CHAPTER Env-Dw 1100 DRINKING WATER STATE REVOLVING LOAN FUND
PROGRAM
Statutory Authority:
RSA 486:14, I(a) & (c)
Revision Note #1:
Document #8702, effective 8-24-06, readopted with
amendments and renumbered former Parts Env-C 510 through Part Env-C 521, the
State Drinking Water Revolving Loan Fund Program, under a new subtitle as
Chapter Env-Dw 1100, with a revised heading “Drinking Water State Revolving
Loan Fund Program.” The redesignation
from subtitle Env-C to subtitle Env-Dw was done pursuant to a rules
reorganization plan for Department rules approved by the Director of the Office
of Legislative Services on 9-7-05.
Document #8702 replaces all prior filings for rules
formerly in Env-C 510 through Env-C 521.
The prior filings for rules in former Env-C 510 through Env-C 521
included the following documents:
#6620, INTERIM, eff 11-15-97, EXPIRES: 3-15-9
#6697, eff 2-25-98
#8575, INTERIM, eff 2-25-06, EXPIRED: 8-24-06
REVISION NOTE #2:
Document
#13160, effective 1-20-21, readopted with amendments Chapter Env-Dw 1100, which
included inserting new rules and extensively renumbering the existing
rules. Document #13160 replaces all
prior filings since Document #8702, which included only Document #10772,
effective 1-24-15.
PART
Env-Dw 1101 PURPOSE; APPLICABILITY; USE
OF STANDARD TERMS
Env-Dw 1101.01 Purpose. The purpose of this chapter is to implement
RSA 486:14 and 40 CFR Part 35, Subpart L, by establishing:
(a)
The procedures and criteria applicable to public water systems that
apply to the state for financial assistance from the drinking water state
revolving loan fund (DWSRF) established pursuant to RSA 486:14; and
(b)
The requirements for completing projects financed under the DWSRF,
complying with DWSRF program loan conditions, and repaying or otherwise
returning such assistance.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
PART
Env-Dw 1102 CHAPTER-SPECIFIC DEFINITIONS
Env-Dw 1102.01 “Administrative costs” means expenses
associated with managing DWSRF projects.
The term includes but is not limited to costs for engineering and other
consultants, environmental and technical reviews of proposed projects,
participation in state overview inspections, and accounting and disbursement
functions.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw
1102.04 “Application” means the written
document(s), with attachments, through which financial assistance is
requested. The term includes the
pre-application and the final application.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
(a)
Section 1452 of the federal Safe Drinking Water Act, codified as 42
U.S.C. §300j-12 (federal SDWA); or
(b)
Any other applicable federal initiative.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw 1102.13
“Department” means the department of environmental services.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw 1102.14
“Disbursement” means a transfer of funds from the DWSRF to a recipient.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw 1102.24
“Funding year” means the year that a project is funded from the DWSRF.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
(a)
Any state agency, board, or commission;
(b)
Any political subdivision of the state, including but not limited to a
county, city, town, or district; and
(c)
Any other public body created under state law.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw
1102.27 “Green project” means an
infrastructure project that:
(a) Uses natural systems in place of or to
supplement existing infrastructure or to protect or supplement water supply
sources; or
(b) Incorporates water- or energy-efficiency
improvements or other environmentally-protective measures.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw 1102.36
“Materially or significantly affect project design” means a change that
would:
(a)
Alter the project’s performance standards;
(b)
Alter the type of water treatment provided by the project;
(c)
Delay or accelerate the project schedule by more than 10%; or
(d)
Alter the design drawings and specifications, or the location, size,
capacity, or quality of any major part of the project, such that amended plans
and specifications are required under RSA 485:8 or the applicable sections of
Env-Dw 400.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw 1102.41 “Person” means “person” as defined in RSA
485:1-a, XIII, reprinted in Appendix B.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw 1102.49
“Recipient” means an applicant that receives financial assistance from
the DWSRF.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw 1102.52
“Resident project representative” means an individual who:
(a)
Is qualified by reason of education and experience to inspect
infrastructure projects; and
(b)
Reports to a licensed professional engineer when the project’s plan and
scope of work indicate supervision by an engineer is required.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw
1102.53 “Responsible bidder” means an
entity that:
(a)
Has the technical knowledge necessary to perform the contract;
(b)
Has adequate financial resources to perform the contract;
(c)
Is able to comply with the legal and regulatory requirements associated
with the contract;
(d)
Is able to deliver or otherwise perform according to the contract
schedule;
(e)
Has either a history of satisfactory performance or no history of
unsatisfactory performance;
(f)
Has a good reputation for integrity as generally known in the industry
or the community; and
(g)
Has or can obtain necessary data, equipment, and other resources to
perform the contract.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw
1102.54 “Scheduled completion date”
means the date stated in the original loan agreement or initial loan documents
on which the project that received DWSRF funds is intended to be placed into
use for the purposes for which it was intended.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw 1102.55 “Security” means real or personal property or
other collateral that is pledged by a non-governmental recipient to ensure
repayment of a loan to the state.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw 1102.56 “Significant adverse comments” means comments
that cause the department to conclude that the recommended action might not be
the alternative with the best balance between minimizing environmental impact
and maximizing benefit to the applicant’s project.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw 1102.57 “Source water protection (SWP)” means
protection of the source of drinking water by delineating the area to be
protected, acquiring undeveloped land or easements on such land in the
protection area, identifying land uses which may threaten its use for water
supply, managing or eliminating identified threats, and contingency planning.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw
1102.58 “State revolving fund (SRF)
attorney” means the attorney(s) under contract to the department for the
purpose of providing:
(a) Legal review of initial loan documents and
allonges; and
(b) Other legal services associated with
providing financial assistance to non-governmental entities.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw
1102.59 “State revolving fund (SRF)
financial advisor” means the individual or entity under contract to the
department for the purpose of assessing the financial risk of providing
financial assistance to non-governmental entities.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw
1102.60 “State” means the state of New
Hampshire.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw 1102.61 “State match” means funds equaling the
percentage of the capitalization grant that the federal SDWA requires the state
to deposit into the DWSRF.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw 1102.62 “Substantial completion” means that
construction of the project, or a discrete part thereof, is sufficiently
completed that the project or discrete part can be used for the purposes for
which it is intended.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw 1102.63 “Supplemental loan agreement” means an
amendment to the original loan agreement between the state and a governmental
recipient that stipulates the final project cost and applicable repayment
terms.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw 1102.64 “User charge” means a charge levied on users
of a water system for the user’s share of the cost of water system operation
and maintenance, plus any allocable portion of capital improvements.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw
1102.65 “Water system” means a public
water system as defined by RSA 485:1-a, XV, reprinted in Appendix B.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
PART Env-Dw 1103
ESTABLISHMENT OF DWSRF
Env-Dw 1103.01 Authority for Loan Fund. RSA 486:14, I(a) authorizes New Hampshire “to
participate in the federally funded state … drinking water revolving loan funds
or grants as may be provided under the … Safe Drinking Water Act, or related
federal legislation as amended from time to time. The loan funds shall be
administered by the commissioner of the department of environmental services
under rules adopted by the commissioner under the provisions of RSA 541-A.”
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
(a)
Capitalization grants as appropriated by the United States Congress;
(b)
The state match as appropriated by the general court, deposited to the
DWSRF on a schedule coinciding with the payment of federal funds into the
DWSRF;
(c)
Repayments of principal and interest by recipients;
(d)
Investment earnings credited to the assets of the DWSRF, which shall
become part of the total assets of the DWSRF; and
(e)
Any other funds as may be appropriated or available.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
PART Env-Dw 1104 ELIGIBILITY; PRE-APPLICATION REQUIREMENTS
Env-Dw 1104.01 Eligible Projects and Costs.
(a)
The following shall be eligible for financial assistance from the DWSRF:
(1) The categories of projects identified in 40
CFR § 35.3520(b), including but not limited to the following:
a. Installation, replacement, rehabilitation, or
enhancement of treatment facilities so as to meet MCLs or SMCLs;
b. Rehabilitation or replacement of distribution
systems and facilities;
c. Source development and rehabilitation;
d. Installation, rehabilitation, or enhancement
of storage facilities;
e. Interconnections between water systems owned
by eligible entities; and
f. Interconnections needed to consolidate water
supplies where a supply has become contaminated or a system is unable to
maintain compliance for technical, financial, or managerial reasons; and
(2) Any other projects authorized
by EPA, including but not limited to:
a. Meters and meter reading equipment;
b. Innovative environmental projects that
increase water use efficiency, reduce energy usage, or supplement existing
infrastructure; and
c. Non-traditional projects.
(b)
Eligible costs shall be as identified in 40 CFR §35.3520(c), subject to
the following:
(1) Eligible land acquisition costs shall be
limited to acquisition of an interest in land, whether in fee or by easement,
that is needed to complete the eligible project, the value of which shall be calculated
based on fair market value as determined by a certified appraisal; and
(2) Preparation of an asset management program,
including an asset maintenance and renewal plan, shall be eligible for
financial assistance from the DWSRF.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
(a)
Comply with applicable federal requirements;
(b)
Comply with applicable state design criteria as specified in Env-Dw 400;
(c)
For water supply treatment, distribution, or storage projects, meet
eligible design capacity as determined in accordance with the following:
(1) The eligible design capacity shall be based
on average daily flow and peak flows in accordance with population and per
capita flow figures;
(2) Eligible design capacity for treatment
facilities shall be based on a period of 20 years from the estimated date of
initiation of operation; and
(3) Eligible design capacity for water
distribution mains and intake or raw water mains shall be based on 40 years
from the estimated date of initiation of operation;
(d)
If a distribution system, consist of the common lines of the water
system that distribute water directly from source or treatment facilities; and
(e)
Meet any other requirements specified in the applicable capitalization
grant.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw 1104.03 Pre-Application
Procedures.
(a)
If requested by an entity that wants to apply for DWSRF funding, the
department shall meet with the entity’s representative(s) to provide
information, advice, instruction, guidance, and other information to help the
entity determine the scope of work needed to describe an eligible project and
complete the application process.
