fuel, including but
not limited to #6 fuel oil;
(3) Used oil as defined in Env-A 105; or
(4) Any combination of (1) through (3), above;
(d)
One or more internal combustion devices at a source where:
(1) Each device combusts liquid fuel oil and has
a design gross heat input greater than 0.15 million BTUs per hour, and the
combined total design gross heat input for all such devices is greater than or
equal to 1.5 million BTUs per hour; or
(2) Each device combusts gaseous or liquefied
propane gas fuel and has a design gross heat input greater than 1.5 million
BTUs per hour, and the combined total design gross heat input of all such
devices is greater than or equal to 10 million BTUs per hour;
(e)
An incinerator using any combination of type 0, 1, 2, or 3 waste with a
design rating greater than or equal to 1,000 pounds per hour;
(f)
An incinerator using any combination of type 4, 5, 6, and 7 waste with a
design rating greater than or equal to 200 pounds per hour;
(g)
A stationary source, area source, or device with total actual volatile
organic compound (VOC) emissions greater than or equal to 10 tons per calendar
year;
(h)
An aboveground, vertical, VOC storage tank with a capacity greater than
or equal to 40,000 gallons and containing VOCs with a true vapor pressure
greater than or equal to 1.52 pounds per square inch absolute (psia) at 60° F;
(i) A device for loading tank trucks with
gasoline at a gasoline terminal with a throughput greater than or equal to
20,000 gallons per day;
(j)
A woodworking device that does not use a baghouse or filter for
controlling dust emissions, but which employs a pneumatic transfer system to
collect any amount of sander dust at a total wood waste transfer rate greater
than or equal to 20 tons per calendar year;
(k)
Pneumatic dust transfer equipment used to convey materials other than
wood waste into bins or silos, which equipment does not use a baghouse or
filter for controlling dust;
(l)
Subject to Env-A 603.02, a fixed non-metallic mineral processing plant
or coal crusher with a design throughput greater than or equal to 25 tons per
hour;
(m)
Subject to Env-A 603.02, a portable non-metallic mineral processing
plant or a coal crusher with a design throughput of greater than or equal to
150 tons per hour;
(n)
A stationary source, area source, or device choosing to limit its
potential to emit by accepting enforceable permit conditions, including but not
limited to any restrictions on the following:
(1) The hours of operation of the source or
device;
(2) The type or amount of material combusted,
stored, or processed; or
(3) The level of production;
(o)
A stationary source, area source, or device at which documented and
repeated violations occur of any of the applicable opacity or emission limits
specified in Env-A 400 et seq.;
(p)
A stationary source, area source, or device that is a significant
contributor to documented and repeated violations of any of the national
ambient air quality standards (NAAQS) as specified in Env-A 300, where
discovery of the violation(s) or contribution resulted from one of the
following:
(1) A direct measurement using ambient air
quality monitoring; or
(2) Calculations based on the technical
procedures adopted pursuant to 40 CFR 51, Appendix W;
(q)
A stationary source, area source, or device subject to the national
emission standards for hazardous air pollutants (NESHAP) contained in 40 CFR
61, except for sources and source categories subject to 40 CFR 61 solely for
Subpart M, NESHAP for asbestos;
(r)
A stationary source, area source, or device subject to rules governing
prevention of significant deterioration (PSD) as specified in Env-A 619;
(s)
A stationary source, area source, or device subject to rules governing
nonattainment areas as specified in Env-A 618;
(t)
A stationary source, area source, or device where a permit is required
under the rules governing regulated toxic air pollutants specified in Env-A
1400;
(u)
A stationary source, area source, or device where a permit is required
by the maximum achievable control technology (MACT) standards for source
categories as specified in 40 CFR 63;
(v)
A stationary source or device subject to the rules governing reasonably
available control technology (RACT) as contained in:
(1) Env-A 1300 for NOx emissions; or
(2) VOC RACT order provisions as stated in Env-A
1205;
(w)
A stationary source, area source, or device determined by the
department, based on modeling performed in accordance with 40 CFR 51, Appendix
W, to have a significant impact on the air quality where a permit is required
to ensure that ambient air quality standards are achieved and maintained;
(x)
A source subject to, or opting into, the Acid Rain program under title
IV of the Act;
(y)
A stationary source, area source, or device that is a major source of
hazardous air pollutants;
(z) A nitrogen oxides (NOx) budget source as
defined in Env-A
3203.17; or
(aa) A carbon dioxide (CO2)
budget source as defined in Env-A 4602.
Source. #1375, eff 7-1-79; ss by #1717, eff 2-19-81;
ss by #2332, eff 4-29-83; ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90;
ss by #6057-B, eff 6-30-95; amd by #6344, eff
9-28-96; amd by #6468-B, eff 3-5-97; amd by #6780, eff 6-27-98, EXPIRES: 10-25-98; amd by #6813, eff 7-23-98; amd by
#7615, eff 12-20-01; ss by #7879, eff 4-26-03; amd by
#8129, eff 7-28-04; amd by #9462, eff 4-22-09; amd by #9791, eff 10-1-10; amd by
#9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000, eff 10-1-11; ss
by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 607.02 Timely Application.
(a)
For an initial temporary permit, an application shall be considered
timely if it is filed with the department prior to the construction or
installation of a new or modified source or device.
(b)
For the reissuance of a temporary permit, an application shall be
considered timely if it is filed with the department at least 90 days prior to
the designated expiration date of the temporary permit.
Source. #1375, eff 7-1-79; ss by #1717, eff 2-19-81;
ss by #2332, eff 4-29-83; ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90;
ss by #6057-B, eff 6-30-95; ss by #7879, eff 4-26-03; ss by #9791, eff 10-1-10;
ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 607.03 Applications for Temporary Permits.
(a)
The owner or operator of any source or device required to obtain a
temporary permit pursuant to Env-A 607.01 shall file the original and one copy
of an application package as specified in (b) and (c), below, with the
department.
(b)
The application package shall include the following:
(1) The forms and information for the specific
source or device as specified in Env-A 1703 through Env-A 1708, as applicable;
(2) The fee(s) specified in Env-A 700, as
applicable;
(3) For a major source, all information specified
in Env-A 1709;
(4) For a major source of hazardous air
pollutants subject to 112(g) of the Act, all information required pursuant to
40 CFR §63.43(e);
(5) If an air pollution dispersion modeling
impact analysis is required pursuant to Env-A 606.02, documentation required
pursuant to Env-A 606.04;
(6) For a source subject to RSA 125-C:10-b, the
information required pursuant to Env-A 624;
(7) Certification of right, title, and interest
and, if applicable, proof of good standing, as specified in Env-A 605.02;
(8) Proof of legal authority as specified in
Env-A 605.03, if the applicant is not the legal owner or operator of the source
or device that is the subject of the application;
(9) For a source with air pollution control
equipment as defined in Env-A 102, an air pollution control equipment
monitoring plan or catalyst management plan pursuant to Env-A
810.01; and
(10) If a plan is not required pursuant to Env-A 810.01, a description of the monitoring the source intends
to conduct to demonstrate compliance with all applicable state and federal
statutes, rules, and permits, as specified in Env-A
810.02.
(c)
The information submitted pursuant to (a) and (b), above, shall contain
enough detail for the department to reach its own conclusions regarding whether
the application meets the requirements specified in Env-A 607.04.
Source. #1375, eff 7-1-79; ss by #1717, eff 2-19-81;
ss by #2332, eff 4-29-83; ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90;
ss by #6057-B, eff 6-30-95; amd by #6342-B, eff
9-28-96; amd by #6780, eff 6-27-98, EXPIRES:
10-25-98; amd by #6813, eff 7-23-98; ss by #7879, eff
4-26-03; ss by 8654, eff 6-8-06; ss by #9791, eff 10-1-10; ss by #10000, eff
10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 607.04 Review Criteria. The department shall review each application
for a temporary permit to ensure compliance with:
(a)
All applicable elements of the SIP;
(b)
Env-A 100 et seq.;
(c)
Applicable state law governing air pollution; and
(d)
Applicable requirements, as defined in Env-A 102.
Source. #1375, eff 7-1-79; ss by #1717, eff 2-19-81;
ss by #2332, eff 4-29-83; ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90;
ss by #6057-B, eff 6-30-95; amd by #6780, eff
6-27-98, EXPIRES: 10-25-98; amd by #6813, eff
7-23-98; ss by #7879, eff 4-26-03; ss by #9906, INTERIM, eff 4-26-11, EXPIRES:
10-24-11; ss by #10000, eff 10-1-11; ss by #10175,
eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 607.05 Acknowledgment and Completeness
Determinations for Temporary Permits.
Pursuant to RSA 541-A:29, I, within 30 days of receipt of
an application for a temporary permit, the department shall:
(a)
Notify the applicant that the application is complete; or
(b)
Notify the applicant of the information that is needed to complete the
application and request the applicant to submit the information.
Source. #1375, eff 7-1-79; ss by #1717, eff 2-19-81;
ss by #2332, eff 4-29-83; ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90;
ss by #6057-B, eff 6-30-95; ss by #7879, eff 4-26-03; ss by #9906, INTERIM, eff
4-26-11, EXPIRES: 10-24-11; ss by #10000, eff 10-1-11;
ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 607.06 Temporary Permit Application
Deficiencies.
(a)
Any applicant who fails to file any required information or who has
filed incorrect information in an application for issuance or amendment of a
temporary permit shall, upon becoming aware or being notified by the department
of such failure or incorrect filing, file in writing with the department such
supplementary facts or corrected information no later than 30 days after such
discovery or notification.
(b)
While processing an application that has been deemed complete, if the
department determines that the application does not contain enough detail for
the department to reach its own conclusions regarding whether the application
meets the requirements specified in Env-A 607.04, the department shall request
the applicant to provide the additional details in writing within 30 days of
receipt of the department’s request.
Source. #1375, eff 7-1-79; ss by #1717, eff 2-19-81;
ss by #2332, eff 4-29-83; ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90;
ss by #6057-B, eff 6-30-95; ss by #7879, eff 4-26-03; ss by #9791, eff 10-1-10; ss by #10000,
eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510,
eff 12-17-22
Env-A 607.07 Final Action. The department shall take final action on an
application for a temporary permit after the requirements for public notice and
hearing procedures specified in Env-A 621 have been satisfied.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03; ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000,
eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510,
eff 12-17-22
Env-A 607.08 Expiration of Temporary Permits.
(a)
The expiration date of each temporary permit shall be 18 months after
the date of its issuance.
(b)
The temporary permit shall be in effect until the designated expiration
date, unless revoked or suspended at an earlier date by the department pursuant
to RSA 125-C:13.
(c)
Unless reissued in accordance with Env-A 607.09, a temporary permit
shall expire on the expiration date listed on the temporary permit.
(d)
Except as provided in (e), below, the expiration of a temporary permit
shall terminate the authority of the owner or operator to construct or operate
a new or modified source or device pursuant to the permit.
(e)
Pursuant to RSA 541-A:30, I, the authority of the owner or operator to
construct or operate a new or modified source or device shall continue, subject
to the terms and conditions of a temporary permit that otherwise would have
expired, pending the department’s decision on:
(1)
A timely and complete application for reissuance of the temporary permit, as
specified in Env-A 607.09, if the owner or operator demonstrates that any of
the circumstances listed in Env-A 607.09(a)(1)-(5) apply; or
(2) A timely and complete application for a state
permit to operate or amendment thereto, or a title V
operating permit or amendment thereto.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03; amd by #8129, eff 7-28-04; ss by #9791, eff
10-1-10;
ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
Env-A 607.09 Permit Reissuance.
(a)
The owner or operator to whom a temporary permit was issued may request
a reissuance of the temporary permit for a period not to exceed one year,
provided that at least one of the following is met:
(1)
Actual construction has been completed by the expiration date, but any
required compliance testing has not been completed;
(2)
Actual construction has commenced by the expiration
date but has not been completed;
(3)
Actual construction has not commenced, but the owner
or operator provides a copy of at least one binding agreement or contractual
obligation which cannot be canceled or modified without substantial loss to the
owner or operator;
(4)
The owner or operator is in the process of obtaining a permit or other
authorization required for the project from another
governmental entity; or
(5) The owner or operator is involved in
litigation where a decision regarding a permit or other authorization required
for the project from another governmental entity has been issued and appealed.
(b)
To obtain a reissuance, the owner or operator shall file a written
request for a reissuance that specifies the basis for the request and includes
a certification as specified in Env-A 605.04(c).
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03; ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000,
eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510,
eff 12-17-22
Env-A 607.10 Application Shield: Temporary Permits.
(a)
If an applicant files a timely application that has been deemed complete
by the department for the reissuance of a temporary permit, the issuance of an
initial state permit to operate, or the incorporation of the provisions of a
temporary permit into an existing state permit to operate or Title V operating
permit, the failure to have a current and valid temporary permit shall not be
considered a violation of RSA 125-C:11 or Env-A 607.01 unless and until the
department denies the requested reissuance and:
(1) The applicant does
not appeal the denial within the time specified in RSA 125-C:12, III; or
(2) The denial is affirmed after all available
appeals have been exhausted.
(b)
If the department deems an application complete, but requests additional
information pursuant to Env-A 607.06(b), the protection granted in (a), above,
shall cease to apply when the applicant fails to file in writing such
additional requested information by the deadline specified in the request.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03; ss by #9791, eff 10-1-10; ss by #10175, eff 9-1-12; ss by #10175, eff
9-1-12; ss by #13510, eff 12-17-22
PART
Env-A 608 STATE PERMITS TO OPERATE
Env-A 608.01 Specific Applicability for State Permits
to Operate. The owner or operator of
any stationary source, area source, or device that is specified in Env-A 607.01
and is not required to obtain a Title V permit pursuant to Env-A 609.01 shall
file a timely and complete application for, and obtain, a state permit to
operate as specified in this chapter.
Source. #721.16 eff 12-7-75; amd
by #1375, eff 7-1-79; ss by #1717, eff 2-19-81; ss by #2332, eff 4-29-83; ss by
#2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss by #6057-B, eff 6-30-95; ss
by #7879, eff 4-26-03; ss by #9791, eff 10-1-10; ss by #10000, eff 10-1-11; ss
by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 608.02 Timely Applications for Issuance or
Renewal of State Permits to Operate.
(a)
For a source or device that has been issued a temporary permit, an
application for an initial state permit to operate or the incorporation of the
provisions of the temporary permit into an existing state permit to operate
shall be considered timely if it is filed with the department at least 90 days
prior to the designated expiration date of the temporary permit.
(b)
For a source or device that has been issued a state permit to operate,
an application for renewal of the permit shall be considered timely if it is
filed with the department at least 90 days prior to the designated expiration
date of the current state permit to operate.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03; ss by #9791, eff 10-1-10; ss by #10000, eff 10-1-11; ss by #10175, eff
9-1-12; ss by #13510, eff 12-17-22
Env-A 608.03 Application Procedures For State Permits
to Operate.
(a)
The owner or operator of any source or device required to obtain a state
permit to operate pursuant to Env-A 608.01 shall file the original and one copy
of an application package for the permit as specified in (b) and (c), below,
with the department.
(b)
The application package shall include the following:
(1)
The forms and information for the specific source or device as specified
in Env-A 1703 through Env-A 1708, as applicable;
(2)
The fee(s) specified in Env-A 700, as
applicable;
(3)
If an air pollution dispersion modeling impact analysis is required
pursuant to Env-A 606.02, documentation required pursuant to Env-A 606.04;
(4) Certification of right, title,
and interest and, if applicable, proof of good standing, as specified in Env-A
605.02;
(5)
Proof of legal authority as specified in Env-A 605.03, if the applicant
is not the legal owner or operator of the source or device that is the subject
of the application;
(6)
For a source with air pollution control equipment, as defined in Env-A 102,
an air pollution control equipment monitoring plan or catalyst management plan
pursuant to Env-A 810.01; and
(7)
If a plan is required pursuant to Env-A 810.01,
a description of the monitoring the source intends to conduct to demonstrate
compliance with all applicable state and federal statutes, rules, and permits,
as specified in Env-A 810.02.
(c)
The information submitted pursuant to (a) and (b), above, shall contain
enough detail for the department to reach its own conclusions regarding whether
the application meets the requirements specified in Env-A 608.04.
Source. #6057-B, eff 6-30-95; amd
by #6342-B, eff 9-28-96; ss by #7879, eff 4-26-03; ss by #9791, eff 10-1-10; ss
by #10000, eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 608.04 Review Criteria. The department shall review each application
for a state permit to operate to ensure compliance with:
(a)
All applicable elements of the SIP;
(b)
Env-A 100 et seq.; and
(c)
Applicable state law governing air pollution.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03; ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000,
eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 608.05 Acknowledgment and Completeness
Determinations for State Permits to Operate. Pursuant to RSA 541-A:29, I, within 30 days
of receipt of an application for a state permit to operate, the department
shall:
(a)
Notify the applicant that the application is complete; or
(b)
Notify the applicant of the information that is needed to complete the
application and request the applicant to file the information with the
department in accordance with Env-A 608.06(a).
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03; ss by #7879, eff 4-26-03; ss by #9906, INTERIM, eff 4-26-11, EXPIRES:
10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510,
eff 12-17-22
Env-A 608.06 State Permit to Operate Application
Deficiencies.
(a)
Any applicant who fails to file any required information or who has
filed incorrect information in an application for issuance or amendment of a
state permit to operate shall, upon becoming aware or being notified by the
department of such failure or incorrect filing, file in writing with the
department such supplementary facts or corrected information no later than 30
days after such discovery or notification.
(b)
While processing an application that has been deemed complete, if the
department determines that the application does not contain enough detail for
the department to reach its own conclusions regarding whether the application
meets the requirements specified in Env-A 608.04, the department shall request
the applicant to provide the additional details in writing within 30 days of
receipt of the department’s request.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03; ss by #9791, eff 10-1-10; ss by #10000, eff 10-1-11; ss by #10175, eff
9-1-12; ss by #13510, eff 12-17-22
Env-A 608.07 Final Action. The department shall take final action on an
application for a state permit to operate after the requirements for public
notice and hearing procedures specified in Env-A 621 have been satisfied.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03; ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000,
eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 608.08 Permit Expiration.
(a)
The state permit to operate shall be in effect until the designated
expiration date, unless sooner revoked or suspended by the department pursuant
to RSA 125-C:13.
(b)
The expiration of a state permit to operate shall terminate the right to
operate under the permit unless a timely and complete renewal application has
been filed with the department.
(c)
After a timely and complete application for renewal is filed with the
department, the owner or operator may continue to operate under the terms and
conditions of the expired state permit to operate until the department has
taken final action on the renewal application.
(d)
If the department denies the renewal application, the owner or operator
shall cease to operate as of:
(1) The date of the
denial, if the applicant does not appeal the denial within the time specified
in RSA 125-C:12, III; or
(2) The date the denial is
affirmed after all available appeals have been exhausted.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03; ss by #9791, eff 10-1-10; ss by #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 608.09 Permit Renewal And Expiration Date
Established.
(a)
Each state permit to operate shall be issued for a period of 5 years and
shall be renewed in accordance with Env-A 608.10.
(b)
The amendment or modification of a state permit to operate shall not
affect the permit expiration date contained in the permit.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03; ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #9791, eff
10-1-10; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 608.10 Permit Renewal.
(a)
The owner or operator shall file with the department an application for
permit renewal at least 90 days prior to the designated expiration date of the
existing state permit to operate.
(b)
The owner or operator shall pay to the department any
applicable fee as established in Env-A 700 with the application for permit
renewal.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03; ss by #9791, eff 10-1-10; ss by #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 608.11 Permit Reissuance.
(a)
The owner or operator may request a reissuance of a state permit to
operate for a period not to exceed 2 years if:
(1)
Required compliance testing is not complete by the designated expiration
date;
(2)
The owner or operator is in the process of obtaining a permit or permits
from another governmental entity;
(3)
The owner or operator is involved in a dispute
where a permit from another governmental entity has been issued and appealed;
or
(4) The operation of the device or
source will be discontinued within 2 years after the designated expiration
date.
(b)
The owner or operator shall file a written request for a reissuance,
specifying the basis for such request and including a certification pursuant to
Env-A 605.04(c), with the department at least 90 days prior to the designated
expiration date of a state permit to operate.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03; ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000,
eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 608.12 Application Shield: State Permits to
Operate.
(a)
If an applicant files a timely application for a state permit to operate
which the department has deemed complete, the failure to have a current state
permit to operate shall not be considered a violation of RSA 125-C:11,I, or
Env-A 608.01, unless and until the department denies the requested permit and:
(1) The applicant does not appeal the denial
within the time specified in RSA 125-C:12, III; or
(2) The denial is
affirmed after all available appeals have been exhausted.
(b)
If the department deems an application complete but requests additional
information pursuant to Env-A 608.06(b), the protection granted in (a), above,
shall cease to apply if the applicant fails to file in writing such additional
requested information by the deadline specified in the request.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03; ss by #9791, eff 10-1-10; ss by #10175, eff 9-1-12; ss by #13510, eff
12-17-22
PART
Env-A 609 TITLE V OPERATING PERMITS
Env-A 609.01 Specific Applicability.
(a)
For the operation of any stationary source, area source, or device
specified below, and which is not specifically exempted by (b), the owner or
operator shall obtain a title V operating permit in lieu of a state permit to
operate as specified under Env-A 608 for the following:
(1)
Any major source;
(2)
Any source subject to a standard, limitation, or other
requirement under section 111 of the Act;
(3)
Any source subject to a standard or other requirement under section 112
of the Act, except that a source shall not be required to obtain a title V
operating permit solely because it is subject to regulations or requirements
under section 112(r) of the Act;
(4)
Any affected source as that term is defined in
title IV of the Act; and
(5) Any source in a source
category designated by the administrator pursuant to 40 CFR §70.3.
(b)
The following shall be exempt from the obligation to obtain a title V
operating permit:
(1)
All sources and source categories that would be required to obtain a
title V operating permit solely because they are subject to 40 CFR 60, subpart
AAA, NSPS for New Residential Wood Heaters; and
(2)
All sources and source categories that would be required to obtain a
title V operating permit solely because they are subject to 40
CFR §61, subpart M, NESHAP for Asbestos, section 61.145
Standards for Demolition and Renovation.
(c)
The following shall be temporarily exempt from the obligation to obtain
a title V operating permit, as indicated:
(1)
All sources listed in (a), above that are not major sources, affected
sources as defined in title IV of the Act, or solid waste incineration units
required to obtain a title V operating permit pursuant to section 129(e) of the
Act, until such time as the administrator completes a rulemaking to determine
how the program should be structured for nonmajor sources and the
appropriateness of any permanent exemptions in addition to those provided for
in (c)(2), below; and
(2) All nonmajor sources subject to a standard
or other requirement under either section 111 or section 112 of the Act after July
21, 1992, until such time as the administrator determines not to exempt any or
all such applicable sources from the requirement to obtain a title V operating
permit at the time that the new standard is promulgated.
(d)
Pursuant to 40 CFR §70.3(b)(3), a source that is exempt
from being required to obtain a title V operating permit may apply for a title
V operating permit.
