CHAPTER En 1800 ADMINISTRATION OF NEW HAMPSHIRE ENERGY CONSERVATION CODE
PART En 1801 APPLICABILITY
En 1801.01 Purpose. En 1800 governs the procedures for submission
to the department and the department’s review of the residential energy code
compliance form for projects in municipalities that do not have an adopted code
enforcement mechanism in accordance with RSA 155-A:10-a.
Source. #14381, eff 9-22-25,
EXPIRES: 9-22-35
En 1801.02 Scope.
En 1800 shall apply to all new residential buildings and additions or
alterations to existing residential buildings pursuant to RSA 155-A.
Source. #14381, eff 9-22-25, EXPIRES: 9-22-35
PART En 1802 DEFINITIONS
En 1802.01 “Applicant” means the owner, or owner’s agent submitting an application
to the department for verification of design compliance with the energy code.
Source. #14381, eff 9-22-25, EXPIRES: 9-22-35
En 1802.02 “Application” means the “New Hampshire
Residential Energy Code Application” effective July 3, 2024 pursuant to RSA
155-A:10‑a found at https://mm.nh.gov/files/uploads/fmo/remote-docs/nh-energy-codes-form-iecc-2018.pdf
Source. #14381, eff 9-22-25, EXPIRES: 9-22-35
En 1802.03 “State building code review board” (BCRB)
means the state building code review board pursuant to RSA 155-A.
Source. #14381, eff 9-22-25, EXPIRES: 9-22-35
En 1802.04 “Department” means the New Hampshire
department of energy.
Source. #14381, eff 9-22-25, EXPIRES: 9-22-35
En 1802.05 “Energy code” means the “New Hampshire
building code” or “state building code” as defined by RSA 155-A:1, IV.
Source. #14381, eff 9-22-25, EXPIRES: 9-22-35
En 1802.06 “Residential building,” as referenced in RSA
155-A New Hampshire building code, means:
(a)
Any detached one- or 2-family dwelling;
(b)
Any other dwelling as defined and prescribed by the New Hampshire
building code.
Source. #14381, eff 9-22-25, EXPIRES: 9-22-35
PART En 1803 APPLICATION REQUIREMENTS
En 1803.01 Submission of
Applications.
(a)
Each applicant shall complete and submit an
application.
(b)
Each applicant shall include with each application for review of a
residential building for compliance with the energy code, the following:
(1) A completed, signed electronic copy of the
application available on the BCRB website; and
(2) A certification by the applicant, as follows:
“I
hereby certify that all the information contained in this application is true
and correct, and construction shall comply in all respects with the New
Hampshire Building Code.”
(c)
Applicants may submit applications to the department by electronic mail to energycodes@energy.nh.gov.
(d) For purposes of RSA 155-A:10-a, any
application submitted shall not be deemed complete until all components of the
application as required at En 1803.01(b) have been received by the
department. The failure of an applicant
to respond to an inquiry by the department within 10 business days of such
inquiry shall render the application rejected.
(e)
If an applicant makes a substantive revision to an application,
including but not limited to a revision to a design specification, after the
application has been submitted to the department, the applicant shall date and initial in ink or electronically the revision made to the
application.
(f)
The date of the submitted revision, as described in En 1803.01(e) above,
shall constitute a new receipt date for the application.
(g)
An owner of a residential building for which plans and specifications
have been approved by an architect or engineer pursuant to RSA 155-A shall
submit them to the department as prescribed by the BCRB.
Source. #14381, eff 9-22-25, EXPIRES: 9-22-35
PART En 1804 METHODS OF COMPLIANCE
En 1804.01 Energy Code
Compliance.
(a)
In accordance with RSA 155-A:10-a, applicants who intend to construct
new or alter existing residential buildings in municipalities without an
adopted code enforcement mechanism, shall submit a completed application to the
department on behalf of the BCRB for verification that the proposed applicable
project meets the energy code requirements.
(b)
An applicant shall demonstrate that a proposed residential building
subject to the requirements of the energy code meets or exceeds the minimum
construction standards of the energy code pursuant to RSA 155-A.
(c)
No project shall be considered approved pursuant to En 1800 and RSA
155-A without the issuance of a verification letter by the department.
Source. #14381, eff 9-22-25, EXPIRES: 9-22-35
En 1804.02 Department
Responsibilities. The department
shall review the application and shall:
(a)
Determine whether the applicant has demonstrated, pursuant to RSA 155-A,
that the design of the residential building complies with the energy code; and
(b)
If the department determines compliance with the energy code, the
department shall issue a verification letter to the municipality pursuant to
RSA 155-A:10-a with a copy to the applicant.
Source. #14381, eff 9-22-25, EXPIRES: 9-22-35
PART En 1805 REQUEST FOR RECONSIDERATION
En 1805.01 Process after
Department Denial of Application.
(a)
When the department denies an application, it shall notify the applicant
of its finding and the procedures outlined in En
1805.01.
(b)
Any applicant whose application has been initially denied by the
department may request an informal reconsideration conference with the
department within 30 days of the date of the department’s notice of denial.
(c)
The department shall hold an informal conference requested pursuant to
En 1805.01(b) above.
(d)
Following the informal conference referred to in En 1805.01(c) above,
the department shall:
(1) Issue a written decision which shall:
a. Affirm, reverse, or modify the decision on
the application; and
b. Summarize the results of the informal
conference and the basis for the decision; and
(2) Provide a copy of the written decision,
referred to in En 1805.01(d)(1) above, to the applicant.
(e) If, following the informal conference
referred to in En 1805.01(c) above, the department determines compliance with
the energy code, the department shall issue a verification letter to the
municipality pursuant to RSA 155-A:10-a with a copy to the applicant.
Source. #14381, eff 9-22-25, EXPIRES: 9-22-35