(b)
Any entity that wants to receive financial assistance from the DWSRF
shall file a pre-application by:
(1) Completing a pre-application as described in
Env-Dw 1104.04;
(2) Signing and certifying the pre-application as
described in Env-Dw 1104.05; and
(3) Submitting the completed, signed
pre-application:
a. Electronically, per the instructions in the
pre-application announcement that is available on the department’s website at www.des.nh.gov or
electronically to dwsrf@des.nh.gov; or
b. In writing, by US Postal Service mail,
private delivery service, or other in-hand delivery to:
NHDES Drinking
Water SRF Program
29 Hazen Drive
P.O. Box 95
Concord, NH
03302-0095
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw
1104.04 Pre-Application Information.
(a)
To be processed as provided in Env-Dw 1104.06(a), the applicant shall
provide the following information to the department on a “DWSRF Pre-Application
Form”, NHDES-W-03-217, found at https://onlineforms.nh.gov/?FormTag=NHDES-W-03-217:
(1) The water system’s name and PWS identifier;
(2) Whether the water system’s ownership is
public or private;
(3) The water system’s address, including city or
town, state, and zip code;
(4) The name, title, email address, and daytime
telephone number of the applicant’s point of contact (POC) for the
pre-application;
(5) A short title for the project and whether the
project is design and preliminary engineering only, design and construction, or
construction only;
(6) A concise description of the proposed
project, for example “replace water main on Elm Street” or “upgrade treatment
and storage system”;
(7) Whether the proposed project implements
recommendations from an asset management plan;
(8) The amount of loan requested;
(9) The loan term requested; and
(10) If the applicant uses a paper-based
pre-application, the name and title of the individual authorized by the
applicant to sign the pre-application on behalf of the applicant.
(b)
The applicant also shall provide to the department as much of the
following information as practicable:
(1) A concise description of the need for the
proposed project, including how it will address public health protection,
whether it includes any energy or water efficiency components, and whether any
alternatives have been considered;
(2) An estimate of total project costs, including
construction costs, a construction contingency, and estimated planning and
engineering costs, plus the amount and a description of any other costs;
(3) Whether there are other funding sources
contributing to the project and if so, the source, the amount, and whether the
funding has been secured;
(4) The current residential water rate per single
family home per year;
(5) The median household income of the population
served, which may be based on:
a. The results of an income survey done within
the prior 3 years;
b. Data from the American Community Survey,
available at http://www.census.gov/acs; or
c. Data available on the department’s website;
(6) The date the applicant received governing
body approval to borrow funds for the project or the date the applicant
anticipates receiving such approval; and
(7) The anticipated date that the:
a. Design will be started;
b. Construction contract will be awarded; and
c. Project will be completed.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw
1104.05 Pre-Application Signatures
and Certifications.
(a)
The applicant shall sign and date the pre-application as follows:
(1) If the applicant uses a paper-based
pre-application, the applicant’s authorized representative shall sign and date
the pre-application and print their name and title in the location indicated;
and
(2) If the applicant uses the electronic
pre-application, submitting the pre-application shall constitute the signature
and the date the submission is received by the department shall constitute the
date of the pre-application.
(b)
Submission of the pre-application, whether electronically or on paper,
shall constitute certification by the applicant that:
(1) The information provided is true, not
misleading, and as complete as practicable, to the knowledge and belief of the
applicant;
(2) The applicant understands that any department
determination that the applicant and the applicant’s project qualifies for
funding from the DWSRF that is based on false, incomplete, or misleading
information is subject to modification, up to and including reversal, through
an adjudicative proceeding conducted in accordance with applicable provisions
of Env-C 200; and
(3) The signer is subject to the penalties
specified in New Hampshire law for falsification in official matters, currently
RSA 641.
(c)
If the applicant’s authorized representative is, or is acting on behalf
of, a listed engineer as defined in Env-C 502.10, the signature also shall
constitute certification that the signer understands that the submittal of
false or misleading information is grounds for debarring the listed engineer
from the roster.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw 1104.06 Department
Processing of Pre-applications.
(a)
The department shall include the applicant’s project on the preliminary
project priority list (PPL) prepared pursuant to Env-Dw 1105.02 if:
(1) The pre-application contains sufficient
information for the department to determine the identity of the applicant and
the applicant’s POC, the nature and scope of the proposed project, and the term
and amount of funding likely to be needed;
(2) The applicant is an eligible entity; and
(3) The proposed project meets the criteria
specified in Env-Dw 1104.01 and Env-Dw 1104.02.
(b)
If the applicant’s project does not meet the criteria in (a), above, to
be placed on the preliminary PPL, the department shall notify the applicant of
the reason(s) why in writing within 14 days of making the determination.
(c)
In response to being notified that a project cannot be placed on the
preliminary PPL, an applicant that is an eligible entity may modify or
supplement any information and submit a new pre-application to the department
no later than the end of the public comment period established pursuant to
Env-Dw 1105.04(b)(2).
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
PART Env-Dw 1105
ESTABLISHING PRIORITY FOR FUNDING
Env-Dw 1105.01 Prioritization of Proposed Projects.
(a)
The department shall rank each project that is placed on the preliminary
project priority list (PPL) pursuant to Env-Dw 1104.06 according to the
priority system established in the applicable
IUP based on the following objectives:
(1) Achieving compliance with the federal SDWA;
(2) Furthering public health protection;
(3) Maintaining affordability for the water user;
and
(4) Achieving compliance with any applicable
requirements of the specific capitalization grant from which the funds are
provided.
(b)
If available funds are sufficient to fund all projects for which
pre-applications are accepted, the preliminary PPL shall contain the
information specified in Env-Dw 1105.02 for all projects for which pre-applications
have been accepted.
(c)
If available funds are not sufficient to fund all projects for which
pre-applications are accepted, the preliminary PPL shall contain:
(1) A fundable portion, consisting of those
eligible projects to which available funds have been assigned; and
(2) A contingency portion, consisting of those
eligible projects that will receive financial assistance if funds become
available.
(d)
If 2 or more projects on the list have equal points under the project
priority system, the project with the greatest existing population served shall
receive the higher ranking.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw 1105.02 Preliminary Project Priority List (PPL). The department shall prepare a preliminary
PPL by listing the eligible projects in order of their priority as established
pursuant to Env-Dw 1105.01, together with the following information for each
project on the list:
(a)
The name of the applicant;
(b)
The name and location of the applicant’s water system;
(c)
The short title for the project that was provided pursuant to Env-Dw
1104.04(a)(5);
(d)
The population served by the water system;
(e)
Whether the service area qualifies for disadvantaged community status,
considering its median household income if known at the time of submission of
the pre-application;
(f)
Project priority points in accordance with the priority system; and
(g)
The amount of financial assistance requested.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw 1105.03 Proposed
Intended Use Plan (IUP).
(a)
For each capitalization grant, the department shall prepare a proposed
IUP that complies with 40 CFR §35.3555, any DWSRF guidance issued by EPA, and
any requirements established in the applicable capitalization grant.
(b)
The proposed IUP shall include:
(1) The items required by 40 CFR §35.3555, as
reprinted in Appendix C;
(2) A description of any funding available for
non-traditional projects;
(3) A description of any funding options being
offered by or through the department in addition to those listed in Env-Dw
1107.01(a)(1)-(4); and
(4) An explanation of how interest rates that
comply with 42 U.S.C. 300j-12(f)(1)(A) will be established for funds provided
under the proposed IUP, including whether the interest rate will be subject to
adjustment in response to market conditions.
(c)
The proposed IUP shall be subject to public comment and review as
specified in Env-Dw 1105.04.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw 1105.04 Opportunity
to Comment; Final IUP, PPL.
(a) The department shall provide an opportunity
for applicants and the public to review and comment on the proposed IUP and the
preliminary PPL in accordance with this section.
(b) The department shall:
(1) Schedule a
non-adjudicative public hearing to receive comments on the proposed IUP and the
preliminary PPL;
(2) Establish a
deadline for receiving written public comments, which shall be not less than
5 non-holiday weekdays after the public hearing;
(3) At least 7
calendar days prior to the scheduled public hearing, send to each person that
filed a pre-application a notice of the hearing and deadline for public comment
together with a copy of, or a link to, the proposed IUP and the preliminary
PPL; and
(4) At least 7
calendar days prior to the date of the hearing, post on its website, www.des.nh.gov:
a. A notice
that the proposed IUP and preliminary PPL are available for review and comment,
together with the date, time, and place of the public hearing and the deadline
for submitting comments; and
b. A copy of
the proposed IUP and preliminary PPL.
(c)
The department shall:
(1) Conduct the public hearing in accordance with
the provisions of Env-C 200 that apply to non-adjudicative proceedings;
(2) Provide information about the proposed IUP
and the preliminary PPL; and
(3) Accept oral and written comments on the
documents.
(d) After the end of the public comment period,
the department shall consider all comments received and finalize the proposed
IUP and preliminary PPL by making such adjustments as are appropriate based on
the comments, including but not limited to revising the number of priority
points assigned to a project based on additional or revised information and
re-ordering the projects to account for the changed point totals.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw 1105.05 Allocation
of Funds.
(a)
After completing the process specified in Env-Dw 1105.03, the department
shall allocate the available funds starting with the highest priority project
on the PPL and proceeding down the PPL until all available funds have been
allocated. The projects for which
funding is initially available shall comprise the fundable portion of the
PPL. Any projects for which funding is
not initially available shall be listed in the contingency section of the PPL.
(b)
Within the limits of available funds, the department shall fund projects
over multiple years if project design and all phases of construction cannot be
accomplished within the timeframes established in the IUP prepared pursuant to
Env-Dw 1105.04. Subsequent portions of
such projects shall be listed in the funded portion of the following year’s
PPL, and in the funded portion for future years, as applicable.