Source. #1375, eff 7-1-79; rpld
by #1615, eff 7-31-80; ss by #1717, eff 2-19-81; ss by #2332, eff 4-29-83; ss
by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss by #6057-B, eff 6-30-95;
amd by #6468-B, eff 3-5-97; ss by #7879, eff 4-26-03;
ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000, eff 10-1-11;
ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 609.02 Issuance of Title V Operating Permits. A title V operating
permit shall be issued by the department and shall remain in effect until the
expiration date, or any suspension or revocation date designated by the
department pursuant to RSA 125-C:13.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03; ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000,
eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 609.03 Exempt Activities.
(a)
A list of exempt activities shall not be included in an application for a title V operating permit.
(b)
Exempt activities shall not be subject to emission-based fees specified
in Env-A 705.
(c)
The following activities shall be classified as exempt activities:
(1)
Open burning activities conducted in accordance with Env-A 1000;
(2)
Activities such as copying and duplication activities performed in an
office, and use of typewriters, printers, blueprinting, and pens;
(3)
Interior maintenance activities, such as janitorial cleaning and the use
of cleaning products and air fresheners other than the cleaning of any process
equipment except as allowed under (15), below;
(4)
The use of bathroom and locker room ventilation;
(5)
The activities of maintenance limited to
welding, gluing, painting of process equipment and soldering, but excluding VOC
degreasing operations;
(6)
First aid or emergency medical care provided at the facility, including
related activities such as sterilization of equipment and medicine preparation;
(7)
Laundry operations, other than dry-cleaning, to service uniforms or
clothing used at the facility;
(8)
Architectural maintenance activities conducted to take care of the
buildings and structures at the facility, including repainting, roofing, and
sandblasting, unless subject to an applicable requirement;
(9)
Exterior maintenance activities conducted to take care of the grounds of
the facility, including lawn care and pest controls;
(10)
Food preparation, including barbecuing for service facility cafeterias
and dining rooms, but excluding such activities which are connected to
preparation of packaged food for off-site consumption;
(11)
The use of portable space heaters which can be carried
and relocated by an employee;
(12)
The use of steam vents that do not emit any regulated air pollutants,
regulated toxic air pollutants, or hazardous air pollutants (HAPs);
(13)
The venting of particulate emissions from processes equipped with
removal equipment and which are vented inside the building;
(14)
The use of laboratory ventilation hoods for educational or research and
development facilities, excluding hoods used for any production or pilot
processes, unless otherwise regulated under section 112 of the Act;
(15)
The use of consumer products in a manner consistent with how the general public would use the product;
(16)
The use of fire control equipment, including maintenance and employee
training;
(17)
The characterization of waste sites and feasibility tests;
(18)
The venting of emissions from mobile equipment and off-road equipment
such as automobiles, forklifts, trucks, and construction equipment, except for
air conditioning systems regulated under section 609 of the Act; and
(19)
The venting of emissions from cooling towers, evaporators, or heating,
ventilation, and air conditioning (HVAC) systems that do not emit regulated air
pollutants, carbon monoxide (CO), regulated toxic air pollutants, or HAPs,
except for devices subject to a MACT standard under 40 CFR 63, or devices
subject to title VI of the Act.
Source. #6057-B, eff 6-30-95; amd
by #6468-B, eff 3-5-97; ss by #7879, eff 4-26-03; ss by #9906, INTERIM, eff
4-26-11, EXPIRES: 10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
Env-A 609.04 Insignificant Activities.
(a)
A list of insignificant activities shall be included in an application
for a title V operating permit.
(b)
Emissions from activities identified as insignificant activities in (d),
below shall be quantified.
(c)
Insignificant activities shall be subject to emission-based fees
specified in Env-A 705.
(d)
A device, source, or activity that is not an exempt activity under Env-A
609.03 shall be classified as an insignificant activity if it:
(1) Is below any applicable
threshold specified in Env-A 607.01;
(2) Emits less than
1,000 lbs. per year of all regulated air pollutants, other than GHGs, in
aggregate; and
(3) Emits less than 200 tons per year of CO2e.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03; amd by #8129, eff 7-28-04; amd by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss
by #10000, eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 609.05 Permit Content: Title V Operating Permits.
(a)
Each title V operating permit issued by the department shall establish
the parameters under which the source or device to which it applies shall be
operated. Upon issuance of a title V
operating permit, the owner or operator shall comply with all such terms and
conditions.
(b)
Each title V operating permit issued under this chapter shall contain all of the elements required by 40 CFR §70.6 (a) through
(c), except that the expiration date and frequency of renewal of each title V
operating permit shall be as specified in Env-A 609.16.
(c)
Except as provided in 40 CFR §70, each title V
operating permit issued under this part shall include a permit shield as
specified in Env-A 609.09.
Source. #6057-B, eff 6-30-95; amd
by #6342-B, eff 9-28-96; ss by #7879, eff 4-26-03; ss by #9906, INTERIM, eff
4-26-11, EXPIRES: 10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
Env-A 609.06 Application Procedures For Title V
Operating Permits.
(a)
The owner or operator of any source or device required to obtain a title
V operating permit pursuant to Env-A 609.01 shall file an application for such
permit with the department.
(b)
The application shall include the following:
(1) Complete application forms provided by the
department as described in Env-A 1703 through Env-A 1708;
(2) All information specified in Env-A 1709;
(3) Certification of right, title, and interest
and, if applicable, proof of good standing, as specified in Env-A 605.02;
(4) The fee(s) specified in Env-A 702 through
Env-A 705, as applicable;
(5) If an air pollution dispersion modeling
impact analysis is required pursuant to Env-A 606.02, documentation pursuant to
Env-A 606.04;
(6) For a source with air pollution control
equipment as defined in Env-A 102, an air pollution control equipment
monitoring plan or catalyst management plan pursuant to Env-A
810.01;
(7) If a plan is not required pursuant to Env-A 810.01, a description of the monitoring the source intends
to conduct to demonstrate compliance with all applicable state and federal
statutes, rules, and permits, as specified in Env-A
810.02; and
(8) A compliance assurance
monitoring (
(c)
The owner or operator shall present the information required under this
section in sufficient detail for the department to evaluate the subject source
and the application to determine all applicable requirements.
(d)
Upon filing an original application for a title V operating permit and
one copy thereof with the department, the applicant shall forward a second copy
of the items identified in (b)(1) and (b)(2), above, to the EPA.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03; ss by #9791, eff 10-1-10; ss by #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 609.07 Timely Application.
(a)
For an initial title V operating permit, an application shall be
considered timely if it is filed with the department according to the following
schedule:
(1) Subject to (2), below, each source that
becomes subject to the title V program after June 30, 1995
shall file a title V operating permit application no later than 12 months after
becoming subject to the title V program or commencing operation pursuant to a
temporary permit;
(2) Each major source required to meet the
requirements of section 112(g) of the Act or to have a permit under
the preconstruction review program approved as part of the New Hampshire SIP
under parts C or D of title I of the Act, shall file a permit application to
obtain a title V operating permit or title V operating permit revision within
12 months of commencing operation; and
(3) Any source that becomes
subject to the provisions of section 112(j) of the Act shall file a title V operating permit application in accordance with
the provisions of section 112(j) and 40 CFR §63.50 through 63.56.
(b)
For the renewal of a title V operating permit, an application shall be
considered timely if it is filed with the department at least 6 months prior to
the designated expiration date of the current title V operating permit.
(c)
For a source or device with an existing title V operating permit that
has also been issued a temporary permit, has completed construction, and has
demonstrated compliance through testing, an application to incorporate the
conditions of the temporary permit into the title V operating permit shall be
considered timely if it is filed with the department at least 90 days prior to
the designated expiration date of the temporary permit.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03; ss by #9791, eff 10-1-10; ss by #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 609.08 Application Shield: Title V Operating
Permits.
(a)
If an applicant files a timely and complete application for the issuance
or renewal of a title V operating permit, the failure to have a title V
operating permit shall not be considered a violation of this part unless and
until the department denies the requested permit and:
(1) The applicant
does not appeal the denial within the time specified in RSA 125-C:12, III; or
(2) The denial is affirmed after all available
appeals have been exhausted.
(b)
The protection granted in (a), above, shall cease to apply if the
applicant fails to file in writing any information requested by the department
pursuant to Env-A 609.12, by the deadline specified.
Source. #6057-B, eff 6-30-95; amd
by #7483, eff 4-26-01; ss by #7879, eff 4-26-03; ss by #9791, eff 10-1-10; ss
by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 609.09 Permit Shield: Title V Operating Permits.
(a)
A permit shield shall state that compliance with the conditions of the
title V operating permit will be deemed in compliance with any applicable
requirement and any state requirement as of the date of permit issuance,
provided that:
(1)
All such applicable requirements and all such state requirements found
in Env-A 100 et seq. are specifically identified and
included in the title V operating permit;
(2)
Requirements excluded from the title V
operating permit are specifically identified by the department as not
applicable to the stationary source or area source; and
(3)
The title V operating permit includes that determination or a permit
condition that incorporates that determination by reference.
(b)
A permit shield shall apply only to those conditions incorporated into a
title V operating permit through:
(1)
Issuance of an initial title V operating permit;
(2)
Issuance of a renewal of a title V operating permit;
(3)
A change made pursuant to the procedures for significant permit
modification found in Env-A 612.06; or
(4)
A change made pursuant to the procedures for an administrative permit
amendment, provided that the administrative permit amendment:
a. Incorporates only those changes of an initial
temporary permit or an extended temporary permit that were subject to the same
review procedures used for a significant permit modification found in Env-A
612, including an opportunity for public comment; and
b. Meets all requirements of 40 CFR §70.6, §70.7, and §70.8.
(c)
A permit shield shall not apply to those conditions incorporated into a
title V operating permit through:
(1)
Administrative permit amendment except as provided for in (b)(4), above;
(2)
Changes to insignificant source operations;
(3)
Changes made pursuant to Env-A 612.02(d) or (e); or
(4)
Minor permit modifications made in accordance with Env-A 612.05.
(d)
If a title V operating permit issued by the department does not
expressly include or exclude an applicable requirement or a state requirement
found in Env-A 100 et seq., that applicable requirement or state
requirement shall not be covered by the permit shield and the applicant, owner,
or operator shall comply with the provisions of the requirement to the extent
that it applies to the applicant, owner, operator, stationary source, area
source, or device.
(e)
If the department determines that a title V operating permit was issued
based on inaccurate or incomplete information provided by the applicant, owner
or operator of a stationary source, area source, or device, any permit shield
provision in the title V operating permit shall be void as to the portions of
the title V operating permit which are affected, directly or indirectly, by the
inaccurate or incomplete information.
(f) Nothing contained in this section
shall alter or affect the ability of the department to reopen a title V operating permit for cause pursuant to Env-A
609.19 or to exercise its summary abatement authority pursuant to RSA 125-C:15,
I.
(g)
Nothing contained in this section or in any title V operating permit
issued by the department shall alter or affect the following:
(1)
The ability of the department to order abatement requiring immediate
compliance with applicable requirements upon finding that there is an imminent
and substantial endangerment to public health, welfare, or the environment;
(2)
The state of
(3)
The provisions of section 303 of the Act regarding emergency orders
including the authority of the administrator under that section;
(4)
The liability of an owner or operator of a source for any violation of
applicable requirements prior to or at the time of permit issuance;
(5)
The applicable requirements of the acid rain program, consistent with
section 408(a) of the Act;
(6)
The ability of the department or the administrator to obtain information
about a stationary source, area source, or device from the owner or operator
pursuant to section 114 of the Act; or
(7)
The ability of the department or the administrator to enter, inspect,
and monitor a stationary source, area source, or device.
Source. #6057-B, eff 6-30-95; amd
by #6780, eff 6-27-98, EXPIRES: 10-25-98; amd by
#6813, eff 7-23-98; ss by #7879, eff 4-26-03; ss by #9906, INTERIM, eff
4-26-11, EXPIRES: 10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
Env-A 609.10 Department Review of Applications. The department shall review each application
for a title V operating permit to ensure compliance with:
(a)
All applicable elements of the SIP;
(b)
Env-A 100 et seq.;
(c)
Applicable state law governing air pollution; and
(d)
Applicable requirements as defined in Env-A 102.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03; ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000,
eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 609.11 Acknowledgment and Completeness
Determinations for Title V Operating Permits. Pursuant to 40 CFR 70.5(a)(2), within 60 days
of receipt of an application for the issuance or renewal of a
title V operating permit the department shall:
(a)
Notify the applicant that the application is complete; or
(b)
Notify the applicant of the information that is needed to complete the
application and request the applicant to file the information.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03; ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000,
eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 609.12 Application Deficiencies.
(a)
An applicant who fails to file any required information or who has filed
incorrect information in any permit application shall, upon being notified by
the department or otherwise becoming aware of such failure or incorrect filing,
file in writing to the department such supplementary facts or corrected
information no later than 30 days after such discovery or notification.
(b)
Prior to the date of release of the draft permit, an applicant shall
provide supplemental information to the department as necessary to address any
applicable requirements to which the source becomes subject after the date the
application has been deemed complete.
(c)
Pursuant to 40 CFR §70.5, if the department determines that additional
information is necessary in order to evaluate or to take final action on that
application while processing an application that has been previously deemed
complete, the department shall request that such information be filed in
writing, and specify the date by which it shall be filed.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03; ss by #9791, eff 10-1-10; ss by #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 609.13 Final Action.
(a)
The department shall take final action on an application for a title V operating permit by issuing or denying a proposed
permit after the public notice and hearing procedures specified in Env-A 622
and the provisions for notice to affected states specified in Env-A 622.03 have
been satisfied.
(b)
Notwithstanding (a), above, the department shall take final action on an
application for a title V operating permit as specified below:
(1) Pursuant to 40 CFR §70.4(b)(6), the
department shall take final action on an application for issuance of a title V operating permit within 18 months of the date on
which the department deems an application complete; and
(2) The department shall take final action on an
application for an acid rain affected source in
accordance with the deadlines contained in title IV of the Act and the
regulations promulgated thereunder.
(c)
Pursuant to 40 CFR §70.7(a)(3), the department shall give priority to taking action on an application for construction or
modification under title I, parts C and D of the Act.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03; ss by #8129, eff 7-28-04; ss by #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 609.14 Department Action Following EPA Objection.
(a)
The department shall not issue a proposed title V operating permit if
EPA files a written objection with the department within 45 days of its receipt
of:
(1) The proposed title V operating permit
referenced in Env-A 622.04(b); or
(2) The department’s notice, referenced in Env-A
622.03(c), that it is not incorporating into a permit all comments of an
affected state.
(b) Within 90 days after receipt of an
objection by EPA, the department shall revise the proposed title V operating
permit and forward to EPA a copy of the revised permit in response to the
objection.
(c)
Pursuant to 40 CFR §70.8(c)(4), if the department fails
to take the action specified in (b), above, EPA may issue or deny the permit in
accordance with the provisions of the federal title V permit program.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03; amd by #8129, eff 7-28-04; amd by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss
by #10000, eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 609.15 Permit Expiration.
(a)
A title V operating permit shall be in effect until the expiration date
unless the department suspends the permit in accordance with the provisions of
RSA 125-C:13 and Env-A 609.19.
(b)
The expiration of a title V operating permit shall terminate the owner
or operator’s right to operate under the permit unless the owner or operator
files a timely and complete renewal application with the department.
(c)
After a timely and complete renewal application is filed with the
department, the owner or operator may continue to operate under the terms and
conditions of the expired title V operating permit until the department has
taken final action on the renewal of the application.
(d)
If the department denies the renewal application, the owner or operator
shall cease to operate as of:
(1) The date of the denial, if applicant does not
appeal the denial within the time specified in RSA 125-C:12, III; or
(2) The date the denial is affirmed after all
available appeals have been exhausted.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03; ss by #9791, eff 10-1-10; ss by #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 609.16 Permit Renewal and Expiration Date
Established.
(a)
Each title V operating permit shall be issued for a period of 5 years
and may be renewed in accordance with Env-A 609.18.
(b)
The amendment or modification of a title V operating permit shall not
affect the permit expiration date contained in the permit.
(c)
The acid rain portion of a title V operating permit shall be issued for
a period of 5 years and shall be renewed in accordance with Env-A 611.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03; ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000,
eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 609.17 Notification of Need for Permit Renewal.
(a)
The department shall notify the owner or operator as specified in (b),
below that the owner or operator's title V operating permit is scheduled to
expire.
(b)
Each renewal notice shall:
(1) Be in writing;
(2) Specify the procedures for filing an
application for permit renewal; and
(3) Be sent by certified mail no less than 12
months prior to the designated expiration date of the current title V operating
permit.
(c)
Failure to receive the notice described in this section shall not
relieve the owner or operator of the source or device of the obligation to
apply for permit renewal.
Source. #6057-B, eff 6-30-95; amd
by #6342-B, eff 9-28-96; ss by #7879, eff 4-26-03; ss by #9906, INTERIM, eff
4-26-11, EXPIRES: 10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
Env-A 609.18 Criteria for Permit Renewal.
(a)
The department shall determine permit conditions under which a title V
operating permit shall be renewed based on:
(1) All definitions and
requirements of Env-A 100 et seq. and the Act; and
(2) The owner or operator’s compliance status
with the conditions of the existing permit and all applicable requirements of
Env-A 100 et seq. and the Act.
(b)
The department shall take final action on a permit renewal of a title V
operating permit by issuing a permit renewal only if:
(1) The owner or operator has
filed a complete application for renewal with the department, which includes:
a. All fees specified in Env-A 702 through Env-A
705, as applicable;
b. Certification
of right, title, and interest and, if applicable, proof of good standing, as
specified in Env-A 605.02;
c. If an air pollution dispersion modeling
impact analysis is required for a source or device pursuant to Env-A 606.02,
documentation pursuant to Env-A 606.04;
(2) The requirements for
public participation specified in Env-A 622 have been satisfied;
(3) The requirements for notifying and responding
to affected states as specified in Env-A 622.03, have been satisfied;
(4) The conditions of the proposed title V
operating permit provide for compliance with all requirements of Env-A 100 et
seq. and the Act; and
(5) The EPA has received a copy of the proposed
title V operating permit and any notices required, and
has not objected to the issuance of such permit within the time
period specified in 40 CFR §70.8(c).
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03; ss by #9791, eff 10-1-10; ss by #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 609.19 Permit Reopenings for Cause.
(a)
The department shall reopen and revise a title
V operating permit for cause if any of the following circumstances exist:
(1) An additional applicable requirement, adopted
after the date of issuance of a title V operating permit, becomes applicable
for a source having a permit with 3 or more years remaining prior to the
expiration date of the permit;
(2) An additional requirement
becomes applicable to an affected unit under the acid rain program;
(3) The title V operating permit contains a
material mistake or inaccurate statement in the emissions standards or other
conditions of the title V operating permit; or
(4) A determination is made by EPA or the
department pursuant to 40 CFR §70.7(f)(1)(iv) that the title V operating permit shall be
suspended or revoked and reissued to ensure compliance with the applicable
requirements.
(b)
In a proceeding to reopen and reissue a permit, the department shall:
(1) Provide notice of intent to reopen and
reissue to the owner or operator at least 30 days prior to the date that the
permit is to be reopened; and
(2) Follow the same procedures as apply to
initial permit issuance, including public notice and hearing, notice to
affected states, and EPA review, as specified in Env-A 622.
(c)
Only those parts of a title V operating permit for which cause to reopen
exists shall be affected by proceedings under this
section.
(d)
Where the reopening of a permit is the result of the promulgation of a
new applicable requirement, the department shall reopen and reissue the permit
no later than 18 months after promulgation of the applicable requirement.
(e)
Where the reopening of a permit is the result of a finding by EPA that cause to reopen exists, the department shall:
(1) Within 90 days of receipt of notification of
such a finding, forward to EPA a proposed determination of termination,
modification, or revocation and reissuance, as appropriate;
(2) Provide a 90-day period to EPA to review the
proposed determination; and
(3) Upon the expiration of
EPA's 90-day review period, terminate, modify, or revoke and reissue, as
appropriate.
(f)
Where the reopening of a permit is the result of an objection by EPA
filed as a result of a citizen petition to EPA
pursuant to Env-A 614, the department shall, within 90 days of receipt of such
an objection, resolve the objections by terminating, modifying, or revoking and
reissuing the permit.
(g)
The department shall issue a revised title V operating permit as
required by EPA if a citizen petition is filed in accordance with Env-A 614 and
the title V operating permit was revoked by EPA.
Source. #7879, eff 4-26-03; ss by #9906, INTERIM, eff
4-26-11, EXPIRES: 10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
PART
Env-A 610 GENERAL STATE PERMITS AND
GENERAL PERMITS UNDER TITLE V
Env-A 610.01 Purpose. The purpose of this part is to establish a
general permit program which will reduce the administrative burden for owners
and operators of certain stationary sources, area sources, and devices while
achieving increased consistency in regulating particular source categories in
order to maintain the ambient air quality and the ambient air limits that have
been established pursuant to federal and state statutes and rules.
Source. #1375, eff 7-1-79; amd
by #1615, eff 7-31-80; ss by #1717, eff 2-19-81; amd
by #1922, eff 1-18-82; ss by #2332, eff 4-29-83; ss by #2605, eff 1-26-84; ss
by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss by #5626, eff 5-25-93; ss
and moved by #6057-B, eff 6-30-95 (see Env-A 622); ss by #6782-B, eff 6-30-98;
ss by #7879, eff 4-26-03; ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000, eff 10-1-11; ss by
#10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 610.02 Applicability. The general state permit program shall apply
to:
(a)
A stationary source, area source, or device that requires a temporary
permit in accordance with Env-A 607 or a state permit to operate in accordance
with Env-A 608, except where a permit is required under the rules governing
regulated toxic air pollutants specified in Env-A 1400;
(b)
A stationary source, area source, or device whose facility-wide actual
emissions are less than the major source threshold levels; and
(c)
A stationary source, area source, or device for which a source category
has been developed in accordance with this part.
Source. #1375, eff 7-1-79; ss by #1717, eff 2-19-81;
ss by #2332, eff 4-29-83; ss by #2605, eff 1-26-84; ss by #2938, eff 12-27-84;
ss by #5033, eff 12-27-90; ss by #5626, eff 5-25-93; ss and moved by #6057-B,
eff 6-30-95 (see Env-A 622); amd by #6342-B, eff
9-28-96; ss by #6782-B, eff 6-30-98; ss by #7879, eff 4-26-03; ss by #9906,
INTERIM, eff 4-26-11, EXPIRES: 10-24-11;
ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 610.03 Definition. For the purpose of
this part, the following definition shall apply:
(a)
“Emergency generator” means “emergency
generator” as defined in Env-A 103.
Source. #8129, eff 7-28-04; amd
by #9119-B, eff 4-3-08; ss by #9791, eff 10-1-10; ss by #10175, eff 9-1-12; ss
by #13510, eff 12-17-22
Env-A 610.04 Source Categories for General State
Permits.
(a)
Source categories shall be established by the department using the
criteria in Env-A 610.05(b)(3).