(c)
The PPL that results from (a) and (b), above, shall:
(1) Become
effective and supersede all previous lists upon finalization of the IUP as
specified in Env-Dw 1105.04; and
(2) Remain in
effect until such time as it is superseded by a new list, subject to Env-Dw
1105.06.
(d)
The department shall notify each person who submitted a pre-application
of whether the person’s project is on the fundable or contingency portion of
the PPL. For those applicants whose
projects are on the fundable portion, the department shall provide instructions
for filing a final application as described in Env-Dw 1106.01.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw 1105.06 Management of the PPL.
(a)
A project on the fundable portion of the PPL shall be bypassed if the
project will not be ready to proceed during the funding year. Projects that have been bypassed shall be
placed in the contingency section and funded if the project is ready to proceed
when sufficient funds become available.
(b)
The department shall update the PPL as needed to reflect any necessary
changes, such as revised estimated construction assistance amounts and project
bypass.
(c)
If additional funds become available during the time period covered by
the IUP, the department shall extend the fundable portion of the PPL to include
as many of the projects in the contingency section of the PPL that are ready to
proceed as can be funded, in priority order.
(d)
The department shall remove a project from the PPL if any of the
following is true:
(1) The project is fully funded from other
sources;
(2) The project is found to be ineligible based
on information received by the department subsequent to the placement of the
project on the list;
(3) The applicant informs the department in
writing that it does not intend to pursue financial assistance from the DWSRF;
or
(4) The applicant loses its managerial or
financial capability to construct and implement the project.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
PART Env-Dw 1106
PROCEDURES FOR RECEIPT OF DWSRF FUNDS
Env-Dw
1106.01 Final Application
Requirements. An applicant whose
project is on the PPL who wishes to obtain funding shall submit to the
department the following:
(a)
The information required for a final application specified in Env-Dw
1106.03 on or with “Form 1: Final Application”, NHDES-W-03-064, December 2020,
available at https://onlineforms.nh.gov/?FormTag=NHDES-W-03-064;
(b)
Confirmation of the applicant’s authority to borrow as specified in
Env-Dw 1106.04;
(c)
Information regarding the environmental review required by Env-Dw 1108,
as specified in Env-Dw 1106.05;
(d)
A capacity assurance self-assessment as specified in Env-Dw 1106.06;
(e)
The bank information specified in Env-Dw 1106.07;
(f)
A planning document as specified in Env-Dw 1106.08; and
(g)
Verification of a revenue program as specified in Env-Dw 1106.09.
(a)
From the time of first application for financial assistance for a
project throughout all stages of construction and implementation, and at any
other time while any assistance from the DWSRF to the recipient is outstanding,
the recipient shall allow the department to inspect:
(1) The project and any and all incidental works,
areas, facilities, and premises otherwise pertaining to the project for which
application is made; and
(2) Any and all books, accounts, records,
contracts or other instruments, documents, and other information possessed by
the recipient or its contractors, agents, employees or representatives which
relate in any respect to the receipt, deposit, or expenditure of financial
assistance funds; and
(b)
After project completion, the recipient shall allow the department to
conduct periodic site visits to confirm that the project is functioning as
intended.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
(a)
The water system’s name and PWS identifier;
(b)
Whether the applicant is a governmental or non-governmental eligible
entity;
(c)
The water system’s mailing address, including street name and number or
post office box number, city or town, and zip code with 4-digit extension;
(d)
The name, title, email address, and daytime telephone number including
area code of the applicant’s contact for:
(1) Questions regarding the final application;
and
(2) Repayment billing;
(e)
A short title for the project;
(f)
The primary location where the work will be done;
(g)
A concise explanation of the need for the proposed project, including
how it will address public health protection, compliance with the federal SDWA,
whether it includes any energy or water efficiency components, and whether any
alternatives have been considered;
(h) An estimate of the following project costs:
(1) Estimated construction costs;
(2) A construction contingency of 10%;
(3) Estimated planning and engineering costs;
(4) The amount and a description of any other
costs; and
(5) The total estimated costs;
(i) The amount of the loan being requested;
(j)
The term requested based on Env-Wq 1107.04(c), table 1107-1;
(k)
The current residential water rate per single family home per year;
(l)
The tentative project schedule, including:
(1) The actual or anticipated date the applicant
was or will be authorized by its governing body to borrow funds for the
project;
(2) The actual or anticipated date the design was
or will be started;
(3) The anticipated date the construction
contract will be awarded; and
(4) The anticipated date the project will be
completed;
(m)
The applicant’s data universal numbering system (DUNS) number or, if the
applicant does not have a DUNS number, the DUNS number obtained by the
applicant from the Dun & Bradstreet (D&B) website at http://www.dnb.com/duns-number.html;
(n)
A state vendor code number obtained pursuant to the vendor code
requirements established by the New Hampshire department of administrative
services, currently Adm 603;
(o)
For a non-governmental applicant, whether the applicant received the
threshold amount or more in U.S. federal contracts, subcontracts, loans,
grants, subgrants, or cooperative agreements, or any combination thereof as
required for prime recipient executive compensation reporting in accordance
with Public Law 109-282, the Federal Funding Accountability and Transparency
Act of 2006 as amended;
(p)
The name and title of the individual authorized by the applicant to sign
the application on behalf of the applicant;
(q)
For governmental applicants, a letter signed by an authorized
representative stating whether or not the applicant has any debt outside the NH
Municipal Bond Bank and, if the debt is rated, the rating;
(r)
For non-governmental applicants, documentation of the extent of the
applicant’s existing debt; and
(s)
A copy of the applicant’s latest annual report or financial statements.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw
1106.04 Applicant’s Authority to
Borrow.
(a)
For a governmental applicant, the confirmation required by Env-Dw
1106.01(b) shall consist of proof that the applicant’s governing body passed or
approved a valid warrant article or resolution, as applicable, using “Form 2A:
Authority to Borrow - Publicly Owned Systems”, NHDES-W-03-023, January 2020,
available at https://onlineforms.nh.gov/?FormTag=NHDES-W-03-023, that:
(1) Authorizes the applicant to:
a. Raise, appropriate, and spend the amount of
funds to be requested for the identified project;
b. Apply for funding for the identified project;
and
c. Enter into a binding contract to repay all
funds received as a loan;
(2) Designates an individual, by title and name,
to be the applicant’s authorized representative for purposes of:
a. Signing and filing the application and
furnishing such information, data, and documents pertaining to the application
as required; and
b. If financial assistance is awarded,
furnishing such information, data, and documents pertaining to disbursements of
the funds;
(3) Identifies, by name and title, each
individual who is authorized to sign the original loan agreement and
supplemental loan agreement should funds be awarded; and
(4) Binds the applicant to operate and maintain
all facilities constructed or modified with the funds received in accordance
with all applicable requirements.
(b)
The proof required by (a), above, shall be in a written document that is
certified and sealed by the town clerk or equivalent.
(c)
For a non-governmental applicant, the confirmation required by Env-Dw
1106.01(b) shall consist of proof that the applicant’s governing body passed a
valid resolution, using “Form 2B: Authority to Borrow - Privately Owned
Systems”, NHDES-W-03-024, November 2020, available at https://onlineforms.nh.gov/?FormTag=NHDES-W-03-024, that:
(1) Authorizes the applicant to:
a. Apply for funding from the DWSRF for the
identified project;
b, Enter into a binding contract to repay all
funds received as a loan; and
c. Pledge security to the state to ensure such
repayment;
(2) Designates an individual, by title and name,
to be the applicant’s authorized representative for purposes of:
a. Signing and filing the application and
furnishing such information, data, and documents pertaining to the application
as required; and
b. If financial assistance is awarded,
furnishing such information, data, and documents pertaining to disbursements of
the funds;
(3) Includes any other approval actions required
to authorize borrowing of funds;
(4) Identifies, by name and title, each
individual who is authorized to enter into a loan agreement with the State of
New Hampshire and to authorize the granting of a security interest in the name
of the recipient for the purpose of securing the water system improvements loan
should funds be awarded; and
(5) Binds the applicant to operate and maintain
all facilities constructed or modified with the funds received in accordance
with all applicable requirements.
(d)
A non-governmental applicant shall submit with the proof required by
(b), above, copies of:
(1) The applicant’s bylaws or articles of
incorporation, or both, as applicable; and
(2) The approved minutes of the meeting at which
the resolution was approved.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw 1106.05 Report
of Environmental Review. The
information required by Env-Dw
1106.01(c) shall be as follows, submitted on or with “Form 3: Environmental
Review”, NHDES-W-03-058, December 2020, available at https://onlineforms.nh.gov/?FormTag=NHDES-W-03-058:
(a)
The water system’s name, mailing address, and PWS identifier;
(b)
The short title for the project and the project number assigned by the
department;
(c)
The name and title or position of the contact for the project, together
with an email address for the individual;
(d)
An introductory paragraph that reads as follows, with the water system’s
name filled in:
“The [PWS
Name] has applied for funds through the State of New Hampshire Department
of Environmental Services Drinking Water State Revolving Loan Fund (DWSRF), in
accordance with NH Code Admin. Rules Env-Dw 1100. This document fulfills the requirements of
Env-Dw 1106.01(c) relative to providing information on the environmental review
required by Env-Dw 1108.”
(e)
An overview of the applicant’s water system and its customers, including
the system’s source(s), capacity, number of service connections, and
approximate population served;
(f)
An explanation of the need and justification for the proposed project
and a description and analysis of all reasonable alternatives, including a “no
action” alternative, that the applicant considered during project planning;
(g)
A description of the scope of the proposed project, including
preconstruction work, and the following:
(1) Maximum area of disturbance in square feet or
acres, both temporary and permanent;
(2) How many trees are planned to be removed or
trimmed, if any, and when;
(3) Any potential culvert installations on
perennial streams or impacts to wetlands or surface waters; and
(4) If replacement or removal of any structures
is proposed, include the year the structure was built;
(h)
The estimated cost of the overall project;
(i) How much the applicant has applied to borrow
from the DWSRF;
(j)
A list of each document that is available for public review that
supplements the information provided pursuant to (e)-(g), above;
(k)
A summary of potential environmental impacts arising from the proposed
project relative to air emissions, noise, surface water, groundwater, wetlands,
shoreland, floodplains, plants and wildlife;
(l)
A summary of potential impacts on the community in terms of social and
economic aspects, recreation, historic sites, and indirect impacts;
(m)
The date the applicant’s governing body authorized funding for the
project or is expected to authorize such funding and the amount authorized;
(n)
A statement that the applicant agrees to publish a public notice to
initiate a comment period on the report;
(o)
An 8.5-inch by 11-inch copy of a topographic map at a scale that clearly
identifies the location of the project and maximum extent of disturbance;
(p)
Site plans with a scale bar indicating project location and maximum
extent of disturbance;
(q)
Any other supporting documentation such as shapefiles depicting the
project limits of disturbance, consultations or correspondence with other
natural resource agencies, environmental review documents prepared for other
funding agencies, natural resource surveys or investigations, and planning
documents;
(r)
Photographs of the proposed project area and any existing structures to
be replaced or renovated; and
(s)
An affirmation, if true, that the applicant has permission from the
landowner for the department to submit NH DNCR-natural heritage bureau “DataCheck” and division of historical resources “Request
for Project Review” for the proposed project.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw
1106.06 Capacity Assurance
Self-Assessment.
(a)
The capacity assurance self-assessment required by Env-Dw 1106.01(d)
shall consist of the following, provided using “Form 4: Capacity Assurance
Self-Assessment”, NDES-W-03-125, January 2020, available at https://onlineforms.nh.gov/?FormTag=NHDES-W-03-125:
(1) The name and PWS identifier of the applicant;
(2) The name, title, email address, and daytime
telephone number including area code of the individual who completed the
self-assessment; and
(3) Answers to the questions listed in (c)-(e),
below, or such other questions as may be required for the department to assess
capacity as listed in the applicable IUP.
(b)
The applicant shall:
(1) Answer yes, no, not applicable, or don’t know
to each question; and
(2) Provide any supplemental information
requested.
(c)
The questions relating to technical capacity shall be whether the
applicant:
(1) Has record drawings or plans of its
distribution system;
(2) Has a list of assets such as pumps, wells,
tanks, and water mains, and if so whether the list is complete or only partial;
(3) Has a sufficient quantity of water to meet
peak water demands;
(4) If the area in which the water system is
located has experienced drought conditions, whether the system experienced
insufficient water quality during the drought;
(5) Has a means to record daily water volume and
to obtain discrete water samples from each source;
(6) Conducts water audits to determine the volume
of unaccounted-for water;
(7) Has had, in the past year, any monitoring or
reporting violations at its drinking water system;
(8) And its operators, equipment, and
infrastructure are safe from electrical, chemical, falling, or other physical
hazards;
(9) Has an operations and maintenance manual for
its drinking water system; and
(10) Flushes the distribution system piping at
least annually;
(d)
The questions relating to managerial capacity shall be whether the
applicant:
(1) Has a current organizational chart
identifying system management and operations staff;
(2) Has a written master plan or asset management
plan for long range planning;
(3) Logs or otherwise tracks and addresses
customer questions or complaints;
(4) Engages in general public education beyond
consumer confidence reports;
(5) Has explicit rules and standards for
customer-driven system modifications;
(6) Updates and practices its emergency response
plan;
(7) Has a system for scheduling routine
preventive maintenance; and
(8) Obtains any regular or occasional technical
assistance from outside sources such as a consulting engineer, other regulated
utilities, or organizations specifically dedicated to providing technical
assistance.
(e)
The questions relating to financial capacity shall be whether the
applicant:
(1) Reviews its water rates annually;
(2) Has a water rate that is greater than one
percent of the community’s median household income;
(3) Prepares a written annual budget with water
system expenses and revenues;
(4) Has a capital improvement plan (CIP);
(5) Funds a capital reserve account based on
life-cycle cost; and
(6) Currently operates on a break-even basis or
better.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
(a)
The name of the recipient;
(b)
The project number from the PPL;
(c)
The name, title, daytime telephone and fax numbers including area code,
and email address of the individual who will be the contact for billing and
notifications of fund transfers;
(d)
The name, title, daytime telephone and fax numbers including area code,
and email address of the individual who will be the contact for audits;
(e)
The name, mailing address, and main telephone number including area code
of the recipient’s financial institution;
(f)
The name, title, daytime telephone and fax numbers including area code,
and email address of the recipient’s point of contact at the financial
institution;
(g)
The recipient’s financial institution’s ABA routing number for ACH
transactions;
(h)
The name on the account and the type of account, for example checking or
savings; and
(i) The account number.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
(a)
Identification of the planning area boundaries and characteristics and
the existing needs related to the water system;
(b)
A cost-benefit analysis of feasible water systems or conveyance
alternatives capable of meeting state and federal requirements, which details
all monetary costs including the present worth or equivalent annual value of
all capital costs and operation;
(c)
All information necessary for the design of the proposed project and
alternatives;
(d)
The most current estimate of project cost itemized as to major
facilities or items including land and easement costs, fees for engineering
services, fees for legal services, fees for financial services, contingencies,
and interest during construction;
(e)
A statement of the legal, institutional, managerial, and financial
capacity to construct, operate, and maintain the water system as specified in
Env-Dw 601; and
(f)
A statement that the applicant has a program in place for funding the
maintenance and eventual replacement of the funded asset, or, if there is no
such program in place, a plan for developing an asset maintenance and renewal
plan as part of the funded infrastructure project.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw
1106.09 Establishment and
Verification of Revenue Program.
(a) The applicant shall establish:
(1) A schedule
of user charges that is designed to generate sufficient revenues to cover
operation and maintenance expenses as well as any allocable portion of capital
improvements; and
(2) A dedicated
source or sources of revenue to repay the loan.
(b) For purposes of (a)(2), above, a revenue
source shall be considered dedicated when the recipient passes or adopts an
ordinance or other binding resolution committing the source of funds for
repayment to the DWSRF.
(c) The applicant’s ordinance or other binding
resolution dedicating a source of funding for repayment of the loan shall be in
effect and binding on the applicant prior to the loan agreement taking effect.
(d) For an applicant that is a governmental
entity, the verification required by Env-Dw 1106.01(g) shall be made using
“Form 5A: Financial Certification for Publicly-Owned Systems”, NHDES-W-03-182,
January 2020, available at https://onlineforms.nh.gov/?FormTag=NHDES-W-03-182, by:
(1) Identifying
the source of repayment;
(2) Stating
whether or not the applicant has existing debt outside the New Hampshire
municipal bond bank and, if so, the amount of the debt and whether the debt is
rated and, if the debt is rated, the rating; and
(3) Certifying
that:
a. The
applicant has the financial capability to support both the project loan
repayment and continuing operation and maintenance of its water system; and
b. The
applicant will conduct and report on a financial audit, including compliance
and controls, in any fiscal year that it receives federal funds in excess of
the threshold amount set under the federal Single Audit Act in OMB Circular
A-133 or successor document; and
(e) For an
applicant that is a non-governmental entity, the verification required
by Env-Dw 1106.01(g) shall be made using “Form 5B: Financial Certification for
Privately Owned Systems”, NHDES-W-03-183, January 2020, available at https://onlineforms.nh.gov/?FormTag=NHDES-W-03-183, by:
(1) Identifying
the source of repayment; and
(2) Certifying
that:
a. The
applicant has the financial capability to support both the project loan
repayment and continuing operation and maintenance of its water system; and
b. The
applicant will conduct and report on a financial audit, including compliance
and controls, in any fiscal year that it receives federal funds in excess of
the threshold amount set under the federal Single Audit Act in OMB Circular
A-133 or successor document; and
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw 1106.10 Signatures and Certifications for Final
Applications.
(a) The applicant’s authorized representative
shall sign and date the final application as follows:
(1) If the
applicant uses a paper-based application, the authorized representative shall
sign and date the application and print their name and title in the location
indicated; and
(2) If the
applicant uses the web-based application, submitting the application shall
constitute the signature and the date the submission is received by the
department shall constitute the date of the application.
(b) Submission of the application, whether
electronically or on paper, shall constitute certification by the signer that:
(1) The signer
has been duly authorized by the applicant to sign the application;
(2) The
information provided is true, complete, and not misleading to the knowledge and
belief of the signer;
(3) The
applicant understands that any department determination that the applicant and
the applicant’s project qualifies for funding from the DWSRF that is based on
false, incomplete, or misleading information is subject to modification, up to
and including reversal, through an adjudicative proceeding conducted in
accordance with applicable provisions of Env-C 200; and
(4) The
applicant and the signer are subject to the penalties specified in New
Hampshire law for falsification in official matters, currently RSA 641.
(c) If the applicant’s authorized representative
is, or is acting on behalf of, a listed engineer as defined in Env-C 502.10,
the signature also shall constitute certification that the signer understands
that the submittal of false or misleading information is grounds for debarring
the listed engineer from the roster.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw 1106.11 Final
Application Processing.
(a) The department shall determine that the
application is complete and all or a portion of the proposed project is
eligible for financial assistance from the DWSRF if:
(1) All or a
portion of the proposed project is within the scope of eligible projects
identified in Env-Dw 1104;
(2) The
applicant has submitted all information and documents required by Env-Dw
1106.01; and
(3) The
applicant has signed the application as required by Env-Dw 1106.10.
(b) The department shall notify the applicant in
writing:
(1) If the
application is incomplete; and
(2) Of its
eligibility determination.
(c) If the department determines that the
applicant’s project is not eligible, the notice sent pursuant to (b), above,
shall specify the reason(s) for the determination and inform the applicant that
the department will reconsider the determination if the applicant submits
modified or supplemental information within 30 days of the date of the notice.
(d) If the applicant wants the department to
reconsider its determination that a project is ineligible, the applicant shall
submit modified or supplemental information within 30 days of the date of the
notice and request the department to reconsider its decision in light of the
new information.