(b)
The following shall be source categories for general state permits:
(1) An internal combustion engine used as an
emergency generator or
other engines used for mechanical power in emergencies, such as fire pump
engines, that operates no
more than 500 hours per year during any consecutive 12-month period;
(2) A paper, fabric, film or foil substrate
coating source subject to Env-A 1207 with theoretical potential VOC
emissions less than 25 tpy;
(3) A miscellaneous metal and plastic
parts and products coating source subject to Env-A 1212 with theoretical
potential VOC emissions less than 50 tpy;
(4) A rotogravure and flexographic printing
source subject to Env-A 1215 with theoretical potential VOC emissions less than
50 tpy;
(5) A flexible-packaging
printing source subject to Env-A 1215 with theoretical potential VOC emissions
less than 25 tpy;
(6)
An offset lithographic or letterpress
printing source subject to Env-A 1216 with theoretical potential VOC emissions
less than 25 tpy; and
(7) A miscellaneous
industrial adhesives source subject to Env-A 1220 with theoretical potential
VOC emissions less than 50 tpy.
Source. #6782-B, eff 6-30-98; ss by #7879, eff
4-26-03; ss by #8129, eff 7-28-04; ss by #9791, eff 10-1-10; ss by #10175, eff
9-1-12; ss by #13510, eff 12-17-22
Env-A 610.05 Petitions to Establish Source Categories
for General State Permits.
(a)
Any person may petition the department pursuant to RSA 541-A:4 to
establish a new source category for a general state permit.
(b)
The petition under (a), above, shall contain the following:
(1) A statement that the petition is for the
establishment of a source category for a general state permit;
(2) The title and description of the source
category being proposed; and
(3) Information that shows that the proposed
source category meets the following criteria:
a. The stationary source, area source, or
devices that would be covered by the proposed source category meet the specific
applicability requirements for a state permit to operate in accordance with the
provisions of Env-A 608;
b. More than one stationary source, area source,
or device would be covered by the proposed source category; and
c. The stationary sources, area sources, or
devices that would be covered by the proposed source category are all subject
to the same regulatory requirements.
(c)
Within 10 days of the receipt by the
department of the petition filed by the petitioner, the department shall notify
the petitioner that the information is complete, or
identify the information necessary to complete the petition and request that
such information be filed within 30 days of such request.
Source. #6782-B, eff 6-30-98; ss by #7879, eff
4-26-03; ss by #9791, eff 10-1-10; ss by #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 610.06 Decision to Grant or Deny the Petition.
(a)
The department shall grant the petition if the proposed source category
meets the criteria specified in Env-A 610.05(b)(3).
(b)
The department shall deny the petition if:
(1) The petitioner fails to respond to the
department's request in Env-A 610.05(c); or
(2) The proposed source category does not meet
the criteria specified in Env-A 610.05(b)(3).
(c)
If the department denies the petition, the department shall notify the
petitioner and shall specifically identify the reason(s) for the denial.
Source. #6782-B, eff 6-30-98; ss by #7879, eff
4-26-03; ss by #8129, eff 7-28-04; ss by #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 610.07 Procedures for Establishing a General
State Permit. If the department
grants the petition, the department shall proceed in accordance with Env-A 620
to establish a general state permit for the approved source category.
Source. #6782-B, eff 6-30-98; ss by #7879, eff
4-26-03; ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000,
eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 610.08 Procedures for Registering to Operate
Under a General State Permit.
(a)
Once a general state permit has been developed for a particular source
category, the owner or operator of a stationary source, area source, or device
seeking to operate under the general state permit shall file a registration
package as described in (b), below, with the department.
(b)
The registration package shall contain the following:
(1) A completed Form ARD-1, as specified in Env-A
1703, “Form ARD-1, General Facility Information,” signed by the registrant and,
if applicable, a completed Form GSP-2 (dated March 16, 2015) signed by the
registrant, available in Appendix D or as noted in Appendix A;
(2) The fee(s) specified in Env-A 702 through
Env-A 705, as applicable; and
(3) Certification of right, title, and interest and,
if applicable, proof of good standing, as specified in Env-A 605.02;
Source. #6782-B, eff 6-30-98; ss by #7879, eff
4-26-03; ss by #8129, eff 7-28-04; ss by #7879, eff 4-26-03; ss by #9791, eff
10-1-10; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 610.09 Department Review of Registration Package.
(a)
The department shall review each registration package for a general
state permit to ensure complete and accurate information is filed in accordance
with Env-A 610.08.
(b)
If the department finds the registration package to be complete and
accurate, within 15 days of receipt by the
department of the registration package filed by the source, the department,
pursuant to RSA 125-C:11 and RSA 125-C:13, shall issue either:
(1) A letter of approval to the source with a
copy of the general permit(s) attached; or
(2) A letter of disapproval which specifically
identifies the reason(s) for disapproval.
(c)
If the department finds the registration package to be incomplete,
inaccurate, or unclear, within 15 days of receipt by the
department of the registration package filed by the source, the department
shall issue either:
(1) A letter requesting supplementary facts or
corrected information in accordance with (d), below; or
(2) A letter requesting clarification of the
information submitted in accordance with (e), below.
(d)
An owner or operator who has filed a registration package in accordance
with Env-A 610.08 and who fails to file any required information or who has
filed incorrect information for a general state permit shall, upon becoming
aware of or being notified by the department of such failure or incorrect
submittal, file with the department such supplementary facts or corrected
information in writing no later than 30 days after the discovery or
notification.
(e)
If the department requests clarification from the owner or operator of
the information filed in accordance with Env-A 610.08, the owner or operator
shall file the information in writing within 30 days of receipt of the request.
(f)
For a source that receives a letter pursuant to (c), above, within 75
days of the department’s
receipt
of the registration package filed by the source, the department, in accordance
with RSA 125-C:11 and RSA 125-C:13, shall issue either:
(1) A letter of approval to the source with a
copy of the general permit(s) attached; or
(2) A letter of disapproval which specifically
identifies the reason(s) for disapproval.
Source. #6782-B, eff 6-30-98; ss by #7879, eff
4-26-03; ss by #8129, eff 7-28-04; ss by #9791, eff 10-1-10; ss by #10175, eff
9-1-12; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 610.10 General State Permit Conditions. A general state permit shall contain
conditions as specified in Env-A 604.
Source. #6782-B, eff 6-30-98; ss by #7879, eff
4-26-03; ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000,
eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 610.11 Fees, Testing, Monitoring, Recordkeeping
and Reporting Requirements. A source
or device operating under a general state permit subject to this part, shall comply with the following, where applicable:
(a)
The fee requirements established in Env-A 700;
(b)
The testing and monitoring requirements specified in Env-A 800; and
(c)
The recordkeeping and reporting requirements specified
in Env-A 900.
Source. #6782-B, eff 6-30-98; ss by #7879, eff
4-26-03; ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000,
eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 610.12 List of Sources Covered by General State
Permits.
(a)
The department shall maintain and update a list of sources covered by
each general state permit established by the department.
(b)
The list shall include the following information:
(1) The name of the source;
(2) The location of the source;
(3) The issuance date of the letter of approval
for the general state permit; and
(4) The number of devices covered by the general
state permit(s) for each source category located at the source.
Source. #6782-B, eff 6-30-98; ss by #7879, eff
4-26-03; ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000,
eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 610.13 Expiration Date and General State Permit
Reestablishment Procedures.
(a)
Each general state permit shall be:
(1) Established for a period of 5 years; and
(2) Reestablished in accordance with the
procedures for the reestablishment of a general state permit specified in Env-A
620.
(b)
The department shall notify each owner or operator of the outcome of the
reestablishment process in writing.
(c)
If the general state permit is not reestablished, the owner or operator
of a source operating under an existing general state permit shall file an
application with the department for a state permit to operate pursuant to Env-A
608 within 90 days of being notified by the department that the general state
permit was not reestablished.
(d)
If the general state permit is reestablished, the owner or operator of a
source operating under an existing general state permit shall file a request
with the department for re-registration in accordance with Env-A 610.08, within
90 days after the department has reestablished the general state permit.
(e)
If a general state permit expires prior to the department reestablishing
the general state permit, the department shall:
(1) Extend the expiration date of the general
state permit for a period of not more than one year;
(2) Publish a public notice in a newspaper of
general daily statewide circulation stating the extension of the expiration
date of the general state permit; and
(3) Notify each owner or operator operating under
the general state permit regarding the extension of the general state permit.
Source. #6782-B, eff 6-30-98; ss by #7879, eff
4-26-03; ss by #9791, eff 10-1-10; ss by #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 610.14 Sources Choosing to Comply with the State
Permits to Operate Program. At any
time, an owner or operator of a stationary source, area source, or device
operating under a general state permit may choose to comply instead with a
state permit to operate by:
(a)
Filing an application in accordance with Env-A 608 or Env-A 612.03; and
(b)
Filing a written request with the department stating that the facility
chooses to be covered under the state permit to operate program.
Source. #6782-B, eff 6-30-98 (formerly Env-A 610.01);
ss by #7879, eff 4-26-03; ss by #9791, eff 10-1-10; ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
Env-A 610.15 General Permits Under Title V.
(a)
An owner, operator, or applicant may apply for coverage under a general
permit in lieu of a source-specific title V operating permit upon the adoption
of rules establishing criteria and procedures by which sources may qualify for
a general permit.
(b)
A general permit shall expire 5 years from the date of permit issuance, but may be renewed for additional 5-year periods.
(c)
A general permit shall contain conditions to ensure compliance with all
applicable requirements.
(d)
A general permit shall be issued only after the following conditions are
satisfied:
(1)
The EPA is provided the opportunity to object
to the issuance of a general permit in accordance with the provisions of
Env-A 609.13(b);
(2)
Each affected state is provided the opportunity
to comment on the issuance of a general permit, as provided for in Env-A
622.03; and
(3) The department has complied with all of the procedures and requirements that apply to initial
permit issuance for a title V operating permit.
(e)
A general permit shall be amended, revoked, or reopened and reissued by
the department in accordance with the provisions of this part.
(f)
General permits shall not be issued for affected units.
(g)
Pursuant to 40 CFR 70.6(d)(2), the department’s granting of a request
for authorization to operate under a general permit shall not be a final action
for purpose of judicial review.
Source. #6782-B, eff 6-30-98 (formerly Env-A 610.02);
ss by #7879, eff 4-26-03; ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11;
ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 610.16 Application Procedures For General Permits
Under Title V.
(a)
The owner or operator of a source qualifying for a general permit shall
file an application with the department for a general permit.
(b)
The application shall include:
(1) Complete
application forms as described in Env-A 1703 through Env-A 1708, as applicable,
and provided by the department;
(2) All information
specified in Env-A 1709, if applicable;
(3) All additional
information necessary to determine qualification for, and to ensure compliance
with, the general permit;
(4) Certification of right, title, and
interest and, if applicable, proof of good standing, as specified in Env-A
605.02;
(5) The fee(s) specified in Env-A 702 through
Env-A 705, as applicable; and
(6) Where air pollution dispersion modeling is
required for a source or device pursuant to Env-A 606.02, the information
required pursuant to Env-A 606.03.
Source. #7879, eff 4-26-03; ss by #9791, eff 10-1-10;
ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
PART
Env-A 611 GENERAL ACID RAIN PERMITTING
REQUIREMENTS
Env-A 611.01 Purpose. The purpose of this part is to specify the
permitting requirements for those stationary sources subject to title IV and
title V of the Act.
Source. #1710, eff 1-19-81; ss by #2332, eff 4-29-83;
ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss by #6057-B, eff
6-30-95; ss by #7879, eff 4-26-03; ss by #9906, INTERIM, eff 4-26-11, EXPIRES:
10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510,
eff 12-17-22
Env-A 611.02 Standard Acid Rain Permitting Requirements. Each owner or operator of an affected unit
shall comply with the applicable requirements of Env-A 406 and this part
regarding:
(a)
Permitting and monitoring of sulfur dioxide (SO2), NOx where
applicable, and excess emissions; and
(b)
Recordkeeping and reporting requirements, liability, and the effect on
other authorities.
Source. #120, eff 8-31-73; ss by #721.16 eff 12-7-75;
amd by #1375, eff 7-1-79; ss by #1615, eff 7-31-80; amd by #1710, eff 1-19-81; ss by #2332, eff 4-29-83; ss by
#2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss by #6057-B, eff 6-30-95; ss
by #7879, eff 4-26-03; ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss
by #10000, eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 611.03 Title V Operating Permit Interface.
(a)
Under the authority provided by RSA 125-D:3, the provisions of 40 CFR 72
and 40 CFR 76 shall apply for purposes of implementing an acid rain program
that meets the requirements of title IV of the Act.
(b)
Unless otherwise specified, an acid rain affected source shall comply
with the requirements of this part, except where the requirements of 40 CFR 72
and 40 CFR 76 conflict with or are not included in the title V operating permit
rules found in this part, in which case the 40 CFR 72 and 40 CFR 76
requirements shall apply and take precedence.
(c)
An acid rain affected unit shall comply with 40 CFR 72 and 40 CFR 76 for
permit issuance, amendment, revision, reopening, and renewal, including any
such requirements for application, public participation, review by affected
states, and review by EPA. Where 40 CFR
72 or 40 CFR 76 does not apply and unless otherwise specified, an acid rain
affected unit shall comply with the requirements of this part for
permit issuance,
revision, reopening, and renewal, including any such requirements for
application, public participation, and review by affected states and EPA.
Source. #5033, eff 12-27-90; ss by #6057-B, eff
6-30-95; ss by #6648, INTERIM, eff 12-5-97, EXPIRES: 4-4-98; ss by #6723, eff
3-28-98; ss by #7879, eff 4-26-03; ss by #9906, INTERIM, eff 4-26-11, EXPIRES:
10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510,
eff 12-17-22
Env-A 611.04 Enforceability of Acid Rain Permit
Application.
(a)
A complete acid rain permit application required pursuant to 40 CFR 72
and 40 CFR 76 shall be binding on:
(1)
The owner, operator, and designated representative
of an acid rain affected source;
(2)
All acid rain affected units at an acid rain affected source; and
(3)
Any other unit governed by the acid rain permit
application.
(b)
A complete acid rain permit application required pursuant to 40 CFR 72
and 40 CFR 76 shall be enforceable as the acid rain permit required pursuant to
40 CFR 72 and 40 CFR 76 and the acid rain portion of the title V operating
permit required pursuant to this chapter until the date of issuance, denial, or
renewal of said permits.
Source. #6057-B, eff 6-30-95; ss by #6648, INTERIM,
eff 12-5-97, EXPIRES: 4-4-98; ss by #6723, eff 3-28-98; ss by #7879, eff
4-26-03; ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000,
eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 611.05 Acid Rain Compliance Plan. The acid rain compliance plan shall include
documentation that the acid rain affected source will meet the applicable acid
rain emissions limitations and acid rain emissions reduction requirements
pursuant to sections 405, 406, and 407 of the Act.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03 (formerly Env-A 611.06); ss by #9906, INTERIM, eff 4-26-11, EXPIRES:
10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510,
eff 12-17-22
Env-A 611.06 EPA Review. The department shall submit to EPA a copy of
the proposed acid rain portion of the title V operating permit and all other
relevant portions of the proposed title V operating
permit that might affect the proposed acid rain portion of the title V
operating permit.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03 (formerly Env-A 611.07); ss by #9906, INTERIM, eff 4-26-11, EXPIRES:
10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510,
eff 12-17-22
Env-A 611.07 Acid Rain Permit Conditions.
(a)
Allowances lawfully held or acquired by an affected unit under the acid
rain provisions of the Act, including the applicable sections of 40 CFR 72 and
40 CFR 76, shall be governed by the following:
(1)
Emissions from the affected units shall not exceed any allowances held
by the affected unit;
(2)
There shall be no limit placed on the number of allowances held by the
affected unit;
(3)
Allowances shall not be used by an affected unit or acid rain source to
avoid compliance with any other applicable requirement of either state or
federal rules or provision of the Act; and
(4) Any such allowances shall be accounted for
according to the procedures established in the applicable provisions of 40 CFR
72, 40 CFR 73, and 40 CFR 76.
(b)
Combined SO2 emissions from affected units located at Class A
and Class B major sources in New Hampshire shall not exceed the limits
specified in Env-A 405.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03 (formerly Env-A 611.08); ss by #9906, INTERIM, eff 4-26-11, EXPIRES:
10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510,
eff 12-17-22
Env-A 611.08 Acid Rain Permit Issuance. The department shall review applications for
acid rain permits and, provided all applicable criteria have been met, issue
the acid rain permit required pursuant to 40 CFR 72 and 40 CFR 76.
Source. #6057-B, eff 6-30-95; ss by #6648, INTERIM,
eff 12-5-97, EXPIRES: 4-4-98; ss by #6723, eff 3-28-98; ss by #7879, eff
4-26-03 (formerly Env-A 611.09); ss by #9906, INTERIM, eff 4-26-11, EXPIRES:
10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510,
eff 12-17-22
Env-A 611.09 Effect of Permit Shield. No applicable requirement of the acid rain
permit program shall be altered or affected by the permit shield provisions of
Env-A 609.09, or any provision in a title V operating permit. However, each affected unit operated in
accordance with its title V operating permit which was issued in compliance
with section 408 of the Act and the provisions of this part shall be deemed to
be operating in compliance with the acid rain permit program, except as
provided in 40 CFR §72.9(g)(6).
Source. #6057-B, eff 6-30-95; ss by #6648, INTERIM,
eff 12-5-97, EXPIRES: 4-4-98; ss by #6723, eff 3-28-98; ss by #7879, eff
4-26-03 (formerly Env-A 611.10); ss by #9906, INTERIM, eff 4-26-11, EXPIRES:
10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510,
eff 12-17-22
Env-A 611.10 Acid Rain Permit Revisions and Limitations.
(a)
Where the provisions of this part are inconsistent with other parts of
this chapter, the provisions of this part shall take precedence with regard to an amendment to the acid rain portion of any
title V operating permit.
(b)
No amendment, reopening, or modification to the acid rain portion of a
title V operating permit shall be required for increases in emissions that are
authorized by allowances acquired pursuant to the acid rain program, provided
that such increases do not require a permit amendment under any other
applicable requirement.
(c) Pursuant to the applicable
provisions of 40 CFR §72 Subpart H, no amendment to the
acid rain portion of a title V operating permit shall:
(1) Affect the expiration date of the acid rain
portion of a title V operating permit being amended;
(2) Excuse any violation of an acid rain
requirement that occurred prior to the effective date of the permit amendment
while the applicable requirement was in effect; or
(3) Modify or void any
of the requirements contained in this part.
(d)
The existing terms of the title V operating permit shall apply while any
amendment to the acid rain portion of the permit is pending.
Source. #6057-B, eff 6-30-95; ss by #6648, INTERIM,
eff 12-5-97, EXPIRES: 4-4-98; ss by #6723, eff 3-28-98; ss by #7879, eff
4-26-03 (formerly Env-A 611.11); ss by #9906, INTERIM, eff 4-26-11, EXPIRES:
10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510,
eff 12-17-22
Env-A 611.11 Permit Amendment Procedures. Permit amendment procedures for affected
sources shall be as specified in Env-A 612.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03 (formerly Env-A 611.12); ss by #9906, INTERIM, eff 4-26-11, EXPIRES:
10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510,
eff 12-17-22
Env-A 611.12 Permit Reopening Procedures. Permit reopening procedures for NOx shall be
as specified in Env-A 609.19.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03 (formerly Env-A 611.13); ss by #9906, INTERIM, eff 4-26-11, EXPIRES:
10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510,
eff 12-17-22
Env-A 611.13 Acid Rain Appeals Procedures.
(a)
An appeal of the acid rain portion of a title V operating permit that
does not challenge or involve decisions or actions of the EPA under the acid
rain provisions of the Act or 40 CFR §72 and 40 CFR §76 shall be filed
pursuant to Ec-Air 203.
(b)
An appeal of the acid rain portion of a title V operating permit that
challenges or involves decisions or actions of the EPA shall follow the
procedures of 40 CFR §78 and section 307 of the Act.
(c)
As specified in 40 CFR §72.72(b)(5)(i),
decisions or actions involving the EPA shall include, but not be limited to:
(1)
Allowance allocations;
(2)
Determinations concerning alternative monitoring systems; and
(3) Determinations of whether a technology is a
qualifying repowering technology.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03 (formerly Env-A 611.14); ss by #9906, INTERIM, eff 4-26-11, EXPIRES:
10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510,
eff 12-17-22
PART
Env-A 612 PERMIT AMENDMENTS,
MODIFICATIONS, AND REVISIONS
Env-A 612.01 Administrative Permit Amendments.
(a)
The owner or operator may implement the changes addressed in the request
for an administrative amendment immediately upon filing the request with the
department.
(b)
The department shall take final action on a request for an
administrative amendment within 60 days of receipt by the
department of a request filed pursuant to (a), above, and shall, in the case of
title V operating permits, submit a copy of the
revised permit to
EPA.
(c)
Notice to the public or affected states of the changes incorporated into
the permit shall not be required, provided that the department designates any
such permit revisions as having been made pursuant to this section.
Source. #1710, eff 1-19-81; ss by #1864, eff
11-16-81; ss by #2332, eff 4-29-83; ss by #2938, eff 12-27-84; ss by #5033, eff
12-27-90; ss by #6057-B, eff 6-30-95; ss by #7879, eff 4-26-03; ss by #9791,
eff 10-1-10; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 612.02 Operational Flexibility for Title V
Operating Permits: Emissions Trading, Off-Permit Changes, and Section
502(b)(10) Changes.
(a)
For the purposes of this section, the term “section 502(b)(10) changes”
means “section 502(b)(10) changes” as defined in 40 CFR §70.2, namely “changes
that contravene an express permit term.
Such changes do not include changes that would violate applicable
requirements or contravene federally enforceable permit terms and conditions
that are monitoring (including test methods), recordkeeping, reporting, or
compliance certification requirements.”
(b)
The owner or operator of a stationary source or area source subject to
and operating under an existing title V operating permit may make changes as
authorized under (c), (d), or (e) of this section at the permitted stationary
source or area source without filing an application for and obtaining an
amended title V operating permit, provided that all of the following general
conditions, and the specific conditions in (c), (d), or (e) below, as
applicable, are met:
(1) The change is not a modification under any
provision of title I of the Act;
(2) The change does not cause emissions to exceed
the emissions allowable under the title V operating
permit, whether expressed therein as a rate of emissions or in terms of total
emissions;
(3) The owner or operator has obtained any
temporary permit required by Env-A 600;
(4) The owner or operator has provided written
notification to the department and administrator of the proposed change and
such written notification includes:
a. The date on which each proposed change will
occur, or has occurred, as specified under (c), (d), or (e) of this section;
b. A description of each such change;
c. Any change in emissions that will result;
d. A
request that the operational flexibility procedures be used; and
e. The signature of the responsible
official, consistent with Env-A 605.04(d); and
(5) The owner or operator has attached the notice
required pursuant to (b)(4) above to its copy of the current title V operating
permit.
(c)
Changes involving the trading of emissions under an existing title V
operating permit may be made without filing an application for and obtaining an
amended title V operating permit, provided that all of
the following specific conditions are met:
(1) The title V operating permit issued to the
stationary source or area source already contains terms and conditions,
including all terms and conditions which determine compliance required under 40
CFR §70.6(a) and (c), and which allow for the trading of emissions increases
and decreases at the permitted stationary source or area source solely for the
purpose of complying with a federally-enforceable emissions cap that is
established in the permit independent of otherwise applicable requirements;
(2) The owner or operator has included in the
application for the title V operating permit proposed
replicable procedures and proposed permit terms which ensure that the emissions
trades are quantifiable and federally enforceable for changes at the permitted
facility which qualify under a federally-enforceable emissions cap that is
established in the title V operating permit independent of the otherwise
applicable requirements;
(3) The department has not included in the
emissions trading provision any devices for which emissions are not
quantifiable or for which there are no replicable procedures to enforce
emissions trades; and
(4) The written notification required in (b)(4)
above:
a. Is made at least 7 days prior to the proposed
change; and
b. Includes a statement as to how any change in
emissions will comply with the terms and conditions of
the permit.