(e) Upon receipt of a request to reconsider in
light of new information, the department shall review the information and make
a decision in accordance with (a) through (c), above, except that no further
reconsideration shall be undertaken.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
PART Env-Dw 1107
FINANCIAL ASSISTANCE; PAYMENTS; ACCOUNTING
Env-Dw
1107.01 Types of Assistance and
Related Conditions.
(a) Financial assistance shall be in one of the
formats authorized by 40 CFR §3525, an alternate format described in a specific
IUP as authorized by a specific capitalization grant, or any other format
authorized by EPA, only if:
(1) The
applicant is the legal owner of the water system;
(2) The water
system for which the project is proposed is on the state inventory of water
systems;
(3) The
proposed project is listed on the current project priority list; and
(4) If
applicable, the project has approved plans and specifications and a
construction approval issued by the department.
(b) Loans shall be made only with the following
conditions:
(1) A loan
shall have a term not to exceed the maximum number of years allowed by 40 CFR §
3525 or the applicable capitalization grant;
(2) Principal
and interest payments shall commence within one year of project completion, in
accordance with RSA 486:14, III and 40 CFR §35.3525;
(3) The
recipient shall establish a dedicated source of revenue for repayment of the
loan in accordance with Env-Dw 1106.06; and
(4) The
recipient shall develop and implement an asset maintenance and renewal plan for
any DWSRF-funded infrastructure project using “Form 6: Asset Management
Maintenance and Renewal Plan”, NHDES-W-03-185, available at https://onlineforms.nh.gov/?FormTag=NHDES-W-03-185, dated November 9, 2020.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw
1107.02 Original Loan Agreements
(OLAs) for Governmental Entities.
(a) Following acceptance of an application from a
governmental entity and upon determining that funds are available,
the department shall prepare an original loan agreement (OLA) that contains the
following provisions:
(1) The loan
amount;
(2) The
interest rate for the loan;
(3) The length
of the repayment term;
(4) A
description of the project;
(5)
Authorization for representatives of the department and applicable
federal agencies to examine any of the loan recipient’s records that pertain to
transactions relating to the loan agreement, construction contracts,
engineering contracts, or other consulting contracts for the purpose of
inspection, audit, and copying during normal business hours;
(6) A
requirement for the recipient to develop and adhere to an asset maintenance and
renewal plan for the funded improvements; and
(7) Any other
provision(s) required by state or federal law in order for the agreement to be
valid.
(b) The department shall transmit the OLA to the
recipient for review. If the recipient
agrees with the terms, the recipient shall sign and date the OLA and return the
signed OLA to the department.
(c) Upon receipt of a signed OLA, the department
shall sign the OLA and submit the OLA to the governor and executive council
(G&C) for approval.
(d) If approved by the G&C, then:
(1) The OLA
shall be effective upon approval by the G&C; and
(2) The
department shall send a copy of the approved OLA to the recipient.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw
1107.03 Initial Loan Documents (ILDs)
for Non-Governmental Entities.
(a) Following acceptance of an application from a
non-governmental entity and upon determining that funds are available,
the department shall send the applicant’s financial information to the SRF
financial advisor for review.
(b) If the department determines, based on the
assessment provided by the SRF financial advisor, that lending money to the
applicant would not pose an unreasonable risk of loss due to non-repayment of
funds provided to the applicant, the department shall prepare the initial loan
documents (ILD) that contain the following provisions:
(1) The loan
amount;
(2) The
interest rate for the loan;
(3) The length
of the repayment term;
(4) A
description of the project;
(5)
Authorization for representatives of the department and applicable
federal agencies to examine any of the loan recipient’s records that pertain to
transactions relating to the loan agreement, construction contracts, or
engineering contracts for the purpose of inspection, audit, and copying during
normal business hours;
(6) A
requirement for the recipient to develop and adhere to an asset maintenance and
renewal plan for the funded improvements;
(7) Security
for the loan; and
(8) Any other
provision(s) required by state or federal law in order for the agreement to be
valid.
(c) The department shall send the drafted ILD to
the SRF attorney and to the applicant for review and comment.
(d) If the applicant agrees to the terms of the
ILD and the SRF attorney does not identify issues that could cause the ILD to
not be enforceable, the department shall submit the unsigned ILD to the G&C
for approval.
(e) If the G&C approves the ILD, the
department and the recipient shall schedule a loan closing for a
mutually-acceptable date and time.
(f) The recipient shall bring the following
documents to the closing:
(1) Proof of
authority to enter into contracts in New Hampshire, such as a certificate of
good standing from the New Hampshire secretary of state’s office that is valid
on the date of the loan closing;
(2) If the
recipient was formed under the laws of a jurisdiction other than New Hampshire,
a certificate of good standing from the state of incorporation or other
registration that is valid as of the date of the loan closing; and
(3) Any
additional documents identified by the SRF attorney and identified in the loan
closing agenda.
(g) After the recipient signs the ILD, the
department shall:
(1) Sign the
ILD; and
(2) Provide a
copy of the signed ILD to the recipient, the SRF financial advisor, and the SRF
attorney.
(h) The ILD shall be
effective upon signing by the recipient and the department.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw 1107.04 Interest
Rates Established.
(a)
The interest rate charged on the outstanding balance of disbursed funds
prior to the scheduled completion date or substantial completion date shall be
equal to 1.0 % annually.
(b)
The interest rate charged on the outstanding balance of disbursed funds
after the date of scheduled completion or substantial completion, whichever is
earlier, shall be based on the repayment period selected by the applicant and
the interest rate established in the applicable IUP (IUP rate) that is in
effect at the time the loan agreement is transmitted to the loan recipient
pursuant to Env-Dw 1107.02(b) or Env-Dw 1107.03(c), as applicable, as shown in
(c), below.
(c)
Unless otherwise specified in the applicable IUP, and subject to
adjustment pursuant to Env-Dw 1107.11, the interest rate based on the repayment
period selected by the applicant shall be as shown in table 1107-1, below:
Table 1107-1:
Interest Rate Based On Repayment Period Selected by Applicant
|
Repayment Period Selected |
Interest Rate |
|
5 years |
25% of IUP rate |
|
10 years |
50% of IUP rate |
|
15 years |
75% of IUP rate |
|
20 years |
80% of IUP rate |
|
More than 20 years, if available under the specific
capitalization grant from which the funds are loaned |
Calculated as specified in the |
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw 1107.05 Accrual
of Interest Charges; Administrative Fee.
(a)
Interest on any loan funds disbursed to the recipient shall begin to
accrue on the date of each disbursement of such funds by the state.
(b)
The recipient shall pay interest charges incurred on disbursed funds by
choosing to pay:
(1) Prior to the commencement of the loan
repayment;
(2) At the time of the first repayment;
(3) By adding the accrued interest to the
outstanding principal balance, provided the resulting balance does not exceed
the amount of the approved loan; or
(4) A combination of (1) through (3), above.
(c)
The interest rate during loan repayment shall be fixed over the loan
repayment period.
(d)
As required by RSA 486:14, I(b), the department shall set aside as an
administrative fee a sum equal to 2% of all loan principal balances outstanding
each year. For any loan for which the
interest rate is less than 2%, the administrative fee shall equal the interest
rate.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw 1107.06 Timely
Use of Funds.
(a) A recipient shall begin to expend funds
within 6 months of the effective date of the original loan agreement or initial
loan documents, as applicable.
(b)
If a recipient fails to comply with (a), above, the department shall
request the recipient to show cause why the loan should not be cancelled.
(c) The department’s request shall:
(1) Be in writing;
(2) Specify a date by which the recipient must
respond to the request, which shall be not less than 20 working days from the
date of the notice; and
(3) Inform the recipient that the recipient may
request an adjudicative hearing prior to the loan being cancelled.
(d)
If the recipient wishes to have an adjudicative hearing, the recipient
shall:
(1) Respond in writing to the request sent by the
department pursuant to (b), above; and
(2) Include a request for a hearing in the
response.
(e)
If the recipient requests an adjudicative hearing and a settlement is
not reached, the hearing shall be conducted in accordance with the provisions
of Env-C 200 that apply to such hearings.
(f)
If the recipient shows that the delay in expending the funds was based
on an excusable delay, the department shall not cancel the loan.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
(a)
To obtain a disbursement for eligible work and equipment from the
awarded funds, the recipient shall submit a written disbursement request to the
department by mail, email, or fax using “Request for DWSRF Disbursement”,
NHDES-W-03-206, November 2020, available at https://onlineforms.nh.gov/?FormTag=NHDES-W-03-206.
(b) The written request shall include the
following, as applicable to the request:
(1) The name and mailing address of the loan
recipient;
(2) The DWSRF project number;
(3) Loan amount;
(4) Disbursement request number;
(5) Whether the request is partial or final;
(6) The time period covered by the request;
(7) The amount of SRF eligible costs for each
category;
(8) The amount of the previous request for each
category;
(9) The amounts for the current request for each
category;
(10) The total of each category covered by
(7)-(9), above;
(11) The percent of the loan previously disbursed;
(12) The total percent of loan disbursed including
the current request;
(13) The name, title and signature of the
authorized representative and the date the request was signed;
(14) A summary list of the submitted invoices and
construction payment requisitions, including invoice number, date, amount, and
costs, separated into applicable classifications;
(15) Invoices for equipment and materials
delivered and properly stored;
(16) Invoices for engineering or consulting
services;
(17) Payment requisitions from the contractor(s);
and
(18) Invoices for eligible work not covered under
(15) through (17), above.
(c)
The representative of the recipient who is authorized to submit the
disbursement request shall sign the request, which shall constitute
certification that:
(1) The project costs incurred as indicated in
the request are in accordance with this chapter and the loan agreement for the
project, to the best of the signer’s knowledge and belief;
(2) The disbursement requested represents the
DWSRF share due which has not been previously requested; and
(3) A thorough owner’s inspection has been
performed and all work for which a disbursement is being requested has been
performed satisfactorily.
(d)
The department shall approve the request if it determines that the costs
covered by the request are eligible under Env-Dw 1104.01 and the recipient’s
financial assistance agreement.
(e)
Upon approval of the request, the department shall authorize the
disbursement to be made from the DWSRF, subject to Env-Dw 1107.08.
(f)
The recipient shall not make disbursement requests more frequently than
once per calendar month per loan.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
(a)
Approved project plans and specifications, if applicable;
(b)
Compliance with best available technology where applicable for primary
and secondary contaminants;
(c)
Compliance with 40 CFR §35.3575;
(d)
Agreement to maintain project financial accounts in accordance with
Env-Dw 1107.15 and to maintain project accounts as separate accounts; and
(e)
Agreement to provide notice of initiation of operation to the department
upon beginning operation of the project, if applicable.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw
1107.09 Supplemental Loan Agreement.
(a) Upon completion of a project by a
governmental recipient, the department shall:
(1)
Prepare a supplemental loan agreement (SLA) to reflect actual project
expenditures and to establish:
a. The
loan term selected by the recipient and the corresponding interest rate; and
b. The
loan repayment schedule based on the final project cost; and
(2)
Transmit the SLA to the recipient, who shall review and sign it.
(b) Upon receipt of an
signed SLA, the department shall sign the SLA and send a copy thereof to the
recipient.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw
1107.10 Allonge.
(a) Upon completion of a project by a
non-governmental recipient, the department shall:
(1)
Prepare an allonge to reflect actual project expenditures and to
establish:
a. The
loan term selected by the recipient and the corresponding interest rate; and
b. The
loan repayment schedule based on the final project cost; and
(2)
Transmit the allonge to:
a. The
SRF attorney for review; and
b. The
recipient, who shall review and sign it.
(b) Upon receipt of a signed allonge, the
department shall sign the allonge and send a copy thereof to the recipient.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw
1107.11 Adjustment to Stipulated
Interest Rate. If the applicable IUP
provides that interest rates are subject to adjustment, then prior to
establishing the final repayment schedule in the SLA or allonge, as applicable,
the department shall:
(a) Compare the IUP interest rate
stipulated in the OLA or ILD, as applicable, with the rate at the time the SLA or Allonge
is prepared; and
(b) Adjust the interest rate to be the lower of:
(1) The
interest rate stipulated in the OLA or ILD; or
(2) The
interest rate at the time the SLA or allonge is prepared.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw
1107.12 Loan Repayment.
(a)
Subject to (c), below, the recipient shall repay all funds received and
interest accrued thereon to the department as stipulated in the SLA or allonge,
as applicable.
(b)
The department shall deposit all funds that are repaid under this
chapter to be credited directly to the DWSRF.
(c)
A disadvantaged community that has received a loan subsidy as provided
in 40 CFR 35.3525 shall repay only such funds and interest remaining, if any,
after the subsidy is applied.
(d)
Repayment shall:
(1) Not exceed the loan term established in the
SLA or allonge;
(2) For governmental recipients, begin by:
a. For infrastructure projects, the earlier of
one year following substantial completion of the project or one year following
the scheduled completion date as stated in the OLA; or
b. For source water protection projects, one
year following project completion; and
(3) For non-governmental recipients:
a. Commence interest-only payments by 6 months
following:
1. For infrastructure projects, the earlier of
substantial completion of the project or the scheduled completion date as
stated in the ILD; and
2. For SWP projects, project completion; and
b. Commence principal and interest repayments by
one year following:
1. For infrastructure projects, the earlier of
substantial completion of the project or the scheduled completion date as
stated in the ILD; and
2. For SWP projects, project completion; and
(e)
The loan shall be amortized on an annual basis for governmental entities
and on a monthly basis for non-governmental entities.
(f) Should excusable delay be incurred beyond the
scheduled completion date, the department shall:
(1) Offer to modify the SLA or allonge, as
applicable, to account for the delays; and
(2) If the recipient so requests, negotiate an
appropriate modification of the SLA or allonge, as applicable.
(g)
Any recipient may repay a loan, in whole or in part, prior to the date
stipulated in the SLA or allonge, as applicable, with no prepayment penalty.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw
1107.13 Use of Funds; Return of Funds.
(a)
The recipient shall use and expend financial assistance provided from
the DWSRF solely and exclusively for the payment of authorized eligible costs
of the project for which the financial assistance was approved.
(b) If the recipient uses any funds provided from
the DWSRF for anything other than eligible costs on the specific project for
which such funds were furnished, the recipient shall return or otherwise repay
to the department all such funds.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw 1107.14 Retainage.
(a)
The recipient may withhold a percentage of all partial payments as
retainage until the project is complete.
(b)
If the recipient intends to withhold a retainage, the recipient shall
specify the terms and conditions relating to the retainage in the contract
documents submitted pursuant to Env-Dw 1109.03.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw
1107.15 Accounting. Each recipient shall:
(a)
Use the accounting, audit, and fiscal procedures required by 40 CFR
35.3550(i) for the project;
(b)
Place all funds received from the DWSRF in a project account for the
sole purpose of planning, designing, and constructing or implementing the
project as approved by the department;
(c)
Use all funds received from the DWSRF for the sole purpose of planning,
designing, and constructing or implementing the project as approved by the
department;
(d)
Provide an audit prepared by a certified public accountant or licensed
public accountant to the department:
(1) Annually, if the recipient expends more than
the threshold set under the federal Single Audit Act in OMB Circular A-133 or
successor document; or
(2) In response to a department request for an
audit based on a reasonable suspicion of fraud or misuse of SRF funds;
(e)
Maintain insurance coverage on the project in an amount adequate to
protect the state’s investment, as determined based on the nature of the
project and the amount of funding provided from the DWSRF in consultation with
the department;
(f)
Comply with any special conditions specified by the department’s
environmental determination until all financial obligations to the state have
been discharged; and
(g)
Continually abide by the terms of the financial assistance agreement,
the department’s rules, and relevant state and federal statutes for operation
and maintenance of the facility.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
PART Env-Dw 1108 ENVIRONMENTAL REVIEW
Env-Dw
1108.01 Environmental Review Required. Any construction project for which financial
assistance from the DWSRF is requested shall be reviewed for impacts on the
human and natural environment in accordance with this part.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw 1108.02 General
Procedure.
(a)
The department shall prepare an environmental review report for the
applicant’s proposed project based on the information submitted by the
applicant pursuant to Env-Dw 1106.05.
(b)
The environmental review shall result in one of the following:
(1) A categorical exclusion (CE);
(2) A finding of no significant impact (FONSI);
or
(3) A requirement for the applicant to prepare an
environmental impact statement (EIS).
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw 1108.03 Categorical
Exclusion (CE) Review.
(a)
The department shall review the proposed project to determine whether
the project qualifies for a CE.
(b)
A CE determination shall be made if the project comprises only:
(1) Work on existing facilities where no new
disruption of the environment will occur, such as correction of leakage,
replacement of pipes in existing rights of way, or replacement or addition of
equipment or small new structures on the site of an existing facility;
(2) Work where only a small disturbance is
required, such as to install hydrants on existing water mains; or
(3) Acquisition of land that is needed to
complete an eligible project where no infrastructure will be constructed.
(c)
If the department determines that the project qualifies for a CE, the
department shall:
(1) Prepare a review document describing the
basis for its determination; and
(2) Publish a notice on its website that contains
the following:
a. The name, mailing address, and daytime
telephone number including area code of the individual representing the
applicant who can answer questions regarding the proposed project;
b. A link to an on-line copy of the CE
determination;
c. The name, mailing address, daytime telephone
number including area code, and e-mail address of the individual at the
department to whom comments should be directed; and
d. The deadline for submitting comments, which
shall be no sooner than 10 calendar days from the date on which the notice is
published.
(d)
At the close of the review and comment period, the department shall make
a final determination in accordance with the following:
(1) If no significant adverse comments are
received, the department shall issue a CE as the final action; or
(2) If significant adverse comments are received,
the department shall prepare an EA in accordance with Env-Dw 1108.04.
(e)
The department shall send its final determination in writing to the
applicant and to any other person who requested during the public comment
period to receive a copy.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw 1108.04 Draft
Environmental Assessment (EA).
(a)
For projects that do not qualify for a CE, the department shall prepare
a draft EA in accordance with this section.
(b)
The draft EA shall contain the following information:
(1) The purpose of and need for the proposed
project;
(2) A list of all environmental concerns raised
by the proposed project;
(3) A list of alternatives to the proposed
project, including a no-action alternative;
(4) Details of the recommended action, which
shall be the proposed project or an alternative identified in the planning
document prepared pursuant to Env-Dw 1106.08 that:
a. Is most likely to ensure compliance with the
federal and state safe drinking water acts over the projected life of the
funded project; and
b. Best meets the purposes of 40 CFR Part 35,
Subpart L; and
(5) Mitigation
measures required for the recommended action, if any.
(c)
The department shall forward the draft EA to the applicant to distribute
for review and comment in accordance with Env-Dw 1108.05.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw
1108.05 Public Notification and
Review Period.
(a)
Following the receipt of a draft EA from the department, the applicant
shall:
(1) Prepare a notice that contains the following:
a. A link to an on-line copy of the draft EA;
b. The name, mailing address, and daytime
telephone number including area code of the individual representing the
applicant who can answer questions regarding the proposed project;
c. The name, mailing address, daytime telephone
number including area code, and e-mail address of the individual at the
department to whom comments should be directed; and
d. The deadline for submitting comments, which
shall be no sooner than 30 calendar days from the last date on which the notice
is published; and
(2) Send an electronic copy of the notice and
draft EA to:
a. The department;
b. The local governing body of the municipality
in which the project is proposed to be located, unless the applicant is that
municipality; and
c. The conservation commission in the
municipality in which the project is proposed to be located.
(b)
The applicant shall publish the notice for not less than one day in a
daily newspaper of general circulation in the project’s community and on the
applicant’s website, if any.
(c)
The department shall post the notice received from the applicant on its
website, www.des.nh.gov.