(d)
The owner or operator of a stationary source or area source subject to
and operating under an existing title V operating permit may make changes not
addressed or prohibited by the existing title V operating permit at a permitted
stationary source or area source without filing an application for and
obtaining an amended title V operating permit, provided that all of the
following specific conditions are met:
(1) Each off-permit change meets all applicable
requirements and does not violate any existing permit term or condition;
(2) The owner or operator provides
contemporaneous written notification to the department and the administrator of
each off-permit change, except for changes that qualify as insignificant under
the provisions of Env-A 609.04;
(3) The change is not subject to any requirements
under title IV of the Act and the change is not a
title I modification;
(4) The owner or operator keeps a record
describing the changes made at the source which result in emissions of a
regulated air pollutant subject to an applicable requirement, but not otherwise
regulated under the permit, and the emissions resulting from those changes; and
(5) The written notification to the department
and administrator required in (b)(4) above includes:
a. A list of the pollutants emitted; and
b. Any applicable requirement that would apply as a result of the change.
(e)
The owner or operator of a stationary source or area source subject to
and operating under an existing title V operating
permit may make changes pursuant to section 502(b)(10) of the Act without
filing an application for and obtaining an amended title V operating permit,
provided that the written notification required in (b)(4) above:
(1) Is made at least 7 days prior to the proposed
change; and
(2) Includes any permit term or condition that is
no longer applicable as a result of the change.
(f)
The changes authorized in (d) and (e) above shall not qualify for the
permit shield under Env-A 609.09.
(g)
The department and the administrator shall attach each notice required
pursuant to (b)(4), above, to their copy of the relevant title V operating
permit.
Source. #1710, eff 1-19-81; ss by #1864, eff
11-16-81; ss by #2332, eff 4-29-83; ss by #2938, eff 12-27-84; ss by #5033, eff
12-27-90; ss by #6057-B, eff 6-30-95; ss by #7483, eff 4-26-01; ss by #7879,
eff 4-26-03; ss by #9706, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by
#10000, eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 612.03 Minor Permit Amendments: Temporary Permits
and State Permits to Operate.
(a)
The owner or operator of a source or device shall file with the
department a request for a minor permit amendment for any proposed change to an
existing permit condition which:
(1) Does not qualify as either an administrative
permit amendment, as defined in Env-A 102, or a significant permit
amendment, as specified in Env-A 612.04; or
(2) Incorporates the
requirements of a temporary permit, general state permit, or RACT order into an
existing state permit to operate.
(b)
The request for a minor permit amendment shall:
(1) Be in the form of a letter to the department;
(2) Describe the proposed change; and
(3) Describe any new requirements that will apply
if the change occurs.
(c)
The department shall take final action on a request for a minor permit
amendment within 90 days of receipt of a request
filed pursuant to (a) and (b), above.
(d)
The owner or operator may implement the proposed change immediately upon
filing a request for minor permit amendment with the department,
but shall be subject to enforcement if the department later determines
that the change violated any applicable state or federal requirement.
Source. #1710, eff 1-19-81; ss by #1864, eff
11-16-81; ss by #2332, eff 4-29-83; ss by #2938, eff 12-27-84; ss by #5033, eff
12-27-90; ss by #6057-B, eff 6-30-95; amd by #6342-B,
eff 9-28-96; ss by #7879, eff 4-26-03; ss by #9791, eff 10-1-10; ss by #10175,
eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 612.04 Significant Permit Amendments: Temporary
Permits and State Permits to Operate.
(a)
The owner or operator shall file an application with the department for
a significant permit amendment of a temporary permit or state permit to
operate, as applicable, for the following:
(1) Any proposed change to an existing process or
device that results in the following:
a. Any increase in allowable hourly or annual
emissions of nitrogen oxides, sulfur dioxide, VOCs, HAPs, or PM10; or
b. Any increase in potential emissions equal to
or greater than 5 pounds per hour of carbon monoxide;
(2) Any proposed change to operating or emission
limitations in the temporary permit or state permit to operate;
(3) Any proposed change in the type of pollution
control equipment specified in the existing permit; or
(4) Any proposed change that results in an
increase in previously-allowed loading of existing pollution control equipment
by greater than 50%.
(b)
A request for a significant permit amendment shall include the
following:
(1) A complete application form, as described in
Env-A 1703 through Env-A 1708, as applicable and provided by the department,
containing all pertinent information with regard to
the amendment including, if applicable, the information specified in Env-A
1709;
(2) The fee(s) specified in Env-A 702 through
Env-A 705, as applicable;
(3) A description of:
a. The proposed change;
b. The emissions resulting from the change; and
c. Any new requirements that will apply if the
change occurs;
(4) If an air pollution dispersion modeling
impact analysis is required pursuant to Env-A 606.02, documentation required
pursuant to Env-A 606.04;
(5) For a source with air pollution control
equipment, as defined in Env-A 102, an air pollution control equipment
monitoring plan or catalyst management plan pursuant to Env-A
810.01; and
(6) If a plan is not required pursuant to Env-A 810.01, a description of the monitoring the source intends
to conduct to demonstrate compliance with all applicable state and federal
statutes, rules, and permits, as specified in Env-A
810.02.
(c)
The department shall take final action on a request for a significant
permit amendment within 90 days of receipt by the
department of a request filed pursuant to (a) and (b), above, provided that the
public notice and hearing procedures specified in Env-A 621 have been
satisfied.
(d)
The owner or operator shall not implement the proposed change unless and
until the department issues the amended permit.
Source. #1710, eff 1-19-81; ss by #1864, eff
11-16-81; ss by #2332, eff 4-29-83; ss by #2938, eff 12-27-84; ss by #5033, eff
12-27-90; ss by #6057-B, eff 6-30-95; amd by #6342-B,
eff 9-28-96; ss by #7879, eff 4-26-03 (formerly Env-A 612.03); ss by #9791, eff
10-1-10; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 612.05 Minor Modifications: Title V Operating
Permits.
(a)
Prior to implementing a minor title V operating permit modification, the
owner or operator shall file a written request to the department for a minor
permit modification for those changes that qualify as minor permit
modifications under this section.
(b)
For a source or device that has been issued a temporary permit, an
application for a minor permit modification shall be considered timely if it is
filed with the department at least 90 days prior to the designated expiration
date of the temporary permit.
(c)
An application for a minor modification to a title V operating permit
shall be deemed complete within 60 days after its filing, unless the department
requests additional information or otherwise notifies the applicant of
incompleteness.
(d)
The request for a minor permit modification shall include the following:
(1) An application form, provided by the
department as described in Env-A 1703 through Env-A 1708, as applicable,
containing all information pertinent to the modification, including, if
applicable, the information specified in Env-A 1709;
(2) The fee(s) specified in Env-A 702 through
Env-A 705, as applicable; and
(3) A description of:
a. The change;
b. The emissions resulting from the change; and
c. Any new requirements that will apply if the
change occurs;
(4) Where air pollution dispersion modeling is
required for a source or device pursuant to Env-A 606.02, the information
required pursuant to Env-A 606.04;
(5) The owner or operator's proposed draft permit
conditions;
(6) Certification by a responsible official,
consistent with the provisions of Env-A 605.04(d), that the proposed change
meets the criteria for the use of the minor permit modification procedures; and
(7) A request that minor permit modification
procedures be used.
(e) Within 5 working days of the receipt
by the department of a request filed pursuant to (a)-(c), above, for a minor
permit modification to a title V operating permit, the department shall notify
EPA and any affected state(s) of the request.
(f)
The department shall not make a final decision on a
requested permit modification to a title V operating permit until after
EPA’s 45-day review period or until EPA has notified the department that EPA
will not object to the permit modification, whichever comes first.
(g) By the later of 90 days from receiving
an application filed pursuant to (a) - (c), above, or 15 days after the end of
EPA's 45-day review period, the department shall:
(1) Issue the requested permit modification if it
meets the requirements of this section;
(2) Deny the requested permit modification if it
does not meet the requirements of the section;
(3) Determine that the requested modification
does not qualify as a minor permit modification and review the request under
the significant permit modification procedures in Env-A 612.06; or
(4) Revise the draft permit to the extent that it
does not meet the requirements of this section and send to EPA and to the
applicant the new proposed permit modification.
(h)
The owner or operator may implement the proposed change immediately upon
filing a request for minor permit modification with the department.
(i) Pending final action on the permit
modification by the department, the owner or operator shall comply with both
the applicable requirements governing the change and the proposed permit
conditions.
(j)
The permit shield specified in Env-A 609.09, shall not apply to minor
permit modifications.
Source. #1710, eff 1-19-81; ss by #1864, eff
11-16-81; ss by #2332, eff 4-29-83; ss by #2938, eff 12-27-84; ss by #5033, eff
12-27-90; ss by #6057-B, eff 6-30-95; amd by #6342-B,
eff 9-28-96; ss by #7879, eff 4-26-03 (formerly Env-A 612.04); ss by #9791, eff
10-1-10; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 612.06 Significant Permit Modifications: Title V
Operating Permits.
(a)
A change at a source subject to title V shall qualify as a significant
permit modification if the change:
(1) Is a title I modification;
(2) Does not qualify as an
administrative amendment or minor permit modification;
(3) Is a removal or a relaxation
of existing monitoring terms or conditions, or a substitution in those terms or
conditions promulgated pursuant to:
a. NSPS;
b. NESHAP; or
c. Env-A 808;
(4) Is a removal or relaxation of
recordkeeping or reporting terms or conditions, or a substitution in a
recordkeeping or reporting requirement promulgated pursuant to:
a. NSPS;
b. NESHAP;
c. Env-A 800;
d. Env-A 900; or
e. Env-A 1211 as in
effect prior to October 21, 2010 or successor rule in
Env-A 1300; or
(5) Seeks to establish or change permit terms or
conditions, for which there is no corresponding underlying applicable requirement, that
the source has assumed to avoid an applicable requirement to which it would
otherwise be subject.
(b)
The terms and conditions referred to in (a)(5), above shall include:
(1) A federally enforceable emissions cap assumed
to avoid classification as a modification under any provision of title I; and
(2) An alternative emissions limit approved
pursuant to regulations promulgated under section 112(i)(5)
of the Act.
(c)
Prior to implementing a significant permit modification, the owner or
operator shall file a written request with the department for a significant
permit modification which includes the following:
(1) An application form, provided by the
department as described in Env-A 1703 through Env-A 1708, as applicable,
containing all information pertinent to the modification, including, if
applicable, the supplemental information specified in Env-A 1709;
(2) A description of:
a. The change;
b. The emissions resulting from the change; and
c. Any new applicable requirements that will
apply if the change occurs;
(3) The owner or
operator’s suggested draft permit conditions;
(4) Certification
by a responsible official, consistent with the provisions of Env-A 605.04(d),
that the proposed change meets the criteria for the use of the significant
permit modification procedures;
(5) A request that
significant permit modification procedures be used;
(6) Air pollution dispersion modeling impact
analysis documentation in accordance with Env-A 606.04, as
applicable; and
(7) The fee(s)
specified in Env-A 702 through Env-A 705, as applicable.
(d)
Upon filing a request for significant modification with the department,
the applicant shall forward a copy of the request, including those items listed
in (c)(1) through (c)(4), above, to EPA.
(e)
An application for a significant modification to a title V operating
permit shall be deemed complete by the department within 60 days of its filing,
unless the department requests additional information or otherwise notifies the
applicant of incompleteness.
(f)
The department shall take final action on a request for significant
permit modification no later than 9 months after the filing of
a complete application provided that:
(1) The procedures for public participation
specified in Env-A 622 have been satisfied;
(2) The requirements for notifying and responding
to affected states specified in Env-A 622.03 have been satisfied;
(3) The conditions of the permit provide for
compliance with all applicable requirements of title V of the Act and all
applicable requirements of Env-A 100 et seq.; and
(4) The EPA has received a copy of the proposed
permit and any notices required and has not objected to issuance of the
significant permit modification within the time period
specified in Env-A 609.13(b).
(g)
The owner or operator shall obtain an amended title V operating permit
incorporating the significant permit modification prior to implementing such
modification, except as provided in Env-A 609.07(a)(3).
Source. #7879, eff 4-26-03 (formerly Env-A 612.05); amd by #8129, eff 7-28-04; amd by
#9791, eff 10-1-10; amd by #9906, INTERIM, eff
4-26-11, EXPIRES: 10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
Env-A 612.07 Department Proposal to Amend a Permit.
(a)
The department shall propose to amend an existing non-title V permit if
any of the following circumstances exist:
(1) A requirement, adopted after the date of
issuance of the permit, becomes applicable to the source and can only be
enforced if incorporated into the permit;
(2) The permit contains a material inaccurate
statement or other material error;
(3) A material fact or statement relied upon by
the department when issuing the permit was not representative of actual
conditions; or
(4) A permit condition needs
to be revised, added or deleted to ensure compliance with any applicable regulation.
(b)
The department shall provide written notice to the owner or operator of
the intent to amend the permit at least 30 days prior to the date that the
permit is to be amended.
(c)
The written notice to the owner or operator shall contain the following
information:
(1) The specific permit which the department
proposes to amend;
(2) A brief description of the nature of the
proposed amendment;
(3) The name and telephone number of the
department staff person who may be contacted for further information; and
(4) A statement that the owner or operator shall,
within 30 days, respond to the notice of proposed amendment by:
a. Consenting to the proposed amendment;
b. Filing an objection to the proposed
amendment; or
c. Requesting a meeting with the department
regarding the proposed amendment.
(d) If the owner or operator consents to
the proposed amendment or fails to file a timely objection or request for a
meeting, the department shall follow the procedures for an administrative
permit amendment, minor permit amendment, or significant permit amendment, as
specified in Env-A 621 and as appropriate for the proposed amendment.
(e)
If, after a meeting held pursuant to (c)(4)c., above, the owner or
operator consents to the amendment as originally proposed or as modified at
such meeting, the department shall follow the procedures for an administrative
permit amendment, minor permit amendment, or significant permit amendment, as
specified in Env-A 621 and as appropriate for the proposed amendment.
(f) If the owner or operator files an
objection or, after a meeting held pursuant to (c)(4)c., above, objects to the
proposed amendment, the department shall either:
(1) Not amend the permit and notify the owner or
operator if the source might be in violation of the permit or applicable
regulation; or
(2) If the department believes the amendment is
necessary to ensure compliance, commence an adjudicative proceeding in
accordance with the provisions of RSA 541-A and Env-C 200 that apply to such
proceedings.
(g)
Only those provisions of a permit for which cause to amend exists shall be affected by proceedings under this section.
Source.
#10175, eff 9-1-12; ss by #13510, eff
12-17-22
PART
Env-A 613 CRITERIA FOR DENIAL,
SUSPENSION AND REVOCATION OF TEMPORARY PERMITS AND STATE PERMITS TO OPERATE
Env-A 613.01 Procedures. The procedures concerning denial, suspension,
and revocation of temporary permits and state permits to operate shall be as
specified in Env-A 623.
Source. #1710, eff 1-19-81; ss by #2332, eff 4-29-83;
ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss and moved by #6057-B,
eff 6-30-95 (from Env-A 607.02); ss by #7879, eff 4-26-03 (formerly Env-A
615.01); ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000,
eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 613.02 Denial of Permit Issuance. The department shall deny the issuance of a
temporary permit or state permit to operate if, on the basis
of available evidence, a determination is made that:
(a)
The use of the device for which the temporary permit or state permit to
operate is sought shall result in a violation of any provision of Env-A 100 et
seq.;
(b)
The use of the device shall contribute disproportionately to pollution
of the air in comparison with other similar devices able to perform the same
function; or
(c)
The device is located in an area where air quality levels have attained
the NAAQS and air pollution dispersion modeling impact analysis indicates that
the device will cause significant deterioration of the existing air quality as
defined in 40 CFR §51.165(b)(2), or 40 CFR §51.166(b)(23)(iii), in some or all
of the attainment area, as determined pursuant to 40 CFR §51, Appendix W.
Source. #6057-B, eff 6-30-95 (from Env-A 607.01); ss
by #7879, eff 4-26-03 (formerly Env-A 615.02); ss by #10000, eff 10-1-11; ss by
#10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 613.03 Permit Suspension or Revocation of a
Temporary Permit or State Permit to Operate. As specified in RSA 125-C:13, the following
shall constitute good cause for the department to suspend or revoke any permit
issued pursuant to this chapter:
(a)
That the permit holder has committed a violation of RSA 125-C or any
rule, order or permit condition in force and applicable to it; or
(b)
That emissions from the device to which the permit applies, alone or in
conjunction with other sources of the same pollutants, present an immediate
danger to the public health.
Source. #6057-B, eff 6-30-95 (from Env-A 607.03); ss
by #7879, eff 4-26-03 (formerly Env-A 615.03); ss by #9906, INTERIM, eff
4-26-11, EXPIRES: 10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
Env-A 613.04 False Statements. The department shall revoke any permit if,
following opportunity for a hearing in accordance with RSA 541-A:30, II, a
finding is made that the permit was issued in whole or in part based upon any
information proven to be materially false or misleading.
Source. #6057-B, eff 6-30-95 (from Env-A 607.04); ss
by #7879, eff 4-26-03 (formerly Env-A 615.04); ss by #9906, INTERIM, eff
4-26-11, EXPIRES: 10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
PART
Env-A 614 CITIZEN PETITIONS TO THE EPA
Env-A 614.01 Citizen Petitions to EPA.
(a)
If EPA does not object in writing pursuant to 40 CFR §70.8(c), any
person, including the applicant, owner, or operator, may petition the
administrator pursuant to 40 CFR §70.8(d) within 60 days after the
administrator's 45-day review period to make such an objection.
(b)
As required by 40 CFR §70, the petitioner shall provide a copy of the
petition to the department and to the applicant.
(c)
The petition shall identify all objections and be based only on
objections to the permit that were raised with reasonable specificity during
the public comment period provided for in Env-A 622.02, unless:
(1) The petitioner demonstrates in the petition
to the EPA that it was impracticable to raise such objections
within the public comment period; or
(2) The grounds for
such objection arose after the close of the public comment period.
(d) If EPA objects to the title V
operating permit as a result of a citizen petition:
(1) Prior to the
issuance of the permit, the department shall not issue the title V operating
permit until EPA's
objection has been resolved; or
(2) After the issuance of
a permit, the department shall, within 90 days from the receipt of the EPA's
objection, resolve the objection and terminate, modify, or revoke and reissue
the permit.
(e)
A citizen petition shall not stay the effectiveness of a permit or its
requirements if the permit was issued after the end of the 45-day review period
and prior to an EPA objection.
(f)
If the department fails to resolve the objection, EPA may modify,
terminate, or revoke the title V operating permit as required by 40 CFR
§70.7(g), and the department shall thereafter issue only a revised permit that
satisfies EPA's objection.
(g)
An application that has been deemed timely pursuant to Env-A 609.07 and
complete pursuant to Env-A 609.11 shall remain timely and complete even though
EPA objects to the resulting title V operating permit or any person files a
citizen petition.
Source. #1710, eff 1-19-81; ss by #1864, eff
11-16-81; ss by #2332, eff 4-29-83; ss by #2938, eff 12-27-84; ss by #5033, eff
12-27-90; ss by #6057-B, eff 6-30-95; ss by #7879, eff 4-26-03 (formerly Env-A
618.01); ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000,
eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
PART
Env-A 615 INTERSTATE AIR QUALITY IMPACTS
Env-A 615.01 Special Emission Limitations. The department shall apply special emission
limits to a stationary source to ensure that its air quality impacts on
adjacent states shall not interfere with the measures taken in those states to
prevent significant deterioration of air quality and shall not prevent the
attainment or maintenance of the NAAQS in those states. Significant deterioration shall be determined
using the procedures found in 40 CFR 51, Appendix W.
Source. #1375, eff 7-1-79; ss by #1717, eff 2-19-81;
ss by #2332, eff 4-29-83; ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90;
ss and moved by #6057-B, eff 6-30-95 (from Env-A 614.01); ss by #7879, eff
4-26-03 (formerly Env-A 619.01); ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11;
ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
PART
Env-A 616 DETERMINATION OF ACTUAL
EMISSIONS
Env-A 616.01 Determination of Actual Emissions. The owner or operator of a stationary source,
area source, or device shall determine the actual annual
emissions from the source or device as specified in Env-A 705.02.
Source. #1717, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss and moved by #6057-B,
eff 6-30-95 (from Env-A 615.01); ss by #7879, eff 4-26-03 (formerly Env-A
620.01); ss by #9791, eff 10-1-10; ss by #10175, eff 9-1-12; ss by #13510, eff
12-17-22
PART
Env-A 617 RESEARCH AND DEVELOPMENT
OPERATIONS
Env-A 617.01 Exception to Obtaining a Temporary Permit
or State Permit to Operate.