(d)
No formal action shall be taken by the department during the public
review period.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw 1108.06 Department
Decision.
(a)
At the close of the review and comment period for a draft EA, the
department shall make a determination in accordance with the following:
(1) If no significant adverse comments are
received, the department shall issue a FONSI as the final action; or
(2) If significant adverse comments are received,
the department shall direct the applicant to convene a public information
meeting as follows:
a. If the applicant is an agency of the state,
the meeting shall be convened as a non-adjudicative proceeding in accordance
with the agency’s rules;
b. If the applicant is a political subdivision
of the state, the meeting shall be convened in accordance with RSA 91-A and any
other applicable local requirements; and
c. If the applicant is other than a state agency
or a political subdivision of the state, the meeting shall be convened in
accordance with the applicant’s by-laws or, if the by-laws do not contain
procedures for public hearings, in accordance with the procedures for
non-adjudicative hearings as specified in Env-C 200.
(b)
Within 60 calendar days of the public information meeting conducted
pursuant to (a)(2), above, the department shall assess the comments and issue a
written decision containing one of the following determinations:
(1) The department shall issue a FONSI if the
department finds that:
a. The comments received do not indicate that
the proposed project will actually have a significant adverse impact on the
environment;
b. The benefit to public health or the
environment conferred by the project as proposed outweighs any significant
adverse impact on the environment caused by the project as proposed; or
c. Any significant adverse impact on the
environment caused by the project as proposed has been or will be addressed
through another permit issued by the department, the Army Corps of Engineers,
or EPA;
(2) If the department finds that the project will
have a significant adverse impact on the environment that could be lessened or
eliminated by implementing an alternative proposal, the department shall order
the applicant to re-review the proposed project to identify an alternative with
less environmental impact;
(3) If the department finds that the project will
have a significant adverse impact on the environment that could be lessened or
eliminated by modifying the project as proposed to incorporate mitigating
procedures, the department shall require mitigating procedures to be
implemented as a condition of receiving financial assistance from the DWSRF; or
(4) If the department finds that the project will
have a significant adverse impact on the environment that cannot be lessened or
eliminated by implementing an alternative proposal or by incorporating
mitigating procedures, the department shall:
a. Direct the applicant to initiate an EIS in
accordance with the National Environmental Policy Act (NEPA), 42 U.S.C. §4332,
and procedures established at 40 CFR 1502; and
b. Require the applicant to use a private
consultant if the department finds that the applicant does not possess the
requisite technical resources to prepare the EIS without the aid of a private
consultant.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
(a)
Within 30 days of the date of the written department decision issued
pursuant to Env-Dw 1108.06(b), any person aggrieved by the decision may appeal the
decision as a permitting decision as specified in RSA 21-O:14.
(b)
If no petition for appeal is filed within the specified period, the
decision shall be final upon the expiration of that period.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
PART Env-Dw 1109
DESIGN, CONSTRUCTION, AND IMPLEMENTATION PHASES
Env-Dw 1109.01 Consulting Contracts for Expenditures of
DWSRF Funds.
(a) For all projects funded from the DWSRF that
require consulting services, the contract for such services shall contain the
following:
(1) A description of the services to be provided
by the consultant, including the due date for any report or plans that will be
prepared;
(2) The recipient’s responsibilities under the
contract;
(3) The estimated time of completion of the
services covered by the contract;
(4) Compensation to be paid to the consultant;
and
(5) Termination provisions.
(b) The recipient shall comply with all
applicable procedures and incidental legal requirements in awarding the
consultant’s contract.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw
1109.02 Plans and Specifications.
(a)
For infrastructure projects, the recipient shall submit engineering
plans and specifications that conform to the applicable design standards
specified in Env-Dw 400.
(b)
For projects other than infrastructure projects, the recipient shall
submit plans and specifications that are appropriate to the proposed project.
(c)
Department approval of the plans and specifications shall not relieve
the recipient of any liabilities or responsibilities with respect to the
design, construction, operation, or performance of the project.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw 1109.03 Construction Contract Documents.
(a)
The recipient shall submit construction contract documents to the
department for review and approval.
(b)
No construction project shall be offered for public bid until after the
department has reviewed the contract documents as specified in Env-Dw 1109.04.
(c)
The construction contract documents submitted by the recipient to the
department shall contain the following:
(1) Bidding requirements for the construction of
the project that meet the requirements in Env-Dw 1109.05, including bid
advertisement or solicitation for competitive quotations, information for
bidders, a bid proposal form that separates eligible construction from
ineligible construction, and applicable bid security requirements;
(2) Agreement and applicable requirements for the
payment bond, performance bond, notice to proceed, and related documents such
as the contractor’s affidavit, the contractor’s release, the certificate of
substantial completion, and the format for change orders;
(3) For loans greater than $100,000, general and
supplemental conditions for the construction of the project, including
provisions requiring the contractor to obtain and maintain the appropriate
insurance coverage;
(4) Applicable federal requirements;
(5) Plans and specifications as specified in
Env-Dw 1109.02;
(6) Appendices including boring logs, permits,
and other details as appropriate;
(7) Provisions giving authorized representatives
of the department access to all construction activities, books, records, and
documents for the purpose of inspection, audit, and copying during normal
business hours; and
(8) Such conditions, specifications, and other
provisions as are required to comply with state and federal law.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Env-Dw
1109.04 Department Review of Contract
Documents.
(a)
The department shall review the contract documents submitted pursuant to
Env-Dw 1109.03 within 30 calendar days of receipt.
(b)
The department shall approve the contract documents if they:
(1) Meet the requirements listed in Env-Dw
1109.03(c);
(2) Are consistent with all applicable state and
federal requirements; and
(3) Are consistent with the planning document
submitted pursuant to Env-Dw 1106.08.
(c)
After the contract documents are approved, no changes to the contract
documents shall be made unless the recipient obtains prior approval from the
department pursuant to Env-Dw 1109.06.
(d)
After the contract documents are approved, no increases in project cost
or scope shall be made unless the recipient obtains prior approval from the
department pursuant to Env-Dw 1109.06.
(e)
Department approval of the contract documents shall not relieve the
recipient of any liabilities or responsibilities with respect to the design,
construction, operation, or performance of the project.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
(a)
The bid period shall be not less than 14 calendar days, unless the
department has approved a shorter bid period due to an imminent threat to
public health or safety;
(b)
The advertisement for bids or competitive quotes shall include the
following information:
(1) The project name and contract number;
(2) The location of work;
(3) A description of work to be performed;
(4) The time and date at which the bids will be
publicly opened and read aloud, and a statement that bids received after that
time will not be accepted;
(5) An address and cost information for obtaining
plans and specifications; and
(6) The addresses where plans and specifications
can be examined.
(c) For projects with estimated construction costs
over $100,000, the advertisement shall also include:
(1) A requirement for a bid security in the
amount of 5% of the bid in the form of a certified check or a bid bond executed
by a surety company authorized to do business in New Hampshire and made payable
to the recipient; and
(2) A statement that a 100% performance bond and
a 100% payment bond will be required.
(d)
The recipient shall reserve the right to:
(1) Reject any or all bids; and
(2) Waive any informalities or minor defects on
bids received; and
(e)
If any addenda to the bid are needed, the recipient shall:
(1) Submit the proposed addenda to the department
for review as much in advance of issuing it as possible;
(2) Refrain from issuing the addenda without
approval from the department; and
(3) Issue the approved addenda no less than 5
days prior to bid opening.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw
1109.06 Changes to Contract Documents
and Project Cost or Scope.
(a)
After the contract documents have been approved by the department, the
recipient shall not make, allow, or authorize any changes, modifications, or
amendments to or departure from the approved plans and specifications that
would materially or significantly affect project cost, estimated revenues, or
project design without the prior written approval of the department.
(b) A request to modify
contract documents as described in (a), above, shall:
(1) Identify each change for which approval is
sought;
(2) Explain the reason(s) for each change
requested, including an explanation of the operational or economic consequences
of the requested change(s) not being approved; and
(3) Explain how the request meets the criteria
specified in (d) or (e), below, as applicable.
(c)
The department shall approve or deny the request within 10 working days
of receipt of a request that meets the criteria of (b), above.
(d)
For changes other than increases to project
cost or scope, the department shall approve each requested change in the
contract documents that the recipient demonstrates is:
(1) Consistent with applicable federal and state
requirements; and
(2) In the best interests of the DWSRF and the
public served by the recipient’s public water system.
(e)
The department shall approve a request for an increase in project cost
or scope if the following criteria are met:
(1) The increased cost or scope was not
reasonably foreseeable at the time the original project proposal was submitted;
(2) The cost increase results in a total cost no
greater than the prevailing rate for the item to which the cost is attributable
such as, but not limited to, labor and materials; and
(3) If the recipient is requesting additional
DWSRF funds, then:
a. The item to which the cost increase is
attributable is an eligible cost as specified in Env-Dw 1104; and
b. The DWSRF has sufficient monies available at
the time the request is filed to cover the proposed cost increase.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw 1109.07 Awarding
Construction Contracts.
(a)
The recipient of financial assistance from the DWSRF for a construction
project shall comply with all applicable legal procedures and other legal
requirements in advertising for bids and awarding the construction contract.
(b)
The text of the construction contract documents shall not vary from the
text of the contract documents approved pursuant to Env-Dw 1109.04, unless a
change has been approved pursuant to Env-Dw 1109.06.
(c)
After receiving and reviewing bids, the recipient shall select the
lowest responsive bid or competitive quotation, unless approval is requested
and obtained from the department to award the contract to a higher bid or
quotation based on the lowest bid or quotation not being from a responsible
bidder.
(d) The recipient shall request approval from the
department to award the construction contract by submitting the following in
writing to the department:
(1) A revised estimate of eligible project costs;
(2) For loans greater than $100,000, monthly cash
flow projections;
(3) Evidence of solicitation for bids or
competitive quotations;
(4) A tabulation of all bids that were received;
(5) A letter signed by the recipient’s authorized
representative indicating the contract value and the name of the bidder to whom
the contract is planned to be awarded;
(6) A copy of the bid proposal of the bidder to
whom the contract is planned to be awarded;
(7) Documentation assuring compliance with 40 CFR
§35.3575; and
(8) Certification that all necessary permits,
land acquisitions, and easements have been secured.