Notwithstanding the provisions of Env-A 603.01(a) or (b), a temporary
permit or a state permit to operate shall not be required for any research and
development operation provided that all of the
following conditions are met:
(a)
The owner of an existing stationary source, area source, or device files
a written request with the department to treat the stationary source, area
source, or device as a research and development operation, and receives a
written determination from the department that the stationary source, area
source, or device meets the definition of a research and development operation
according to the requirements found in (c) through (e), below;
(b) The owner of a new stationary source, area
source, or device filed a written request with the department prior to the
construction, installation, or operation of the stationary source, area source,
or device to treat the stationary source, area source, or device as a research
and development operation, and has received a written determination from the
department that the stationary source, area source, or device meets the
definition of a research and development operation according to the
requirements found in (c) through (e), below;
(c)
The request to treat a stationary source, area source, or device as a
research and development operation contains all of the
following information:
(1) A brief narrative description of the research
and development operation and the stationary source(s), area
source(s), or device(s) involved;
(2) The date on which the
research and development operation commenced or will commence operation;
(3) An estimate of the total number of days that
the stationary source, area source, or device has been and will be used as a
research and development operation;
(4) An estimate of the amount
of emissions of each regulated pollutant and each toxic air pollutant to be
emitted by the research and development operation in pounds per hour, pounds
per day, and pounds per year; and
(5) The name and title of the person at the
facility directly responsible for supervising each research and development
operation;
(d)
A written operating log is maintained at the stationary source, area
source, or device; and
(e)
The written operating log describes each research and development
operation by providing the following information:
(1) A brief narrative description of the research
and development operation and the stationary sources, area sources, or devices
involved;
(2) The date on which the research and
development operation commenced or will commence operation;
(3) The total number of days that an existing
stationary source, area source, or device has been used as a research and
development operation;
(4) When finished, the date on which the research
and development operation ended;
(5) The amount of actual
emissions of each regulated pollutant and each toxic air pollutant emitted by
the research and development operation in pounds per hour, pounds per day, and
pounds per year; and
(6) The name and title of the person at the
facility directly responsible for supervising the research and development
operation.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03 (formerly Env-A 621.01); amd by #9791, eff
10-1-10; amd by #9906, INTERIM, eff 4-26-11, EXPIRES:
10-24-11; ss by #9791, eff 10-1-10; ss by #10000, eff 10-1-11; ss by #10175,
eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 617.02 Exception to Obtaining a Title V Operating
Permit. Notwithstanding Env-A
603.01(a) or (b), a title V operating permit shall not
be required for any research and development operation provided
that all of the following conditions are met:
(a)
The owner of an existing stationary source, area source, or device files
a written request with the department to treat the stationary source, area
source, or device as a research and development operation and receives a
written determination from the department that the stationary source, area
source, or device meets the definition of a research and development operation
according to the requirements found in (c) through (q), below;
(b)
The owner of a new stationary source, area source, or device files a
written request with the department prior to the construction, installation, or
operation of the stationary source, area source, or device to treat the
stationary source, area source, or device as a research and development
operation and receives a written determination from the department that the
stationary source, area source, or device meets the definition of a research
and development operation according to the requirements found in (c) through
(q), below;
(c)
The request to treat a stationary source, area source, or device as a
research and development operation contains all of the
following information:
(1) A brief narrative description of the research
and development operation and the stationary source(s), area source(s), or
device(s) involved;
(2) The date on which the research and
development operation commenced or will commence;
(3) An estimate of the total number of days that
the stationary source, area source, or device will be used as a research and
development operation;
(4) An estimate of the amount of emissions of
each regulated pollutant and each toxic air pollutant to be emitted by the
research and development operation in pound per hour, pounds per day, and
pounds per year; and
(5) The name and title of the person at the
facility directly responsible for supervising each research and development
operation;
(d)
A written operating log is maintained at the stationary source, area
source, or device;
(e)
The written operating log describes each research and development
operation by providing the following information:
(1) A brief narrative description of the research
and development operation and the stationary source(s), area source(s), or
device(s) involved;
(2) The date on which the research and
development operation commenced;
(3) The total number of days that a stationary
source, area source, or device was used as a research and development
operation;
(4) The date on which the research and
development operation ended;
(5) The amount of actual
emissions of each regulated pollutant and each toxic air pollutant emitted by
the research and development operation in pounds per hour, pounds per day, and
pounds per year; and
(6) The name and title of the person at the
facility directly responsible for supervising the research and development
operation;
(f)
In moderate, serious, or severe ozone nonattainment areas, the total VOC
emissions from the research and development operation are less than or equal to
3 pounds per hour, 15 pounds per day, and 1,000 pounds per year;
(g)
In any area of the state, the total emissions of all hazardous air
pollutants from the research and development operation are less than or equal
to 3 pounds per hour and the individual emissions of any hazardous air
pollutant from the research and development operation is equal to or less than
15 pounds per day and equal to or less than 1,000 pounds per year;
(h)
In any area of the state, the total emissions of all toxic air
pollutants from the research and development operation are less than or equal
to 3 pounds per hour, and the individual emission of any toxic air pollutant
from the research and development operation is equal to or less than 15 pounds
per day and equal to or less than 1,000 pounds per year;
(i) The research and development operation is not
otherwise required to hold a title V operating permit by a NESHAP contained in
40 CFR 61;
(j)
The research and development operation is not otherwise required to hold
a title V operating permit by a MACT standard for source categories contained
in 40 CFR 63;
(k)
The research and development operation is not subject to the NSPS
contained in 40 CFR 60;
(l)
The research and development operation is not subject to the rules
governing PSD contained in Env-A 619;
(m)
The research and development operation is not subject to the rules
governing nonattainment areas as contained in Env-A 618;
(n)
The department has not made a determination in
accordance with 40 CFR 51, Appendix W, that the emissions from the research and
development operation have a significant impact on air quality and that a title
V operating permit is required to ensure that ambient air quality standards are
achieved and maintained;
(o)
The research and development operation is not subject to any applicable
requirement;
(p)
The research and development operation is included as an insignificant
activity in any application for a title V operating permit; and
(q)
The emissions from any research and development operation are included
in determining the applicability of a title V operating permit to any
stationary source or area source.
Source. #7879, eff 4-26-03 (formerly Env-A 621.02); amd by #9791, eff 10-1-10; amd by
#9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000, eff 10-1-11; ss
by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
PART
Env-A 618 NONATTAINMENT NEW SOURCE
REVIEW
Env-A 618.01 Purpose. The purpose of this part is to implement the
nonattainment new source review (NSR) program as set forth in 171 through 193
of the Clean Air Act (Act) and the July 1, 2016
edition of 40 CFR §51.165.
Source. #6057-B, eff 6-30-95; ss by #7879, eff
4-26-03 (formerly Env-A 622.02); ss by #9906, INTERIM, eff 4-26-11, EXPIRES:
10-24-11; ss by #10000, eff 10-1-11; ss by #10175,
eff 9-1-12; ss by #12011, eff 10-22-16; ss by #13510, eff 12-17-22
Env-A 618.02 Applicability.
(a)
This part shall apply to each new major stationary source or major
modification that is major for the following:
(1) The pollutant for which the area in which the
source is or would be located is designated nonattainment under 40 CFR §81.330; or
(2) NOx or VOC if the source is or would be located in the Northeast Ozone Transport Region (OTR), as
defined in Env-A 618.03(b)(3).
(b)
Classification of a project relative to whether or not it is a major
modification and therefore subject to this part pursuant to (a) above, shall be
performed as described in 40 CFR §51.165(a)(2)(ii)(A)
through (F) and by taking the sum of the emissions increase from each emissions
unit affected by the project.
(c) In accordance with 40 CFR
51.165(a)(6), except as otherwise provided in 40 CFR 51.165(a)(6)(vi), the
specific provisions of 40 CFR 51.165(a)(6)(i) through
(v) shall apply with respect to any regulated NSR pollutant emitted from
projects at existing emissions units at a major stationary source (other than
projects at a source with a plant-wide applicability limit (PAL) as per Env-A
618.09) in circumstances where:
(1) There is a reasonable possibility, within the
meaning of 40 CFR 51.165(a)(6)(vi), that a project that is not a part of a
major modification may result in a significant emissions increase of such
pollutant; and
(2) The owner or operator elects to use the
method specified in paragraphs 40 CFR 51.165(a)(1)(xxviii)(B)(1) through (3) for calculating projected actual emissions.
(d)
If a source or modification is determined to be a major stationary
source or major modification solely by virtue of a relaxation in any
enforceable limitation established after August 7, 1980, on the capacity of the
source or modification otherwise to emit a pollutant, such as a restriction of
hours of operation, then the provisions of this part shall apply to the source
or modification as though construction had not yet commenced on the source or
modification.
Source. #7879, eff 4-26-03 (formerly Env-A 621.01);
ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000, eff
10-1-11; ss by #10175, eff 9-1-12 (from Env-A 618.01); ss by #12011, eff
10-22-16; ss by #13510, eff 12-17-22
Env-A 618.03 Definitions.
(a)
For the purposes of this part, the definitions contained in 40 CFR §51.165(a)(1) and
(f)(2), shall apply with the following clarifications and revisions:
(1) “Baseline
actual emissions” means the definition as specified in 40 CFR §51.165(a)(1)(xxxv)
with the following revisions:
a. The same consecutive 24-month period shall be
used for all pollutants;
b. The 24-month period shall be selected from
the 5-year period immediately preceding the date when the owner or operator
begins actual construction of the project; and
c. The department shall allow the
use of a time period up to 10 years immediately preceding the date when the
owner or operator begins actual construction of the project or allow the use of
a different consecutive 24-month period for different pollutants upon
determining that the alternative time period is more representative of normal
source operations, upon adequate demonstration by the applicant;
(2) “Reasonable period” as used
in the definition of “net emissions increase” in 40 CFR §51.165(a)(1)(vi)(C)(1) means the period from 5 years
prior to the date that a complete permit application for the subject project is
received by the department to the expiration date of the air permit issued for
the project; and
(b)
For the purpose of this part, the following additional definitions shall
apply:
(1) “Emissions offset” means a reduction in
pollutant emissions achieved at an existing source meeting the criteria
specified in 40 CFR §51.165(a)(3).
(2) “Emissions offset ratio” means the ratio of
the total actual emissions reduction obtained to the total allowable emissions
increase of the subject pollutant from a new source or source modification;
(3) “Northeast Ozone Transport Region” means,
pursuant to Part D, Subpart 2, Section 184(a) of the Act, the geographical area
comprising of the states of:
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
l. The Consolidated Metropolitan Statistical
Area that includes the
(4) “Offset source” means a source, stationary or
mobile, from which a new or modified source obtains or seeks to obtain an
emission offset; and
(5) “Ozone season” means the continuous period
between April 1 and October 31, inclusive.
Source. #7879, eff 4-26-03 (formerly Env-A 622.04);
ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000, eff
10-1-11; ss by #10175, eff 9-1-12 (from Env-A 618.02); ss by #13510, eff
12-17-22
Env-A 618.04 Owner or Operator Obligations.
(a)
Except as provided in (b) below, the owner or operator of any new major
stationary source or major modification subject to this part shall:
(1) Comply with the lowest achievable emission
rate (LAER);
(2) Obtain offsets for the increase in emissions
for the project in accordance with Env-A 618.07; and
(3) Obtain a nonattainment NSR permit before
beginning actual construction of the project.
(b)
Approval of an application to comply with NSR, as specified in Env-A
618.06, or establish a PAL, as specified in Env-A 618.09, shall not relieve the
owner or operator of responsibility to otherwise comply with these rules or
local, state, or federal law.
(c)
The owner or operator of an existing major source with a plantwide
applicability limit (PAL) shall comply with the provisions of its PAL.
(d)
The owner or operator of a source shall make the information specified
in 40 CFR 51.165(a)(6) available for review upon a request for inspection by
the department or the general public as specified in
40 CFR 70.4(b)(3)(viii).
Source. #7879, eff
4-26-03 (formerly Env-A 622.05(a)-(c)); ss by #9906, INTERIM, eff 4-26-11,
EXPIRES: 10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12;
ss by #12011, eff 10-22-16; ss by #13510, eff 12-17-22
Env-A 618.05 Implementation Plan Requirements. In accordance with section 173(a)(4) of the
Act, the department shall not issue a permit or permits to a stationary source
to which the requirements of this part apply if the administrator has
determined that the applicable implementation plan is not being adequately
implemented for the nonattainment area in which the proposed source is to be
constructed or modified.
Source. #7879, eff 4-26-03 (formerly Env-A
622.05(c)(5)-(d)); amd by #9791, eff 10-1-10; amd by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss
by #10000, eff 10-1-11; ss by #10175, eff 9-1-12 (from Env-A 618.06); ss by
#13510, eff 12-17-22
Env-A 618.06 Permit Application Requirements.
(a)
Nonattainment NSR and plantwide applicability limit (PAL) permit
applications required under this part shall be filed in accordance with the
procedures set forth in Env-A 607.03.
(b)
An application for a nonattainment NSR permit shall contain the
following items:
(1) A control technology evaluation to
demonstrate that any new major stationary source or major modification will
meet the LAER for all new or modified emission units;
(2) A documented plan to obtain creditable
emission reduction offsets in accordance with Env-A 618.07;
(3) A demonstration showing that
all major stationary sources in New Hampshire, which are owned or operated by
such person or any entity controlling, controlled by, or under common control
with such person, are subject to emission limitations and are in compliance, or
are on a schedule for compliance which is federally enforceable or contained in
a court decree, with all applicable emission limitations and standards under
the Act; and
(4) A demonstration showing that the benefits of
the proposed source significantly outweigh the environmental and social costs
imposed as a result of its location, construction, or
modification by providing an analysis of alternative sites, sizes, production
processes, and environmental control techniques in accordance with section
173(a)(5) of the Act.
(c)
An application for a permit to establish a PAL shall contain the
information required pursuant to 40 CFR §51.165(f)(3).
Source. #7879, eff 4-26-03 (formerly Env-A 622.06); amd by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss
by #10000, eff 10-1-11; ss by #10175, eff 9-1-12 (from Env-A 618.03); ss by
#13510, eff 12-17-22
Env-A 618.07 Emissions Offset Requirements.
(a)
The baseline for an emission offset shall be
the actual emissions of the source from which the offset credit is to be
obtained.
(b)
Offset credit shall not include:
(1) Any reductions from compliance, or scheduled
compliance, with applicable rules in effect prior to the permit application of
the new or modified source;
(2) Reductions required to meet RACT or acid
deposition provisions of the Act, as stipulated in the General Preamble for the
Implementation of Title I of the Clean Air Act Amendments of 1990, 57 FR 13553,
III.G.2.e; or
(3) Reductions required to meet any other
provisions of Env-A 100 et seq. and the Act.
(c)
Emissions offsets shall achieve, at a minimum, a ratio of total actual
emissions reductions to emissions increases of at least 1:1, except as listed
in Table 618-1, below, subject to the notes in (d), below:
Table 618-1
NSR Offset Ratio Requirements for 8-hour Ozone Nonattainment Designations
|
Nonattainment Classification |
NOx Offset Ratio Requirement |
VOC Offset Ratio Requirement |
|
Transitional/Submarginal |
1:1 |
1:1 |
|
Marginal |
1.1:1 |
1.1:1 |
|
Moderate |
1.15:1 |
1.15:1 |
|
Ozone Transport
Region |
1.15:1 |
1.15:1 |
|
Serious |
1.2:1 |
1.2:1 |
|
Severe |
1.3:1 |
1.3:1 |
|
Extreme |
1.5:1 |
1.5:1 |
(d)
The following shall apply to table 618-1:
(1) In accordance with 40 CFR Part 51 Appendix S,
Paragraph IV.G, in any severe nonattainment area for ozone, the NOx and VOC
offset ratios shall be at least 1.3:1, except that the ratios may be at least
1.2:1 if the department also requires all existing major sources in such
nonattainment area to use best available control technology (BACT) for the
control of NOx and VOC; and
(2) In accordance with 40 CFR Part 51 Appendix S,
Paragraph IV.G, in any extreme nonattainment area for ozone, the NOx and VOC
offset ratios shall be at least 1.5:1, except that the ratios may be at least
1.2:1 if the department also requires all existing major sources in such
nonattainment area to use BACT for the control of NOx and VOC.
(e)
Emissions offsets shall be obtained from offset sources that are
located:
(1) Within the OTR for NOx and VOC; and
(2) For all other pollutants, within the same
nonattainment area or within another area of equal or higher nonattainment
classification, subject to the provisions of (f), below.
(f)
The owner or operator of a source seeking to obtain emissions offsets
from offset sources located in the areas specified in (e)(2), above, shall
demonstrate that the emissions from the nonattainment area in which the offset
source is located contribute to a violation of the national ambient air quality
standard in the nonattainment area in which the new or modified source is
seeking to locate.
(g)
Offsets obtained outside
Source. #7879, eff 4-26-03 (formerly Env-A 622.07);
ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000, eff 10-1-11;
ss by #10175, eff 9-1-12 (Env-A 618.04); ss by #13510, eff 12-17-22
Env-A 618.08 Procedure for Acquiring and Implementing
Emissions Offsets. Emissions offsets
for a new major stationary source or major modification shall be acquired and
implemented in accordance with the following procedure:
(a)
The owner or operator shall submit documentation to the department
identifying the following:
(1) Offset pollutant(s);
(2) Actual annual emissions estimates of each
pollutant identified in (1), above, during normal operation of the new or
modified source prior to the modification;
(3) Potential annual emissions estimates of each
pollutant identified in (1) above, of the new or modified source after the
modification;
(4) Offset source(s) and location(s);
(5) Actual and allowable annual emissions
estimates of each pollutant identified in (1), above, for the offset source(s)
identified in (3), above, prior to the effective date of the offset(s);
(6) Potential annual emissions estimates of each
pollutant identified in (1), above, for the offset source(s) identified in (3),
above, during normal operation of the new or modified source, that would occur
after the effective date of the offset(s); and
(7) For NOx and VOC, the ozone season emissions
in addition to the annual estimates required in (2), (4), and (5) above;
(b)
A new or modified source obtaining offset(s) from sources outside New
Hampshire shall file with the department documentation verifying that the
offset source(s) has obtained a federally enforceable permit, or other
federally enforceable document, for the emissions reduction control measures
pertaining to the offset(s) for which the new or modified source is seeking
approval;
(c)
The emissions reductions obtained from the
offset source in accordance with (a) and (b), above, shall be:
(1) Ensured by a federally enforceable permit or
other federally enforceable document; and
(2) In effect no later than the date on which the
new or modified source commences operations;
(d)
Stationary sources may use ERCs, in accordance with Env-A 3006.04, to
satisfy any requirement under the Act or RSA 125-C for offsets; and
(e)
All DERs used to meet offset requirements under this part shall comply
with the requirements of Section 173 of the Act, 40 CFR §51.165(a), and
Env-A 3108.02.
Source. #7879, eff 4-26-03 (formerly Env-A 622.08);
ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000, eff 10-1-11;
ss by #10175, eff 9-1-12 (Env-A 618.05); ss by #13510, eff 12-17-22
Env-A 618.09 Establishing a PAL. A PAL shall be established, re-opened,
renewed, increased, monitored, recorded, and reported in accordance with 40 CFR
§51.165(f)(1), (4), and (6)-(14), except that offsets shall be created and used
in accordance with Env-A 618.07 and Env-A 618.08, and the public participation
requirements shall be replaced by Env-A 618.10(b) and (c).
Source. #7879, eff
4-26-03 (formerly Env-A 622.09); ss by #9906, INTERIM, eff 4-26-11, EXPIRES:
10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
Env-A 618.10 Department Review and Public Notice.
(a)
A permit application to comply with NSR or establish a PAL filed with
the department pursuant to this part shall be reviewed in accordance with the
criteria set forth in Env-A 607.04.
(b) A permit application to comply with
NSR or establish a PAL pursuant to this part shall be subject to the public
notice procedures specified in Env-A 621.04.
(c)
The department shall address all material comments received during the
public comment period before taking final action on a PAL permit application.
Source. #10175, eff 9-1-12 (from Env-A 618.07); ss by
#13510, eff 12-17-22
PART
Env-A 619 PREVENTION OF SIGNIFICANT
DETERIORATION
Env-A 619.01 Purpose. The purpose of this part is to implement the
prevention of significant deterioration (PSD) program, as set forth in Sections160
through 169B of the Act and 40 CFR §52.21.
Source. #6057-B, eff 6-30-95 (from Env-A 616.01); ss
by #7879, eff 4-26-03 (formerly Env-A 623.01); ss by #9906, INTERIM, eff
4-26-11, EXPIRES: 10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
Env-A 619.02 Applicability.
(a)
This part shall apply to each new major stationary source or major
modification for a source located in an area designated as attainment or
unclassifiable under §107(d)(1)(B) of the Act for which the regulated NSR
pollutant is subject to regulation.
(b)
This part shall not apply to a major stationary source or major
modification with respect to a particular pollutant if the owner or operator
demonstrates that, as to that pollutant, the source or modification is located in an area designated as nonattainment under §107
of the Act.
Source. #7879, eff 4-26-03 (formerly Env-A 623.02);
ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000, eff 10-1-11;
ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 619.03 PSD Program Requirements.
(a)
In furtherance of RSA 125-C:11 and except as provided in (b) and (d),
below, the provisions of 40 CFR §52.21(a)(2), (b)
through (e), (h) through (k)(1), (l) through (p), (r), (v), (w), (aa), and
(bb), and 40 CFR 51.165(b), July 1, 2016 edition, shall apply for the
purpose of implementing a PSD permit program that meets the requirements of
Title I of the Act.
(b)
For the purposes of this part, the word “department” shall replace the
word “administrator” in the paragraphs of 40 CFR §52.21 referenced
in (a), above, except in the following paragraphs:
(1) Paragraph (b)(17);
(2) Paragraph (b)(37)(i);
(3) Paragraph (b)(43);
(4) Paragraph (b)(48)(ii)(c);
(5) Paragraph (b)(50)(i);
(6) Paragraph (b)(51);
(7) Paragraph (l)(2); and
(8) Paragraph (v).
(c)
For the purpose of this part, the definitions contained in 40 CFR §52.21(b), shall
apply with the following revisions:
(1) For the purposes of calculating baseline
actual emissions pursuant to 40 CFR §52.21(b)(48):
a. The same consecutive 24-month period shall be
used for all pollutants;
b. The 24-month period shall be selected from
the 5-year period immediately preceding the date the owner or operator begins
actual construction of the project; and
c. The department shall allow the use of a
different time period up to 10 years immediately
preceding the date the owner or operator begins actual construction of the
project or allow use of a different consecutive 24-month period for different
pollutants upon demonstration by the applicant that it is more representative
of normal source operations.
(d)
For the purposes of this part, the reference to Appendix W in 40 CFR
52.21(l) shall refer to the July 1, 2019 edition.
Source. #7879, eff 4-26-03 (formerly Env-A 623.03);
ss by #9840, eff 12-21-10; ss by #10175, eff 9-1-12; ss by #12011, eff 10-22-16;
ss by #13191, eff 4-21-21; ss by #13510, eff 12-17-22
Env-A 619.04 Owner or Operator Obligations.
(a)
Except as provided in (b), below, the owner or operator of any new major
stationary source or major modification subject to this part shall comply with
BACT.
(b)
The owner or operator of an existing major source with a PAL shall
comply with the provisions of its PAL.
Source. #7879, eff 4-26-03 (formerly Env-A 623.04);
ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000, eff
10-1-11; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 619.05 Permit Application Requirements.
(a)
PSD and PAL permit applications required under this part shall be filed
in accordance with the procedures set forth in Env-A 607.03;
(b)
An application to comply with PSD shall contain additional information
as follows:
(1) A control technology evaluation, in
accordance with 40 CFR §52.21(j), to demonstrate that any new major stationary
source or major modification will meet the BACT for all new or modified
emissions units;
(2) A source impact
analysis, in accordance with 40 CFR §52.21(k)(1);
(3) An air quality
analysis in accordance with 40 CFR §52.21(m);
(4) Source information required
in accordance with 40 CFR §52.21(n);
(5) Additional impact
analyses required pursuant to 40 CFR §52.21(o); and
(6) For sources
impacting federal class I areas, a class I area impact analysis required in accordance
with 40 CFR §52.21(p);
(c)
An application for a permit to establish a PAL, shall contain the
information required pursuant to 40 CFR §52.21(aa)(3);
and
(d)
The department shall provide written notice of an application for a PSD
permit to the federal land manager(s) in accordance with 40 CFR §52.21(p).
Source. #7879, eff 4-26-03 (formerly Env-A 623.05);
ss by #9791, eff 10-1-10; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A
619.06 Designation of Class I and
Class II Areas.
(a)
Pursuant to 40 CFR §52.21(e)(1) and Section 162 of the Act, the
following areas shall be designated as Class I areas in
(1) The Great Gulf Wilderness, of approximately
6,000 acres, as specified in P.L. 88-577; and
(2) The Presidential Range - Dry River
Wilderness, of approximately 20,000 acres, as specified in P.L. 93-622.
(b)
Pursuant to 40 CFR §52.21(g)(1) and Section 162 of the Act, all other
areas in
Source. #7879, eff 4-26-03 (formerly Env-A 623.06);
ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000, eff
10-1-11; ss by #10175, eff 9-1-12 (from Env-A 619.04); ss by #13510, eff
12-17-22
Env-A 619.07 Department Review and Public Notice.
(a)
A permit application to comply with PSD or to establish a PAL filed with
the department pursuant to this part shall be reviewed in accordance with the
criteria set forth in Env-A 607.04 and 40 CFR §52.21(j)-(p).
(b)
In the event of a deficiency in a permit application to comply with PSD
or to establish a PAL for which the department notifies the applicant in
writing pursuant to Env-A 607.06(a), the date of filing of the application for
purposes of (c), below, shall be the date on which the department receives all
required information.
(c) Within one year after the filing of a
complete permit application to comply with PSD or to establish a PAL, the
department shall make a final determination of whether construction should be
approved, approved with conditions, or denied.
(d) A permit application filed in
accordance with this part shall be subject to the public notice procedures
specified in Env-A 621.03.
Source. #10175, eff 9-1-12 (from Env-A 619.05); ss by
#12011, eff 10-22-16; ss by #13510, eff 12-17-22
Env-A 619.08 Increment Consumption.
(a)
The department shall periodically perform a review of increases in
pollutant concentrations over the baseline concentration, as that term is
defined in 40 CFR §52.21(b)(13), to determine whether the ambient air
increments, as established in 40 CFR §52.21(c), have been violated in any PSD
area within the state.
(b) Within 60 days of the discovery of a
violation of an ambient air increment, as established in 40 CFR 52.21(c), the
department shall submit to the administrator a plan for insuring that the
violation shall be mitigated as soon as possible.
Source. #10175, eff 9-1-12 (from Env-A 619.06); ss by
#13510, eff 12-17-22
PART
Env-A 620 PROCEDURES FOR ESTABLISHING
AND REESTABLISHING GENERAL STATE PERMITS
Env-A 620.01 Applicability. The public notice and comment, EPA review,
public hearing and appeal procedures specified in this part shall apply to the
establishment and reestablishment of general state permits.
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; rpld
by #6057-B, eff 6-30-95; ss by #6782-B, eff 6-30-98; ss and moved by #8129, eff
7-28-04 (formerly Env-A 204.01); ss by #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 620.02 Public Notice and Comment During the
Establishment of a General State Permit.
The department shall provide public notice and a public comment period
for each proposed general state permit in accordance with the following
provisions:
(a)
Within 10 days after the completion of a proposed general state permit,
the department shall publish a public notice of intent to establish the general
state permit;
(b)
The public notice shall be published in a newspaper of general daily
statewide circulation;
(c)
The public notice shall contain the following information:
(1) A statement of the department’s intent to
establish the general state permit and a brief description of the general state
permit;
(2) A statement specifying that any person who
wishes to request a public hearing regarding the proposed general state permit, shall do so within 30 days of publication of the
public notice;
(3) An explanation of how to request such
hearing; and
(4) The deadline by which and the address to
which written comments or requests for a public hearing shall be sent, the date
to be no sooner than 30 days after publication of the notice; and
(d)
The department shall make a copy of the proposed general state permit
available to the public for inspection upon request.
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; rpld
by #6057-B, eff 6-30-95; ss by #6782-B, eff 6-30-98; ss and moved by #8129, eff
7-28-04 (formerly Env-A 204.02); ss by #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 620.03 EPA Review During the Establishment of a
General State Permit. The department
shall provide the following information to EPA for its review pertaining to the
proposed general state permit established for each source category:
(a)
A copy of the public notice and the proposed general state permit,
within 10 days of completion of the proposal by the department;
(b)
All written correspondence received by the department relative to the
petition for the establishment of the source category pursuant to Env-A 610.05,
upon request; and
(c) Within 10 days of the department’s decision
to issue or deny the proposed general state permit, either:
(1) A copy of the final permit if established,
and the findings that support the decision to establish; or
(2) A copy of the findings that support the
decision to deny.
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; rpld
by #6057-B, eff 6-30-95; ss by #6782-B, eff 6-30-98; ss and moved by #8129, eff
7-28-04 (formerly Env-A 204.03); ss by #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 620.04 Public Hearing During the Establishment of
a General State Permit.
(a)
The department shall provide an opportunity for a public hearing prior
to establishing a general state permit for a source category in accordance with
the following provisions:
(1) Any person who raises a material issue of
fact may request that a public hearing be held by the department regarding the
establishment of the general state permit described in the public notice; and
(2) Any such request shall indicate the name and
address of the person(s) filing such a request, the reason(s) that a public
hearing is requested, and the material issue(s) which the person(s) would like
to have addressed at the hearing.
(b)
The department shall grant the request for a public hearing upon finding
that the person making the request is entitled under (a)(1), above, to request
a hearing.
(c)
Upon granting a request for a public hearing, the department shall:
(1) Schedule a public hearing, which shall be
conducted in accordance with the non-adjudicatory public hearing procedures
specified in Env-C 200, as supplemented by Env-A 200;
(2) Notify the requesting party via first class
mail of the hearing date, location, and time; and
(3) Notify the general public
of the public hearing by publishing the date, time, and location of the public
hearing in a newspaper of general daily statewide circulation, at least 30 days
prior to the public hearing.
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; rpld
by #6057-B, eff 6-30-95; ss by #6782-B, eff 6-30-98; ss and moved by #8129, eff
7-28-04 (formerly Env-A 204.04); ss by #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 620.05 Decisions.
(a) Within 15 days after the close of the comment period specified pursuant to Env-A
620.02, in accordance with the provisions of Env-A 610.05(b)(3) and
610.06(b)(2), the department shall:
(1) Establish the general state permit, and set
forth in writing the findings that support the decision to establish the
permit;
(2) Deny the establishment of the general state
permit and set forth in writing the findings that support the decision to deny
the permit; or
(3) Schedule a public hearing in accordance with
the provisions of Env-A 620.04.
(b)
Subject to (d), below, within 15 days of the close of the record of the
public hearing, the department shall issue a decision
pursuant to either (a)(1) or (a)(2), above.
(c) The department shall consider all written
comments received during the public comment period provided pursuant to Env-A
620.02.
(d)
In the event the department determines that additional information is
necessary to make an informed decision, the department shall request such
information and issue a decision in accordance with (a)(1) or (a)(2), above,
within 15 days of receiving
such information.
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; rpld
by #6057-B, eff 6-30-95; ss by #6782-B, eff 6-30-98; ss and moved by #8129, eff
7-28-04 (formerly Env-A 204.05); amd by #9791, eff
10-1-10; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 620.06 Public Notice and Comment During the
Reestablishment of a General State Permit.
The department shall provide public notice and a public comment period
for the reestablishment of a general state permit for
a particular source category in accordance with the following provisions:
(a)
Within 7 months prior to the end of the 5-year general state permit
period, the department shall publish a public notice of intent to reestablish the general state permit;
(b)
The public notice shall be published in a newspaper of general daily
statewide circulation; and
(c)
The public notice shall contain the following information:
(1) A statement of the department’s intent to
reestablish the general state permit and a brief description of the general
state permit;
(2) The location(s) where, and hours during
which, the draft general state permit and a list of the sources currently
covered by the general state permit, including source location, may be
examined;
(3) A statement specifying that any person who
wishes to request a public hearing regarding the reestablishment of the general
state permit, shall do so within 30 days of publication of the public notice;
(4) An explanation of how to request such a
hearing; and
(5) The deadline by which and the address to
which written comments or requests for a public hearing shall be sent, the date
to be no sooner than 30 days after publication of the notice.
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; rpld
by #6057-B, eff 6-30-95; ss by #6782-B, eff 6-30-98; ss and moved by #8129, eff
7-28-04 (formerly Env-A 204.06); ss by #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 620.07 EPA Review During the Reestablishment of a
General State Permit. The department
shall provide the following information pertaining to the proposed reestablishment of the general state permit for each source
category, to EPA for review:
(a)
A copy of the public notice and the proposed general state permit,
within 10 days of completion of the proposal by the department; and
(b)
Within 10 days of the department’s decision to reestablish or deny
reestablishment of the general state permit provide either:
(1) A copy of the final permit if reestablished,
and the findings that support the decision to reestablish; or
(2) A copy of the findings that support the
decision to deny.
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; rpld
by #6057-B, eff 6-30-95; ss by #6782-B, eff 6-30-98; ss and moved by #8129, eff
7-28-04 (formerly Env-A 204.07); ss by #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 620.08 Public Hearing During the Reestablishment
of a General State Permit. The
department shall provide an opportunity for a public hearing on the reestablishment of the general state permit for each source
category in accordance with Env-A 620.04.
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; rpld
by #6057-B, eff 6-30-95; ss by #6782-B, eff 6-30-98; ss and moved by #8129, eff
7-28-04 (formerly Env-A 204.08); ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
Env-A 620.09 Appeals. An appeal may be taken in accordance with RSA
125-C:12, III.
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; rpld
by #6057-B, eff 6-30-95; ss by #6782-B, eff 6-30-98; ss and moved by #8129, eff
7-28-04 (formerly Env-A 204.09); ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
PART
Env-A 621 PERMIT NOTICE AND HEARING
PROCEDURES: TEMPORARY PERMITS AND
PERMITS TO OPERATE
Env-A 621.01 Applicability. The public notice and hearing procedures
specified in this part shall apply to all applications for the issuance of,
amendment to, or denial of temporary permits and permits to operate.
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss by #5989, eff 2-22-95;
EXPIRED: 2-22-03
New. #8129, eff 7-28-04 (formerly Env-A 205.01); ss by #10175,
eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 621.02 Public Notice.
(a)
This section shall apply to all permit applications except those subject to the requirements of:
(1) Env-A 609, relating to title V permits;
(2) Env-A 610, relating to general permits;
(3) Env-A 611, relating to acid rain permits;
(4) Env-A 612, relating to:
a. Amendments, modifications, and revisions of
title V permits; and
b. Minor permit amendments of temporary permits
and state permits to operate;
(5) Env-A 618, relating to temporary permits
subject to nonattainment requirements; and
(6) Env-A 619, relating to PSD permits.
(b)
Within 10 days after the completion of a draft temporary permit, draft
permit to operate, or draft decision to deny the application with supporting
findings of fact, the department shall prepare a public
notice of the receipt of the permit application and the intent to issue, amend,
or deny such permit.
(c)
Public notice of the intent to issue, amend, or deny a temporary permit
or permit to operate shall contain the following information:
(1) The name and address of the applicant;
(2) The location of the source;
(3) A brief description of the stationary source,
area source or device sought to be permitted;
(4) The location(s) where, and the hours during
which, the completed application and other pertinent information may be
examined; and
(5) The date by which, and the address where, written comments or requests for a public hearing
shall be filed.
(d)
The deadline for written comments or public hearing requests shall not
be sooner than 30 days after the publication of the notice.
(e)
The public notice shall be published by either the department or the
applicant, at the applicant’s option, once in a newspaper of general daily
circulation and once in a newspaper of general circulation in the area in which
the source is located.
(f)
The applicant shall provide to the department:
(1) Proof of each publication of the notice if
the applicant publishes it; or
(2) Payment of the publication costs incurred by
the department and an administrative fee of $15.00 if the applicant requests
the department to publish the notice.
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss by #5989, eff 2-22-95;
amd by #7541, eff 7-27-01; paragraphs (b)-(e)
EXPIRED: 2-22-03
New. #8129, eff 7-28-04 (formerly Env-A 205.02);
ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 621.03 Applications Subject to PSD Requirements. For permit applications subject to the
requirements of Env-A 619, the public notice procedures of Env-A 621.04, with
the following changes, shall supersede the provisions specified in Env-A
621.02:
(a)
In place of the requirements of Env-A 621.04(c)(6), the public notice
shall indicate the degree of increment consumption that is expected from the
source or modification; and
(b)
In Env-A 621.04(c)(7), substitute “BACT” for “LAER”.
Source. #2204, eff 12-9-82; ss by #2332, eff 4-29-83;
ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss by #5989, eff 2-22-95
(formerly Env-A 205.10); ss by #7541, eff 7-27-01
New. #8129, eff 7-28-04 (formerly Env-A 205.03);
ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 621.04 Applications Subject to Nonattainment
Requirements. For permit
applications subject to the requirements of Env-A 618, the following public
notice procedures shall supersede the provisions specified in Env-A 621.02:
(a)
Within 10 days after the completion of a draft temporary permit, or
draft decision and findings of fact, the department shall issue a public notice of the receipt of the permit application and
the preliminary determination to issue, amend, or deny such permit.
(b)
The public notice shall be published once in a newspaper of general
daily statewide circulation and once in a newspaper circulated at least once
per week in the immediate area of the proposed source.
(c)
Public notice of the preliminary determination to issue, amend, or deny
a temporary permit shall contain the following information:
(1) The name and
address of the applicant;
(2) The location of the source;
(3) A brief description of
the stationary source, area source or device sought to be permitted;
(4)
For new sources or devices, the emissions resulting from the installation;
(5) For modified sources or devices, the
significant net emissions increase resulting from the modification, if any;
(6) For new or modified
sources or devices, the quantity and geographical location(s), in terms of
street address, if applicable, or longitude and latitude, of the offset
source(s) and devices from which the offsets will be obtained;
(7) The determination
of LAER, including the type of equipment, such as a carbon adsorption system,
and, if applicable, the prescribed emission limit;
(8) The location(s) where, and the hours during
which, the completed application and other pertinent information may be
examined; and
(9) The date by which, and the address where, written comments or requests for a public hearing
shall be filed.
(d)
The deadline for written comments or public hearing requests shall not
be sooner than 30 days after the publication of the notice.
(e)
The department shall distribute copies of the public notice to the
following parties:
(1)
The applicant;
(2) The EPA;
(3) Any state or Indian
governing body whose lands may be affected by emissions from the source or
modification;
(4) The current
official(s) of the city or town where the source is or would be located;
(5) The regional planning agency, if applicable,
where the source is or would be located; and
(6) The Federal Land Manager.
(f)
The department shall make available for public inspection, at a location
in the immediate area of the proposed source, copies of the following
materials:
(1) All information, to the
extent required or permitted by RSA 91-A and RSA 125-C:6, VII, submitted by the
applicant;
(2) The department’s
analysis of the effect of the proposed facility on air quality; and
(3) The preliminary determination to issue,
amend, or deny the permit and all other materials, if any, considered
in making such determination.
Source. #5989, eff 2-22-95; amd
by #7541, eff 7-27-01; subparagraphs (c)(1)-(9) and paragraphs (d)-(f) EXPIRED:
2-22-03
New. #8129, eff 7-28-04 (formerly Env-A 205.04);
ss by #10175, eff 9-1-12; ss by #12011, eff 10-22-16; ss by #13510, eff
12-17-22
Env-A 621.05 Notification to EPA. The department shall submit to EPA:
(a)
Copies of the public notice and the draft temporary permit, draft permit
to operate, or draft decision and findings of fact within 10 days of completion
of the draft; and
(b)
Copies of the final temporary permit, final permit to operate, or final
decision and findings of fact within 10 days of issuance.
Source. #5989, eff 2-22-95; EXPIRED: 2-22-03
New. #8129, eff 7-28-04 (formerly Env-A 205.05);
ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 621.06 Requests for Public Hearing.
(a)
The department shall provide an opportunity for a public hearing on all
applications for new or amended temporary permits or permits to operate.
(b)
Any person or group of persons who raises an
issue of fact relevant to a term or condition in a draft permit may request
that a public hearing be held by the department regarding the issuance of,
amendment to, or denial of a temporary permit or permit to operate.
(c)
A request for a public hearing on a permit application shall:
(1) Indicate the basis on which the person(s)
filing the request meets the requirements of (b), above;
(2) Be in writing; and
(3) Be delivered to the department office by 4:00
p.m. on or before the date stated in the public notice
required under Env-A 621.02.
(d)
The department shall grant the request for a public hearing on a permit
application upon finding that the person or group making the request:
(1) Is entitled under (b), above, to request a
hearing; and
(2) Has met the requirements of (c), above.
(e)
Upon granting a request for a public hearing, the department shall:
(1) Schedule a public hearing to be conducted in
accordance with the procedures specified in Env-A 203; and
(2) Notify the applicant and the requesting party
in writing of the hearing date, location, and time.
(f)
The notice specified in (e)(2), above, shall be published by either the
department or the applicant, at the applicant’s option, at least 30 days prior
to the public hearing in a newspaper of general daily circulation and in a
newspaper of general circulation in the area in which the source is or is
proposed to be located.
(g)
The applicant shall provide to the department:
(1) Proof of each publication of the notice if
the applicant publishes it; or
(2) Payment of the publication costs incurred by
the department and an administrative fee of $15.00 if the applicant asks the
department to publish the notice.
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss by #5989, eff 2-22-95
(formerly Env-A 205.03); EXPIRED: 2-22-03
New. #8129, eff 7-28-04 (formerly Env-A 205.06);
ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 621.07 Public Access to Information.
(a)
If the applicant is not a municipality, the applicant shall file 2
copies of the permit application with the department.
(b)
If the applicant is a municipality, the applicant shall file one copy of
the permit application with the department and shall make another copy
available to the public for review.
(c)
If the applicant is not a municipality, the department shall deliver one
copy of the permit application to the municipality in which the source is or
will be located.
(d) To the extent permitted by RSA
125-C:6, VII, and Env-C 208, the department shall make the following
information available to the public for inspection:
(1) All applications and other forms or
information submitted by the applicant in support of a permit application;
(2) All correspondence with
regard to an application and any attachments thereto;
(3) Written comments received during the comment
period provided in Env-A 621.02(d)(5); and
(4) All temporary permits or permits to operate
or other determinations of the department.
(e)
The department shall provide copies of the information listed above upon
request.
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss by #5989, eff 2-22-95
(formerly Env-A 205.04); EXPIRED: 2-22-03
New. #8129, eff 7-28-04 (formerly Env-A 205.07); amd by #9791, eff 10-1-10; ss by #10175, eff 9-1-12; ss by
#13510, eff 12-17-22
Env-A 621.08 Opportunity for Response. The department shall provide a copy of all
written comments and requests for a public hearing to the applicant upon
request. Within 10 working days of the close of the comment period specified in Env-A 621.02(d)(5),
Env-A 621.03, or Env-A 621.04(c)(9), the applicant may file with the department
a written response to any of the written comments received during the comment
period.
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss by #5989, eff 2-22-95
(formerly Env-A 205.05); EXPIRED: 2-22-03
New. #8129, eff 7-28-04 (formerly Env-A 205.08);
ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 621.09 Decisions.
(a)
Within 30 working days after the close of the
comment period specified in Env-A 621.02(d)(5), Env-A 621.03, or Env-A
621.04(c)(9), in accordance with the requirements of RSA 125-C:11, the
department shall:
(1) Approve the application,
issue the permit(s) subject to conditions, and set forth in writing the
findings with an explanation of the basis of such approval;
(2) Deny the application and set forth in writing
the findings with an explanation of the basis of such disapproval; or
(3) Schedule a hearing to be conducted in
accordance with the provisions of Env-A 203, and
notify the applicant and the person(s) who requested such hearing.
(b)
Within 30 working days after the close of the comment period following a
public hearing, the department shall issue a decision pursuant to either (a)(1)
or (a)(2), above.
(c)
In making the decision, the department shall consider the application,
all written comments received during the public comment period specified in the
public notice issued pursuant to Env-A 621.02(d)(5), Env-A 621.03, or Env-A
621.04(c)(9), as well as the applicant's written response thereto, and any
testimony presented at the public hearing, if one was held.
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss by #5989, eff 2-22-95
(formerly Env-A 205.06); EXPIRED: 2-22-03
New. #8129, eff 7-28-04 (formerly Env-A 205.09);
ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 621.10 Appeals. The procedures and deadlines for appeals
shall be as stated in RSA 125-C, RSA 21-O:14, and the rules of the air
resources council, Ec-Air 203.
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss by #5989, eff 2-22-95
(formerly Env-A 205.07); EXPIRED: 2-22-03
New. #8129, eff 7-28-04 (formerly Env-A 205.10);
ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
PART
Env-A 622 PERMIT NOTICE AND HEARING
PROCEDURES: TITLE V OPERATING PERMITS
Env-A 622.01 Applicability. The public notice and hearing procedures
specified in this part shall apply to:
(a)
All applications for the issuance, significant modification to, or
renewal of title V operating permits filed with the department; and
(b)
All requests for title V permit reopenings.
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by 2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss by #6057-B, eff
6-30-95; EXPIRED: 6-30-03
New. #8129, eff 7-28-04 (formerly Env-A 206.01);
ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 622.02 Public Notice.
(a)
Within 10 days after the completion of a draft title V operating permit,
the department shall prepare a public notice of the
receipt of application and the intent to issue such permit.
(b)
The public notice shall contain the following information:
(1) The name and address of the applicant;
(2) The location of the site or the proposed
site;
(3) A brief description of the source and the
activity or activities involved in the permit action;
(4) For permit modifications, the change in
emissions resulting from such modification;
(5) The name, address, and phone number of the
person to be contacted for further information;
(6) The location(s) where, and the hours during
which, the completed application and other pertinent information may be
examined and obtained;
(7) A statement that any person may request a
public hearing and an explanation of how to request such hearing;
(8) The date, no sooner than 30 days after the
publication of the notice, by which and the address where written comments and
requests for a public hearing shall be filed;
(9) The number of allowances authorized pursuant
to 40 CFR §73.10(b) for any acid rain affected source;
(10) The name and address of the permitting
authority; and
(11) The identity of the title V source.
(c)
The public notice shall be published by either the department or the
applicant, at the applicant’s option, once in a newspaper of general daily
statewide circulation and once in a newspaper of general circulation in the
area in which the source is located.
(d)
The applicant shall provide to the department:
(1) Proof of each publication of the notice if
the applicant publishes it; or
(2) Payment of the publication costs incurred by
the department and an administrative fee of $15.00 if the applicant asks the
department to publish the notice.
(e)
The public notice shall be given to persons on
a mailing list developed by the department which shall include all persons who request in writing to be on such list.
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by 2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss by #6057-B, eff
6-30-95; EXPIRED: 6-30-03
New. #8129, eff 7-28-04 (formerly Env-A 206.02);
ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 622.03 Notice to Affected States.
(a)
The department shall provide a copy of the notice of a draft title V operating permit, including the deadline by which
comments shall be received, to all affected states at or before the time notice
is provided to the public.
(b)
The department shall provide a copy of the draft title V operating
permit to an affected state upon request.
(c)
The department shall send written notification to any affected state and
EPA of its refusal to incorporate any or all recommendations submitted by an
affected state into the proposed permit together with the reason(s) for not
accepting such recommendations.
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by 2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss by #6057-B, eff
6-30-95; EXPIRED: 6-30-03
New. #8129, eff 7-28-04 (formerly Env-A 206.03);
ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 622.04 EPA Review.
(a)
The department shall provide the following to EPA:
(1) A copy of the permit application or, upon
agreement with EPA, a summary thereof, unless the applicant has filed a copy of
the permit application with EPA pursuant to Env-A 609.06(d);
(2) A written statement regarding the legal and
factual basis for all permit conditions contained in any draft title V
operating permit, including references to the applicable statutory or
regulatory provisions:
(3) After the end of the public comment period
specified in Env-A 622.02, a copy of the proposed title V operating permit; and
(4) A copy of the final title V operating permit,
if issued.
(b)
Pursuant to 40 CFR §70.8(c), the EPA shall have 45 days from the date of
receipt of a proposed title V operating permit to object, in writing, to the
issuance of the proposed permit if EPA determines the proposed permit is not in
compliance with applicable requirements of the title V operating permit program
or
the rules
promulgated thereunder.
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by 2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss by #6057-B, eff
6-30-95; EXPIRED: 6-30-03
New. #8129, eff 7-28-04 (formerly Env-A 206.04); amd by #9791, eff 10-1-10; ss by #10175, eff 9-1-12; ss by
#13510, eff 12-17-22
Env-A 622.05 Requests for Public Hearing.
(a)
Any person or group of persons may make a request during the public
comment period to the department that a public hearing be held by the
department regarding the issuance of a title V operating permit.
(b)
Any such request shall:
(1) Indicate the interest of the person(s) filing
such a request;
(2) Indicate the reason(s) that a public hearing
is warranted;
(3) Indicate the material issues which the
person(s) would like to have addressed at such hearing;
(4) Be in writing; and
(5) Be delivered to the department office by 4:00
p.m. on or before the date stated in the public notice
required under Env-A 622.02.
(c)
The department shall grant the request for a public hearing on a title V
operating permit unless it is determined that:
(1) The issue(s) raised in the request for a
public hearing is immaterial or irrelevant; or
(2) The person or group making the request did
not comply with (b), above.
(d)
The department shall provide written notice of the grant or denial of a
request for hearing to the person(s) making the request and to the applicant of
the title V operating permit. If the
request is denied, the department shall also provide the reason(s) for the
denial.
(e)
Upon granting a request for a public hearing, the department shall:
(1) Schedule a public hearing to be conducted in
accordance with the procedures specified in Env-A 203; and
(2) Notify the applicant and the requesting party
of the hearing date, location, and time.
(f)
The notice specified in (e)(2), above, shall be published by either the
department or the applicant, at the applicant’s option, at least 30 days prior
to the public hearing in a newspaper of general daily circulation and in a
newspaper of general circulation in an area in which the site is located.
(g)
The applicant shall provide to the department:
(1) Proof of each publication of the notice if
the applicant publishes it; or
(2) Payment of the publication costs incurred by
the department and an administrative fee of $15.00 if the applicant asks the
department to publish the notice.
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by 2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss by #6057-B, eff
6-30-95; EXPIRED: 6-30-03
New. #8129, eff 7-28-04 (formerly Env-A 206.05);
ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 622.06 Public Access to Information.
(a)
When applying to the department for a permit or permit modification, the
applicant shall file 2 copies of the permit application with the department,
except as noted in (b), below.
(b)
If the applicant is a municipality, the applicant shall file one copy of
the permit application with the department and shall make another copy
available to the public for review.
(c)
If the applicant is not a municipality, the department shall deliver one
copy of the permit application to the municipality in which the source is or
will be located.
(d)
To the extent permitted by RSA 125-C:6, VII, and Env-C 208, the
department shall make available for public inspection and provide copies upon
request of the following:
(1) All applications and other forms of
information submitted in support of a permit application, including the
compliance plan and the compliance certification and monitoring reports, if
applicable;
(2) All correspondence with
regard to an application and any attachments thereto;
(3) Written comments received during the comment
period held pursuant to Env-A 622.02;
(4) The draft title V operating permit; and
(5) A written statement regarding the legal and
factual basis for all permit conditions contained in any draft title V
operating permit, including references to the applicable statutory or
regulatory provisions.
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by 2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss by #6057-B, eff
6-30-95; EXPIRED: 6-30-03
New. #8129, eff 7-28-04 (formerly Env-A 206.06); amd by #9791, eff 10-1-10; ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
Env-A 622.07 Opportunity for Response. The department shall make available to the
applicant all written comments and requests for a public hearing upon
request. Within 10 working days after
the close of the public comment period specified in
Env-A 622.02, the applicant may file with the department a written response to
any of the written comments received during the comment period.
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by 2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss by #6057-B, eff
6-30-95; EXPIRED: 6-30-03
New. #8129, eff 7-28-04 (formerly Env-A 206.07);
ss by #10175, eff -9-1-12; ss by #13510, eff 12-17-22
Env-A 622.08 Decisions.
(a) Within 30 working days after the close
of the comment period specified in Env-A 622.02, the department shall either:
(1) Approve the application providing that no
objection has been filed by EPA, issue the proposed permit, and set forth in
writing the findings that support the decision to issue the permit;
(2) Deny the application and set forth in writing
the findings that support the decision to deny the application; or
(3) Schedule a public hearing to be conducted in
accordance with the provisions of Env-A 203.
(b)
Subject to (d), below, within 30 working days after the close of the
comment period following a public hearing, the department shall issue a
decision pursuant to either (a)(1) or (a)(2), above.
(c)
The department shall consider all written comments received during the
public comment period provided pursuant to Env-A 622.02, as well as the
applicant's written response thereto, and any testimony presented at the public
hearing, if one was held.
(d)
In the event the department determines that additional information is
necessary to make an informed decision, the department shall request such
information and shall issue a decision in accordance with (a)(1) or (a)(2),
above, within 30 working days after receiving such information.
(e)
The department shall issue the final permit:
(1) After receiving notice from EPA that EPA will
not object to the proposed permit; or
(2) If EPA does not file a written objection
within 45 days of its receipt of a proposed permit.
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by 2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss by #6057-B, eff
6-30-95; EXPIRED: 6-30-03
New. #8129, eff 7-28-04 (formerly Env-A 206.08) ss
by #10175, eff 9-1-12; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 622.09 Appeals.
(a)
The procedures and deadlines for appeals shall be as stated in RSA
125-C, RSA 21-O:14, and the rules of the air resources council, Ec-Air 203.
(b)
In the event that a petition for appeal is filed and an appeal hearing
is conducted by the council, upon a decision by the council the department
shall take such action as is necessary to reflect the council’s decision. Any action taken by the department shall
occur after expiration of the 45-day review period by EPA under Env-A 622.04(b)
and 40 CFR §70.8(c).
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by 2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss by #6057-B, eff
6-30-95; EXPIRED: 6-30-03
New. #8129, eff 7-28-04 (formerly Env-A 206.09);
ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
PART
Env-A 623 PERMIT REVOCATION AND
SUSPENSION
Env-A 623.01 Applicability. The provisions of this part shall not apply
to any revocation of a title V operating permit which is a result of a permit
reopening pursuant to Env-A 609.19.
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss by #6057-B, eff
6-30-95; EXPIRED: 6-30-03
New. #8129, eff 7-28-04 (formerly Env-A 209.01);
ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 623.02 Suspension, Revocation or Modification of
Permits.
(a)
The department shall make an initial decision to suspend, revoke, or
modify a stationary source's permit whenever information is received that
supports a conclusion that the owner or operator is
not in compliance with the terms of the permit.
(b)
Upon making such an initial decision, the department shall notify the
owner or operator in writing of the intention to suspend, revoke, or modify
said permit and an explanation of the basis for the department's decision.
(c)
Pursuant to RSA 541-A:30 and RSA 125-C:13, the department shall schedule
a hearing on the notice of proposed permit suspension, revocation, or
modification.
(d)
Such hearing shall be conducted in accordance with the provisions of
Env-A 203.
(e)
Within 15 days of the close of any hearing conducted pursuant to (d),
above, the department shall issue a decision to the owner or operator to
suspend, revoke, or modify a permit. The
decision shall be in writing and shall state the basis
for the decision.
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss and moved by #6057-B,
eff 6-30-95 (from Env-A 209.01); EXPIRED: 6-30-03
New. #8129, eff 7-28-04 (formerly Env-A 209.02);
ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 623.03 Appeals. The procedures and deadlines for appeals
shall be as stated in RSA 125-C, RSA 21-O:14, and the rules of the air
resources council, Ec-Air 203.
Source. #1710, eff 2-19-81; ss by #2332, eff 4-29-83;
ss by #2938, eff 12-27-84; ss by #5033, eff 12-27-90; ss and moved by #6057-B,
eff 6-30-95 (from Env-A 209.02); EXPIRED: 6-30-03
New. #8129, eff 7-28-04 (formerly Env-A 209.03);
ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
PART Env-A
624 PERMITS FOR THE COMBUSTION OF
NON-EXEMPT FUEL
Env-A 624.01 Applicability.
(a)
Except as provided in (b) or (c), below, this part applies to the owner
or operator of a source that is required to obtain a title V operating permit and which will combust a non-exempt
fuel.
(b)
As specified in RSA 125-C:10-b, VII, the following sources shall not be
subject to this part:
(1) A municipal waste combustor subject to RSA
125-M;
(2) A chemical recovery combustion source at a
pulp and paper mill subject to 40 CFR 63, Subpart MM;
(3) A device at an affected source that combusts
material of which at least 90 percent by weight is exempt fuel;
(4) An affected source that is within a listed
source category and subject to a performance standard or emission guidelines
established by the United States Environmental Protection Agency (U.S. EPA) pursuant to either section
111 or section 112 or section 129 of the Clean Air Act, provided that these
standards and guidelines are at least as stringent as those achieved by
applying BACT as specified under Env-A 624.06; or
(5) A device at an affected source that, as of
June 29, 2005, is allowed by permit to combust non-exempt fuel unless there is
a significant modification of such device after that date.
(c)
As provided in RSA 125-C:10-b, VII(f), a
source shall be exempt from this part if its potential uncontrolled emissions
are less than the following:
(1) For particulate matter containing lead, 16
pounds of lead per year;
(2) For mercury, 1.2 pounds per year; and
(3) For dioxin, 0.0013 grams per year.
Source. #8654, eff 6-8-06; ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
Env-A 624.02
Definitions. For purposes
of this part, the following definitions shall apply:
(a)
“Best available control technology (BACT)” means “best available control
technology” as defined in RSA 125-C:10-b, I(a), as reprinted in Appendix C;
(b)
“Dioxin” means “dioxin” as defined in RSA 125-C:2, VI-a, as reprinted in
Appendix C. The term includes the net
summed mass of each of 17 CDDs and CDFs after applying the EPA approved toxic
equivalency factors (TEFs) to each of the 17 CDDs and CDFs;
(c)
“Exempt fuel” means “exempt fuel” as defined in RSA 125-C:10-b, I(b), as
reprinted in Appendix C;
(d)
“Non-exempt fuel” means any combustible material other than exempt fuel;
and
(e)
“Particulate matter” means “particulate matter” as defined in RSA
125-C:2, IX-f, as reprinted in Appendix C.
Source. #8654, eff 6-8-06; ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
Env-A 624.03 Permit Application Required.
(a)
As specified in RSA 125-C:10-b, II, the construction, installation,
operation, or significant modification of any source subject to this part shall
be prohibited unless a permit is first obtained from the department.
(b)
Prior to initiating construction, installation, or operation, the owner
or operator of a source that is subject to RSA 125-C:10-b shall obtain a
temporary permit from the department that establishes emission limitations for
such source based on BACT for controlling the emissions of mercury, dioxin, or
particulate matter, including lead, from such source in accordance with Env-A
624.06.
(c)
The owner or operator of a source subject to (b), above, shall file a
timely application for and obtain a title V operating permit or amendment
thereof in accordance with Env-A 609 or Env-A 612, as applicable, for the
continued operation of that source.
Source. #8654, eff 6-8-06; amd
by #9791, eff 10-1-10; ss by #10175, eff 9-1-12; ss by #13510, eff 12-17-22
Env-A 624.04 Permit Application Requirements. In addition to the information required in
Env-A 607.03, the permit application required in Env-A 624.03 shall include:
(a)
A description of the nature, location, design capacity, and typical
operating schedule of the source or modification, including specifications and
drawings showing its design and plant layout;
(b)
A detailed schedule for construction of the source or modification;
(c)
A detailed description of the system of emission reduction proposed for
the source or modification and emission estimates;
(d)
A BACT analysis for mercury, dioxin, and
particulate matter, including lead, as specified in Env-A 624.05, if the
potential uncontrolled emissions of any one of these 3 pollutants exceed the
applicable threshold in Env-A 624.01(c);
(e)
The results of deposition modeling conducted pursuant to Env-A 624.08;
(f)
A human health risk assessment conducted in accordance with Env-A
624.09;
(g)
A fuel monitoring plan demonstrating how the owner or operator will
comply with permit emission limits by periodically monitoring the fuel for
lead, mercury, and dioxin at the source, prior to combustion; and
(h) A soil sampling plan to determine existing
background environmental concentrations of lead, mercury, and dioxin.
Source. #8654, eff 6-8-06; ss by #10154, eff 9-1-12;
ss by #13510, eff 12-17-22
Env-A 624.05 BACT Analysis. The BACT analysis required under Env-A
624.04(d) shall be conducted in accordance with the following:
(a)
The applicant shall identify all control options, such as the use of
lower-emitting raw materials, lower-emitting process equipment, or add-on
control equipment, that have the potential to reduce emissions;
(b)
The applicant shall provide information on any control option that the
applicant deems to be technically infeasible that is sufficient to allow the
department to evaluate the feasibility of said control option;
(c)
The applicant shall rank the remaining control technologies and list
them in order of control effectiveness, with the most effective alternative at
the top;
(d)
The applicant shall further evaluate the top-ranked control option and
may eliminate it from further consideration if, based on its energy, economic,
or environmental impact, the control option would result in unusual or
prohibitive impacts as described in (f), below, at the source under review when
compared to other similar sources;
(e)
The applicant shall provide the department with documentation of all
steps taken to comply with (a) through (d) above and the reasoning behind each
step; and
(f)
For purposes of (d), above, the following shall apply:
(1) An unusual or prohibitive environmental
impact would arise if using the most effective technology would create adverse
environmental impacts greater than those sought to be minimized through the use of the technology;
(2) An unusual or prohibitive economic impact
would arise if the costs of the most effective technology were clearly
excessive in relation to the benefit to be obtained from the technology; and
(3)
An unusual or prohibitive energy impact would arise if the
electricity required to operate a BACT level of control would be so large that
it would make the operation of the device infeasible.
Source. #8654, eff 6-8-06; ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
Env-A 624.06 BACT Determination. The department shall select as BACT for the
source under review the top-ranked control option remaining after the
procedures in Env-A 624.05 have been followed, provided that the option does
not result in either:
(a)
Emissions of any air contaminant that would exceed the emissions allowed
by any applicable standard under RSA 125-C or RSA 125-I or rules adopted
pursuant to either chapter; or
(b)
Emissions of particulate matter, mercury, or dioxin in an amount
disproportionate to the emissions of any of those 3 air contaminants from other
similar air pollution control devices for those air contaminants at facilities
using similar combustion technology and similar fuels. For the purpose of
this requirement, an amount disproportionate shall be an emission rate that is
more than 20 percent greater, as expressed in terms of pounds of contaminant
emitted per million British Thermal Units of heat input.
Source. #8654, eff 6-8-06; ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
Env-A 624.07 Duration of BACT Determinations.
(a)
At the time a significant modification is made or, if no significant
modification is made, no later than 7 years after the date of issuance of the
permit, the owner or operator of an affected source shall perform a new BACT
analysis and submit it to the department.
(b)
If as a result of the BACT analysis the
department establishes any BACT limit that is more stringent than the existing
BACT limit, the source shall comply with the new limit(s) within 3 years of the
date the limit is established.
Source. #8654, eff 6-8-06; ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
Env-A 624.08 Air Pollution Deposition Modeling.
(a)
In addition to the modeling required under Env-A 606, the owner or
operator of a source subject to RSA 125-C:10-b shall conduct a complete air
pollution dispersion modeling analysis to determine the deposition of lead,
mercury, and dioxin from the source’s emissions.
(b)
The modeling analysis shall be conducted in accordance with 40 CFR 51,
Appendix W, using any model or methodology, as applicable, that the
administrator has specified or proposed for inclusion in 40 CFR 51, Appendix W.
(c)
The modeling analysis shall quantitatively evaluate the deposition of
lead, mercury, and dioxin from the source’s emissions.
(d)
For the purpose of the modeling required in (a), above, the numerical
value representing the estimated air emissions of lead from the source shall be
doubled as a safety factor prior to being used in the model.
(e)
The owner or operator shall determine background environmental
concentrations of lead, mercury, and dioxin and shall add those concentrations
to the modeling analysis.
(f)
The modeling analysis shall include the combined effects of all sources
subject to a title V operating permit and which are
within 100 km of the source seeking a permit application under this part.
(g) The
modeling analysis shall be presented in a form that can be used in a human
health risk assessment, as detailed in Env-A 624.09.
Source. #8654, eff 6-8-06; ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
Env-A 624.09 Human Health Risk Assessment.
(a)
The owner or operator shall estimate worst case soil concentrations for
lead, mercury, and dioxin, incorporating background concentrations with
estimated soil concentrations derived using the deposition rates estimated
pursuant to Env-A 624.08, and guidance from the 1998 U.S. EPA Human Health Risk
Assessment Protocol for Hazardous Waste Combustion Facilities (HHRAP), with a
20-year deposition period and a mixing depth of one centimeter.
(b)
Human health risk from the modeled soil lead concentrations shall be
estimated using the U.S. EPA Integrated Exposure Uptake Biokinetic Model for
Lead in Children (IEUBK win v2), May 2021 version, which is
available as noted in Appendix A, and incorporating background environmental
lead exposures.
(c)
The department shall deny the application if:
(1) The estimate of the cumulative soil
concentration of either lead, mercury, or dioxin at the location of maximum
deposition, as modeled pursuant to (a), above, exceeds the following values:
a. For lead, 400 milligrams per kilogram
(mg/kg);
b. For mercury, 13 mg/kg; and
c. For dioxin, 0.000007 mg/kg; or
(2) There is a greater than 5 percent probability
of a child's estimated blood lead level, as modeled pursuant to (b), above,
exceeding the United States Centers for Disease Control’s level of concern,
namely 10 micrograms per deciliter.
Source. #8654, eff 6-8-06; ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
Env-A 624.10 Permit Conditions. Any permit issued to the owner or operator of
a source subject to RSA 125-C:10-b shall:
(a)
Establish fuel specifications for lead, mercury, and chlorine content;
and
(b) Establish test methods for the fuel, using
U.S. EPA SW-846, Test Methods for Evaluating Solid Waste, Physical/Chemical
Methods and applicable American Society for Testing and Materials (ASTM)
sampling methods, to certify that the fuel meets the fuel specifications
established in (a), above, prior to being combusted.
Source. #8654, eff 6-8-06; ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
Env-A 624.11 Stack Testing and CEM Requirements.
(a)
Within 60 days after achieving the maximum production rate at which a
source subject to this part will be operated, but not later than 180 days after
initial startup of such facility, the owner or operator of the source shall
conduct an initial compliance stack test in accordance with Env-A 802 to
demonstrate compliance with the emission limits established under Env-A 624.06.
(b)
As specified in RSA 125 -C:10-b, III:
(1) If stack testing results show that emissions
from the source are less than but within 10 percent of the emission limitation
for a specific air contaminant established under Env-A 624.06, the owner or
operator shall install a continuous emission monitor (CEM) system for that air
contaminant pursuant to Env-A 808;
(2) If a CEM system that complies with Env-A 808 is not available for that air contaminant, the owner
or operator of the source shall submit a plan, including monitoring and stack
testing requirements, for ensuring that the emission limitation for that air
contaminant is not exceeded until such time as a CEM system becomes available;
and
(3) Once a CEM system is available, the owner or
operator shall install that system within 24 months of department approval of
the CEM monitoring plan submitted pursuant to Env-A
808.04.
Source. #8654, eff 6-8-06; ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
Env-A 624.12 Acceptance of Applications. The department shall not act on any permit
application for the combustion of fuel derived from construction and demolition
debris until the studies conducted pursuant to Chapters 169 and 205 of the Laws
of 2005 have been completed and the moratorium on burning construction and
demolition debris has been terminated.
Source. #8654, eff 6-8-06; ss by #10175, eff 9-1-12;
ss by #13510, eff 12-17-22
PART
Env-A 625 LIMITATIONS ON POTENTIAL TO
EMIT
Env-A 625.01 Applicability. This part shall apply to the owner or
operator of a VOC- or HAP-emitting source who is limiting the potential to emit
of that operation to less than 50 tons of VOCs, 10 tons of any individual HAP,
and 25 tons of combined HAPs for any consecutive 12-month period in accordance
with this part, except for those facilities using control equipment to limit
potential emissions.
Source. #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 625.02 Definitions. For the purposes of this part, the following
definitions shall apply:
(a)
“Digital printing line” means an operation where the transfer of
electronic files occurs directly from the computer to an electronically driven
output device that prints the image directly on the selected media substrate
with inks and not dry toners;
(b)
“Industrial laundry operation” means an establishment primarily engaged
in supplying, on a rental or contract basis, laundered industrial work uniforms
and related work clothing, such as protective apparel, flame and heat
resistant, and clean room apparel; dust control items, such as treated mops,
rugs, mats, dust tool covers, cloths, and shop or wiping towels;
(c)
“Print towels” means towels or other fabric used to remove ink from a
printing operation;
(d)
“Screen printing” means a printing process in which printing ink,
coating, or adhesive material is passed through a taut web or fabric to which a
refined form of stencil has been applied, and where the stencil openings
determine the form and dimension of the imprint;
(e)
“Shop towels” means towels or other fabric used to remove dust, oil, or
grease and wipe down parts or operations;
(f)
“Soils” means contaminants that are removed from the parts being
cleaned, including, but not limited to, grease, oils, waxes, metal chips,
carbon deposits, fluxes, and tars;
(g)
“Solvent cleaning operation” means a process using a device or piece of
equipment that uses solvent-containing liquid or solvent vapor to remove soils
from the surfaces of materials. Types of
solvent cleaning machines include, but are not limited to, batch vapor, in-line
vapor, in-line cold, and batch cold solvent cleaning machines; and
(h)
“Surface coating operation” means a process or processes used to apply a
layer of material onto a substrate including manual brushing, spray painting,
dip coating, roller coating and electrostatic deposition, but exclusive of
printing, publishing or packaging operations and auto body shops.
Source. #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 625.03 Written Notification Required. An owner or operator electing to comply with
this part shall send a written notification to the department stating their
intention to operate under the emission caps established in this part,
including a statement that the facility has determined that the stationary
source, area source or device does not meet any of the applicability thresholds
in accordance with Env-A 607.01.
Source. #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 625.04 Limitations on Potential to Emit. Notwithstanding the definition of “potential
to emit” in Env-A 104 and unless otherwise determined by
a permit or order of the department, a stationary source identified in Env-A
625.01 whose owner or operator operates the source in compliance with all
applicable requirements of Env-A 625 shall be considered to have a potential to
emit for any consecutive 12-month period less than:
(a)
50 tons of VOCs;
(b)
10 tons of any individual HAP; and
(c)
25 tons of combined HAPs.
Source. #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 625.05 Material Usage Limits.
(a)
The owner or operator of a stationary source at which
at least 90 percent of the emissions from the source in any calendar year are
attributable to one of the operations listed below shall
limit material usage to no more than the amount specified in each calendar
year:
(1) For non-heatset
offset lithographic printing, 7,125 gallons of cleaning solvent and fountain
solution additives, excluding water;
(2) For heatset web
offset lithographic printing, 50,000 pounds of ink, cleaning solvent, fountain
solution additives;
(3) For flexography and rotogravure operations
using solvent inks, 50,000 pounds of ink, coatings, adhesives, dilution
solvents, and cleaning solvents;
(4) For flexography and rotogravure operations
using UV-cured or water-based inks, coatings, and adhesives, 200,000 pounds of
inks, coatings, and adhesives;
(5) For screen printers, 7,125 gallons of solvent
based inks, cleaning solvent, adhesives, and coatings;
(6) For digital printing operations, 6,000
gallons of solvent from inks and clean-up solutions and other solvent
containing materials combined;
(7) For each printing operation listed in (1)
through (6), above, 1,333 gallons of HAP-containing material, excluding waste;
(8) For solvent cleaning operations:
a. 6,800 gallons of any solvent-containing
material containing no halogenated solvents;
b. 800 gallons of solvent-containing materials
containing halogenated solvents; and
c. 1,200 gallons of any combination of
solvent-containing material containing a mixture of both non-halogenated
solvents and one or more halogenated solvents; and
(9) For surface coating operations, 3,000 gallons
of solvent-containing material, excluding waste.
(b)
For any combination of screen, digital, flexographic, letterpress, non-heatset lithographic, or heatset
lithographic printing processes, the owner or operator shall limit the
potential to emit pursuant to Env-A 625.07.
Source. #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 625.06 Operating Limits. The owner or operator of a stationary source at which at least 90 percent
of the emissions from the source in any calendar year are attributable to one
of the operations listed below shall limit operations
in each calendar year as follows:
(a)
For auto body shops that paint automobiles or automobile parts:
(1) If primarily engaged in collision repair, 2
or fewer bays devoted to painting;
(2) If repainting entire vehicles, one bay
devoted to painting; and
(3) The physical or operational capacity to do no
more than 21 jobs per week.
(b)
For industrial laundry operations, cleaning less than 1,300 tons of
soiled shop towels or 120 tons of soiled print towels, or 120 tons of both
soiled shop and print towels.
Source. #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 625.07 Emission Limitation. In lieu of Env-A 625.05 or Env-A 625.06, the
owner or operator of a stationary source shall be in
compliance with this part if actual emissions without controls in each
calendar year period do not exceed any of the following limits:
(a)
25 tons of VOCs:
(b)
5 tons of any individual HAP; and
(c)
12.5 tons of combined HAPs.
Source. #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 625.08 Recordkeeping Requirements. The owner or operator of any source that is
operating to comply with the requirements of this part shall maintain:
(a)
Purchase records or material usage records to demonstrate compliance
with applicable coating, printing, and solvent limitations in Env-A 625.05;
(b)
Customer records to demonstrate compliance with laundering limitations
in Env-A 625.06(b); or
(c)
Records of the information used to calculate actual emissions for each
calendar year to demonstrate compliance with emission limitations in Env-A
625.07 as follows:
(1) Equipment type, description, make and model,
and maximum design process rate or throughput;
(2) Types and specifications of materials used,
including VOC and HAP content, and any process information used in the
emissions calculations;
(3) Monthly record of raw materials used with support
information such as purchase orders or invoices.
Source. #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Env-A 625.09 Applicable Law. Nothing in this section shall relieve an
owner or operator from any obligation to comply with any other applicable
federal, state or local law.
Source. #10175, eff 9-1-12; ss by #13510, eff
12-17-22
Appendix A: Incorporation by
Reference Information
|
Rule |
Title |
Obtain at: |
||
|
Env-A
624.09(b) |
U.S.
EPA Integrated Exposure Uptake Biokinetic Model for Lead in Children (IEUBK
win v2) |
A written copy of this material can be
obtained by writing to: U.S. Department of Commerce Or by calling: 1-866-282-8622 The
Windows-based version of the IEUBK model can be downloaded from the website
at https://www.epa.gov/superfund/lead-superfund-sites-software-and-users-manuals#integrated There is no cost for this material. |
||
|
Env-A
610.08(b)(1) |
Form
GSP-2 |
A written copy of this material is attached as Appendix D, and is available on-line at: NH Online Forms System - GSP-2 Internal Combustion Engine - Emergency Generators or Fire Pump Engines. Version 1.4 There is no cost for this material. |
||
Appendix B: State/Federal Statutes and Regulations
Implemented
|
Rule Section(s) |
|
|
Env-A
601.01 |
RSA
125-C:6; RSA 125-C:11; RSA 125-I:3 |
|
Env-A
601.02, Env-A 601.03 |
RSA
125-C:11; RSA 125-C:12; RSA 125-I:5 |
|
Env-A
602.01 |
RSA
125-C:4, I(a) |
|
Env-A
603.01 |
RSA
125-C:11; RSA 125-I:5 |
|
Env-A
603.02 |
RSA
125-C:6, XIV |
|
Env-A
604.01, Env-A 604.02 |
RSA
125-C:11, II & III |
|
Env-A
605.01 |
RSA
125-C:11 |
|
Env-A
605.02, Env-A 605.03 |
RSA
125-C:12, I |
|
Env-A
605.04 |
RSA
125-C:12, I; 42 U.S.C.§7661b(b) & (c); §40
CFR 70.6(d) |
|
Env-A
606.01 - Env-A 606.06 |
RSA
125-C:11, II & IV; RSA 125-I:5, V; 42
U.S.C. §410(a)(2)(K) |
|
Env-A
607.01(a) - (x) |
RSA
125-C:11 |
|
Env-A
607.01(y) |
RSA
125-C:11; RSA 125-I |
|
Env-A
607.01(z) - (aa) |
RSA
125-C:11; RSA 125-J; RSA 125-O |
|
Env-A
607.01(ab) |
RSA
125-C:11; RSA 125-O |
|
Env-A 607.02 |
RSA 125-C:11 |
|
Env-A 607.03 |
RSA 125-C:4,
I(a) |
|
Env-A 607.04 |
RSA
125-C:11, II & IV |
|
Env-A 607.05 |
RSA
541-A:29, I |
|
Env-A 607.06 |
RSA 125-C:12, I |
|
Env-A 607.07 |
RSA
125-C:12, II |
|
Env-A
607.08 |
RSA
125-C:11, II; RSA 125-C:13; 40 CFR §52.21(r)(2) |
|
Env-A 607.09 |
RSA
125-C:11 |
|
Env-A
608.01, Env-A 608.02 |
RSA
125-C:11 |
|
Env-A
608.03 |
RSA
125-C:12, I |
|
Env-A
608.04 |
RSA
125-C:11, III |
|
Env-A
608.05 |
RSA
541-A:29, I |
|
Env-A
608.06 |
RSA
125-C:12, I |
|
Env-A
608.07 |
RSA
125-C:12, II |
|
Env-A 608.08 |
RSA 125-C:11,
III; RSA 125-C:13 |
|
Env-A
608.09 |
RSA
125-C:11 |
|
Env-A 608.10(a) |
RSA 125-C:12, I |
|
Env-A 608.10(b) |
RSA 125-C:12, IV |
|
Env-A
608.11, Env-A 608.12 |
RSA
125-C:11 |
|
Env-A
609.01 |
RSA
125-C:11, I-a; 42 U.S.C. §7661a; 40 CFR §70.3 |
|
Env-A
609.02 |
RSA
125-C:11, I-a; RSA 125-C:13 |
|
Env-A
609.03 |
RSA
125-C:11, I |
|
Env-A
609.04 |
RSA
125-C:12, I; 40 CFR §70.5(c) |
|
Env-A
609.05 |
RSA
125-C:11, I-a; 42 U.S.C. §7661c; 40 CFR §70.6 |
|
Env-A 609.06 |
RSA 125-C:12, I;
; 42 U.S.C. §7661a(b); 40 CFR §70.5 |
|
Env-A 609.07 |
RSA 125-C:11,
I-a; 42 U.S.C. §7661b(c); 40 CFR §70.5(a)(1) |
|
Env-A 609.08(a) |
RSA 125-C:11,
I-a; 42 U.S.C. §7661b(d); 40 CFR §70.5(a)(2) |
|
Env-A 609.08(b) |
RSA 125-C:12, I;
42 U.S.C. §7661b(d); 40 CFR §70.5(a)(2) |
|
Env-A
609.09 |
RSA
125-C:11, I-a; 42 U.S.C. §7661c(f); 40 CFR §70.6(f) |
|
Env-A
609.10 |
RSA
125-C:11, IV; 42 U.S.C. §7661a(b)(5); 40 CFR §70.7(a) |
|
Env-A
609.11 |
RSA
541-A:29, I; 42 U.S.C. §7661a(b)(1); 40 CFR §70.5(a)(2) |
|
Env-A 609.12 |
RSA 125-C:12, I;
42 U.S.C. §7661b(d); 40 CFR §70.5(b) |
|
Env-A
609.13(a) |
RSA
125-C:12, II; 42 U.S.C. §7661a(b)(6); 40 CFR §70.7(a) |
|
Env-A
609.13(b) |
RSA
125-C:6, X; 42 U.S.C. §7661d(b); 40 CFR §70.8(a) & (c) |
|
Env-A
609.13(c) |
RSA
125-C:12, II; 42 U.S.C. §7661b(c); 40 CFR §70.7(a)(2) |
|
Env-A
609.14(a) |
RSA
125-C:6, X; 42 U.S.C. §7661d(b)(3); 40 CFR §70.8(c)(1) |
|
Env-A
609.14(b) & (c) |
RSA
125-C:6, X; 42 U.S.C. §7661d(c); 40 CFR §70.8(c)(4) |
|
Env-A 609.15 |
RSA 125-C:11,
I-a; 42 U.S.C. §7661b(d); 40 CFR §70.7(b) & (c) |
|
Env-A
609.16(a) & (b) |
RSA
125-C:11, I-a; 42 U.S.C. §7661a(b)(1); 40 CFR §70.6(a)(2) |
|
Env-A
609.16(c) |
RSA
125-C:11, I-a; 42 U.S.C. §7651g(a); 40 CFR §72.73(b)(2) |
|
Env-A
609.17 |
RSA
125-C:12, I |
|
Env-A 609.18(a) |
RSA 125-C:11,
I-a; 42 U.S.C. §7661a(b)(5)(C); 40 CFR §70.7(c) |
|
Env-A 609.18(b) |
RSA 125-C:12, II
& IV; 42 U.S.C. §7661a(b)(6); |
|
Env-A
609.19(a)(1) & (d) |
RSA
125-C:13, IV; 42 U.S.C. §7661a(b)(9); 40 CFR §70.7(f) |
|
Env-A
609.19(a)(2) |
RSA
125-C:13, IV; 42 U.S.C. §7661e(b); 40 CFR §70.7(f) |
|
Env-A
609.19(a)(3) & (4) |
RSA
125-C:13, IV; 40 CFR §70.7(f) |
|
Env-A
609.19(b) & (c) |
RSA
125-C:13, IV; 42 U.S.C. §7661a(b)(6); 40 CFR §70.7(f) |
|
Env-A
609.19(e) |
RSA
125-C:13, IV; 42 U.S.C. §7661d(e); 40 CFR §70.7(g) |
|
Env-A
609.19(f) & (g) |
RSA
125-C:13, IV; 42 U.S.C. §7661d(c); 40 CFR §70.7(g) |
|
Env-A
610.01 |
RSA
125-C:6, XIV; RSA 125-C:11, I; 42 U.S.C. §7661c(d); |
|
Env-A
610.02 – Env-A 610.13 |
RSA
125-C:6, XIV; RSA 125-C:11, I & III |
|
Env-A
610.14 & Env-A 610.15; Env-A
610.16 |
RSA
125-C:6, XIV; RSA 125-C:11, I-a; 42 U.S.C. §7661c(d); |
|
Env-A
611.01 |
RSA
125-C:6, XIV; RSA 125-C:11, I-a; 42 U.S.C. §7651g(a); |
|
Env-A
611.02 & Env-A 611.03 |
RSA
125-C:11, I-a; RSA 125-D:3; 42 U.S.C. §7651g(a); |
|
Env-A
611.04 |
RSA
125-C:11, I-a; 42 U.S.C. §7651g(d)(3); |
|
Env-A
611.05 |
RSA
125-C:11, I-a; RSA 125-D:3; 42 U.S.C. §7651g(b); |
|
Env-A
611.06 |
RSA
125-C:6, X; 42 U.S.C. §7661d(b); 40 CFR §70.8(a) |
|
Env-A
611.07(a)(1) |
RSA
125-C:11, I-a; 42 U.S.C. §7651g(a)(1); |
|
Env-A
611.07(a)(2) |
RSA
125-C:11, I-a; 40 CFR §72.9(h)(2) |
|
Env-A
611.07(a)(3) |
RSA
125-C:11, I-a; 42 U.S.C. §7651b(f); 40 CFR §72.9(h)(1) |
|
Env-A
611.07(a)(4) |
RSA
125-C:11, I-a; 42 U.S.C. §7651b(d)(1); 40 CFR §73.30 |
|
Env-A
611.07(b) |
RSA
125-D:3,I(f) |
|
Env-A
611.08 |
RSA
125-C:12, II; 40 CFR §72.72(b)(1) |
|
Env-A
611.09 |
RSA
125-C:11, I-a; 42 U.S.C. §7661c(f); |
|
Env-A
611.10(a) |
RSA
125-C:6, XIV; 42 U.S.C. §7651g(a)(4); 40 CFR §72.70(b) |
|
Env-A
611.10(b) |
RSA
125-C:6, XIV; 40 CFR §72.84 |
|
Env-A
611.10(c)(1) |
RSA
125-C:6, XIV; 40 CFR §72.85(d) |
|
Env-A
611.10(c)(2) |
RSA
125-C:6, XIV; 40 CFR §72.9(g)(3); 40 CFR §72.80(c) |
|
Env-A
611.10(c)(3) |
RSA
125-C:6, XIV; 40 CFR §72.80(e) |
|
Env-A
611.10(d) |
RSA
125-C:6, XIV; 40 CFR §72.80(d) |
|
Env-A
611.11 |
RSA
125-C:6, XIV; 40 CFR §72.72(b)(2); 40 CFR §72.81(c)(ii) |
|
Env-A
611.12 |
RSA
125-C:13, III & IV; 40 CFR §72.85 |
|
Env-A
611.13 |
RSA
125-C:14; 40 CFR §72.72(b)(5)(i) |
|
Env-A 612.01 |
RSA 125-C:12,
II; 42 U.S.C. §7661a(b)(6); 40 CFR §70.7(d)(3) |
|
Env-A
612.02 |
RSA
125-C:4, I(d), RSA 125-C:6, XIV, RSA 125-C:11, I-a, |
|
Env-A 612.03 |
RSA 125-C:6,
XIV; RSA 125-C:12, I |
|
Env-A 612.04 |
RSA 125-C:11, I;
RSA 125-C:12, I |
|
Env-A 612.05 |
RSA 125-C:11,
I-a; 42 U.S.C. §7661a(b)(6); 40 CFR §70.7(e)(2) |
|
Env-A
612.06 |
RSA
125-C:11, I-a; 42 U.S.C. §7661a(b)(6); 40 CFR §70.7(e)(4) |
|
Env-A 612.07 |
RSA 125-C:11, I;
42 U.S.C. §7661a(b)(6); 40 CFR §70.7(e) |
|
Env-A
613.01 - Env-A 613.03 |
RSA
125-C:13 |
|
Env-A
613.04 |
RSA
125-C:13; 40 CFR §70.7(f)(1)(iii) |
|
Env-A
614.01 |
RSA
125-C:6, XIV; 42 U.S.C. §7661d(b)(2); 40 CFR §70.8(d) |
|
Env-A
615.01 |
RSA
125-C:6, V & XIV; 42 U.S.C. §7410(a)(2)(d) |
|
Env-A 616.01 |
RSA 125-C:12, I |
|
Env-A
617.01 |
RSA
125-C:11, I |
|
Env-A
617.02 |
RSA
125-C:11, I-a; 42 U.S.C. §7661(2); 42 U.S.C. §7661a(a) |
|
Env-A
618.01 |
RSA
125-C:11, I; 42 U.S.C. §7502(c); 40 CFR §51.165 |
|
Env-A
618.02 |
RSA
125-C:11, IV; 42 U.S.C. §7502(c)(5); 40 CFR
§51.165(a)(2) |
|
Env-A
618.03 |
RSA
125-C:11, IV; 42 U.S.C. §7511a(c); 42 U.S.C. §7602; |
|
Env-A
618.04 |
RSA
125-C:11, IV; 42 U.S.C. §7503(a); 40 CFR §51.165(a)(2) |
|
Env-A
618.05 |
RSA
125-C:11, IV; 42 U.S.C. §7503(a); 40 CFR §51.165(a)(2) |
|
Env-A
618.06 |
RSA
125-C:11, IV; 42 U.S.C. §7503(a); 40 CFR §51.165(a)(2) |
|
Env-A
618.07, Env-A 618.08 |
RSA
125-C:11, IV; 42 U.S.C. §§7503(c) & 7511a(c)(10); |
|
Env-A
618.09 |
RSA
125-C:11, II & IV; RSA 125-C:12, II; 42 U.S.C. §§7503(c) &
7511a(c)(10); 40 CFR §51.165(a)(3) |
|
Env-A
618.10(a) |
RSA
125-C:11, II & IV |
|
Env-A
618.10(b) |
RSA
125-C:12, II |
|
Env-A
619.01, Env-A 619.02 |
RSA
125-C:4, I(d); RSA 125-C:6, XIV; RSA 125-C:11, IV; |
|
Env-A
619.03 |
RSA
125-C:4, I(d); RSA 125-C:6, XIV; RSA 125-C:11, IV; 42 U.S.C. §7410(a)(2)(C);
40 CFR § 51.166; 40 CFR 52.21 |
|
Env-A
619.04 |
RSA
125-C:4, I(d); RSA 125-C:6, XIV; RSA 125-C:11, IV; |
|
Env-A
619.05 |
RSA 125-C:4,
I(d); RSA 125-C:6, XIV; RSA 125-C:11, IV; |
|
Env-A
619.06(a) |
RSA
125-C:4, I(a); RSA 125-C:6, XV; 42 U.S.C. §7472; |
|
Env-A
619.06(b) |
RSA
125-C:4, I(a); RSA 125-C:6, XV; 42 U.S.C. §7472; |
|
Env-A
619.07 |
RSA
125-C4, I(j); 42 U.S.C. §7475(d); 40 CFR §52.21(g)(1) |
|
Env-A
619.08 |
RSA
125-C:4, I(a); RSA 125-C:6, XV; 42 U.S.C. §7473; |
|
Env-A
619.07 |
RSA
125-C4, I(j); 42 U.S.C. §7475(d); 40 CFR §52.21(g)(1) |
|
Env-A
620; Env-A 621 |
RSA
125-C:12, II |
|
Env-A
621.04 |
RSA
125-C:12, II; 40 CFR §51.166(q)(2)(iv) |
|
Env-A
622.01, Env-A 622.02 |
RSA
125-C:12, II; 42 U.S.C. §7661a(b)(6); 40 CFR §70.7(h) |
|
Env-A
622.03 |
RSA
125-C:12, II; 42 U.S.C. §7661d(a)(2); 40 CFR §70.8(b) |
|
Env-A
622.04(a) |
RSA
125-C:12, II; 42 U.S.C. §7661d(a)(1); 40 CFR §70.8(a) |
|
Env-A
622.04(b) |
RSA
125-C:12, II; 42 U.S.C. §7661d(b)(1); 40 CFR §70.8(c) |
|
Env-A
622.05 |
RSA
125-C:12, II; 42 U.S.C. §7661a(b)(6); 40 CFR §70.7(h) |
|
Env-A
622.06 |
RSA
125-C:12, II; 42 U.S.C. §7661b(e); 40 CFR §70.7(h) |
|
Env-A
622.07 |
RSA
125-C:12, II |
|
Env-A
622.08 |
RSA
125-C:12, II; 42 U.S.C. §7661a(b); 40 CFR 70.4(b) |
|
Env-A
622.09 |
RSA
125-C:12, III; 42 U.S.C. §7661a(b); 40 CFR 70.4(b) |
|
Env-A
623.01, Env-A 623.02 |
RSA
125-C:13, II & III |
|
Env-A
623.03 |
RSA
125-C:14 |
|
Env-A 624 |
RSA 125-C:4,
I(a); RSA 125-C:10-b, I(a) |
|
Env-A 625 |
RSA 125-C: 4,
I(a); 40 CFR 63 |
Appendix
C: Statutory Definitions Cited In Env-A 624.02
RSA 125-C:2:
“VI-a.
‘Dioxin’ means a group of chemical compounds that share certain similar
chemical structures and mode-of-action biological characteristics, including a
total of 17 dioxin-like compounds that are members of 2 closely related
families: chlorinated dibenzo-p-dioxins (CDDs) and chlorinated dibenzofurans
(CDFs).”
“IX-f.
‘Particulate matter’ means any material, including lead, but not
uncombined water, which is or has been suspended in air or other gases and
which exists in a finely divided form as a liquid or solid at standard
conditions.”
RSA 125-C:10-b, I:
“(a)
‘Best available control technology’ means an emission limitation based
on the maximum degree of reduction for each air contaminant that would be
emitted from any device that the department, on a case-by-case basis, taking
into account energy, environmental, public health, and economic impacts and
other costs, determines is achievable for such device through application of
production processes or available equipment, methods, systems, and techniques,
including fuel cleaning or treatment or innovative fuel combustion techniques
for control of such air contaminant.”
“(b)
‘Exempt fuel’ means coal, natural gas, landfill gas, digester or bio gas, untreated wood, virgin petroleum products, or any
mixture thereof.”
Appendix D: Form GSP-2
![]()
gsp-2 fORM
INTERNAL COMBUSTION ENGINES
EMERGENCY GENERATORS OR FIRE PUMP ENGINES
Air Resources Division/Permitting and
Environmental Health Bureau
RSA/Rule: RSA
125-C:12 and Env-A 600
& 1700
This GSP-2 form shall be completed for each internal
combustion engine that is requesting registration under the GSP Internal
Combustion Engines – Emergency Generators or Fire Pump Engines.
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
GSP-2 FORM INFORMATION INSTRUCTIONS
[1] Emergency
Engine, Emergency Generator, or Emergency Fire Pump
2 If exact date is unknown for Manufacture
Date or Install Date, you may use 01/01/year.
The exception is for calendar years 2006 and 2007, where a month and
year are required to determine rule applicability.
3 Horsepower (hp) or Kilowatts (kW)
4 Liquid
Fuels: 5 Heat Value:
Ultra Low Sulfur Diesel (ULSD) 137,000 Btu/gal
Diesel fuel 137,000
Btu/gal
#2 fuel oil 140,000
Btu/gal
Kerosene 135,000
Btu/gal
Other – Liquid Obtain from
Fuel Supplier
Gaseous Fuels: Heat
Value:
Natural Gas 1,020
Btu/cubic foot
Propane (LPG) 94,000
BTU/gal
Gasoline 130,000
Btu/gal
Other – Gaseous Obtain from Fuel
Supplier