(e)
The department shall approve the award of the construction contract if
it determines that all applicable requirements have been met. The applicant shall not award the construction
contract until after it has received written approval to do so from the
department.
(f) For all construction projects funded by the
DWSRF program, following receipt of approval from the department the recipient
shall sign a construction contract with the selected contractor.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw 1109.08 Recipient’s Obligations for Inspections
During Construction.
(a)
During the construction phase of the project, the recipient shall obtain the
engineering or other inspection services necessary to assure completion of the
project in accordance with the financial assistance agreement and the approved
plans and specifications.
(b)
After the construction contract is awarded, the recipient shall provide
for on-site inspections of the project by a resident project representative
that are sufficient to provide assurance to the recipient and the department
that the work is being performed in a satisfactory manner in accordance with
the approved plans and specifications, approved alterations, and sound
engineering principles and building practices.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw 1109.09 Department Inspections During Construction.
(a)
The recipient shall allow the department to inspect the project at any
time in order to confirm that:
(1) The materials furnished meet the approved
specifications; and
(2) The project is being built in accordance with
the approved plans and specifications and any approved alterations.
(b)
In conjunction with project inspections, the department shall:
(1) Inspect the materials that are visible at the
time of the inspection to determine compliance with the approved plans and
specifications; and
(2) Document the manner and progress of the
project, conditions relating to the materials furnished, and the contractor’s
compliance with the approved plans and specifications for the project.
(c)
Inspections by the department shall not release the contractor from any
obligation to perform the work in accordance with the requirements of the
contract documents, nor shall such inspections release the project engineer
from determining compliance with the requirements of the contract documents.
(d)
The contractor and recipient shall provide the department with such
accommodations as are needed for the department to determine whether the work
as performed is in accordance with the requirements and intent of the contract.
(e)
The department shall, as soon as practicable, bring to the attention of
the recipient and the resident project representative any discrepancies between
the approved plans and specifications and the actual work observed of which it
becomes aware through its inspections.
(f) Upon being notified of any such
discrepancies, the recipient and the resident project representative shall
immediately:
(1) Initiate necessary action to rectify the
deficiencies; or
(2) Provide documentation explaining the
reason(s) for the discrepancies and demonstrating that the installation meets
applicable requirements.
(g)
If the recipient’s resident project representative disagrees with the
department as to whether material furnished or work performed conforms with the
terms of the construction contract, the recipient shall direct the resident
project representative to reject questionable materials and initiate other
action provided for in the construction contract, including suspension where
necessary, until all disputed issues are resolved in accordance with the terms
of the construction contract.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw 1109.10 Testing During Construction.
(a)
In addition to normal testing procedures required of the recipient, the
department shall require such additional tests of building materials and
processes as the department determines to be necessary to demonstrate
compliance with the approved plans and specifications and any approved
alterations thereto during the building of projects financed in whole or in
part by DWSRF funds.
(b)
All tests, whether for the department or the project engineer, shall
conform to current American Water Works Association standards as specified in
Env-Dw 407, American Association of State Highway and Transportation Officials,
American Society of Testing and Materials, and the New Hampshire department of
transportation published procedures, or similar criteria, as applicable to the
specific materials and processes proposed by the recipient to be used in the
project.
(c)
The department shall specify which tests are applicable based on the
specific materials and processes proposed by the recipient to be used in the
project. Samples for testing shall be
furnished free of cost to the department upon request at the construction site.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw 1109.11 Limitations on Project Modifications;
Requests for Approval.
(a)
After construction has commenced, the recipient shall not make, allow,
or authorize any changes, modifications, or amendments to, or any departures
from, the approved plans and specifications that would materially or
significantly affect project cost, estimated revenues, or project design in
accordance with Env-Dw 1109.08 without prior written approval from the
department.
(b)
The recipient shall request approval for changes covered by (a), above,
by submitting the following information in writing to the department on or with
“Form 1A: Loan Amendment Application Form”, NHDES-W-03-184, November 2020,
available at https://onlineforms.nh.gov/?FormTag=NHDES-W-03-184:
(1) The name, location, and PWS identifier of the
recipient’s water system;
(2) The project number of the final financial
assistance agreement and the project’s short title;
(3) The name, telephone number, and email address
of the contact person for purposes of the request;
(4) For each modification for which the recipient
is seeking approval:
a. A description of the modification; and
b. The reason(s) why the modification is
necessary;
(5) An explanation of the operational and
economic consequences to the water system and to public health and the
environment of the department not approving the requested modifications;
(6) If the request is for an increase in the loan
amount, the following:
a. A revised budget that shows the original
budget and the revised budget for each task or classification affected by the
requested change; and
b. Updated financial statements;
(7) If the request is for a revised completion
date, the revised schedule including design start date, construction contract
award date, and project completion date; and
(8) If the requested change is for work in a
different location than listed in the original Form 3: Environmental Review, an
amended Environmental Review form.
(c)
Prior departmental approval of project change orders shall not be
required if applicant’s project engineer certifies to the department that such
change, modification, amendment, or departure:
(1) Will not materially or significantly affect
project cost, estimated revenues, or project design; and
(2) Is consistent with the objectives of the
project and within the scope of the final financial assistance agreement.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw 1109.12 Approval of Project Modifications.
(a)
Subject to (b) and (c), below, the department shall approve a request
for project modification submitted pursuant to Env-Dw 1109.11 if:
(1) The scope of the project as modified is
consistent with the original intent of the financial assistance;
(2) The project as modified will not cause the
water system to be out of compliance with the federal SDWA, 40 CFR Parts 141,
142, and 143, RSA 485, and applicable rules in subtitle Env-Dw; and
(3) If additional DWSRF funds are requested,
then:
a. The increased cost is approvable under the
criteria established in Env-Dw 1109.06(e); and
b. The fund has sufficient monies available at
the time the request is filed to cover the proposed cost increase.
(b)
The department shall review the request and notify the recipient and
resident project representative as soon as practicable considering the scope of
the request.
(c)
A change of project scope, such as the addition of new construction
items, shall not be eligible for additional funding after loan closing unless
one of the following conditions are met:
(1) The change of scope is necessary due to an
inadvertent oversight, and is needed to provide an operable water system and
not to replace faulty construction or equipment already funded; or
(2) The change of scope is necessary due to
changes in federal or state requirements.
(d)
The amount of funding provided from the DWSRF shall be increased only by
a formal amendment in writing with the department, with governor and council
approval.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw 1109.13 Construction Phase Submittal. During the construction phase of the project,
the recipient shall submit any building phase submittals required by the final
financial assistance agreement to be submitted for the department's
approval.
Env-Dw 1109.14 Final Inspection and Review of Records.
(a)
Upon completion of any project for which financial assistance from the
DWSRF has been provided, the applicant shall furnish to the department written
notification of completion.
(b)
Upon receipt of such notification, or upon project completion should
notification not be furnished as required, and prior to the department approving the
final loan disbursement, the department shall:
(1) Confirm that the project has been completed
as contemplated in the financial assistance agreement, which shall include
conducting a final on-site inspection of the project, if necessary, with the recipient or the recipient’s
designee; and
(2) Review the recipient’s records relative to
funds furnished to the recipient from the DWSRF.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw 1110.01 Purpose. The purpose of the rules in this part is to
accommodate situations in which strict compliance with all requirements
established by this chapter may not be in the best interests of the public or the DWSRF.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw 1110.02 Procedures.
(a)
Any applicant or recipient who is or would be directly and adversely
affected by the strict application of a rule in Env-Dw 1100 may request a
waiver thereof from the department.
(b)
Each request for a waiver shall be filed in writing by the authorized
representative of the applicant or recipient, as applicable.
(c)
Each request for a waiver shall include the information specified in
Env-Dw 1110.03 and be signed as required by Env-Dw 1110.04.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw
1110.03 Content and Format of
Requests. The person requesting the
waiver shall provide the following information to the department:
(a)
The name, mailing address, and daytime telephone number including area
code of the requestor;
(b)
The project to which the waiver request relates; and
(c)
For each waiver sought, the following:
(1) The number of the specific section of the
rules;
(2) A complete explanation of why a waiver is
being requested, including an explanation of the economic and operational
consequences of complying with the rule as written;
(3) If applicable, a full explanation of the
alternate(s) proposed to be substituted for the requirement in the rule,
including documentation or data, or both, to support the alternative;
(4) Whether the need for the waiver is
time-limited and, if so, the estimated length of time the waiver will be
needed; and
(5) A complete explanation of why the applicant
believes that having the waiver granted will meet the criteria in Env-Dw
1110.05.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw 1110.04 Signature Required.
(a)
The authorized representative of the applicant or recipient that is
requesting the waiver shall sign the request.
(b)
The authorized representative’s signature shall constitute certification
that:
(1) The information provided is true, complete,
and not misleading to the best of the signer’s knowledge and belief;
(2) The signer understands that any waiver
granted based on false, incomplete, or misleading information is subject to
revocation; and
(3) The signer is subject to the penalties
specified in New Hampshire law for falsification in official matters, currently
RSA 641.
(c)
If the signer is or is acting on behalf of a listed engineer as defined
in Env-C 502.10, the signature also shall constitute certification that the
signer understands that the submittal of false, incomplete, or misleading
information could constitute grounds for debarring the listed engineer from the
roster.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw 1110.05 Criteria.
(a)
Subject to (b), below, the department shall grant a waiver if:
(1) Granting the waiver, conditional upon
implementation of alternatives, if applicable, will result in circumstances
that are as protective of the public, the environment, and the integrity of the
DWSRF program as the requirements contained in this chapter;
(2) Granting the waiver, conditional upon
implementation of alternatives, if applicable, will not adversely impact the
department’s obligations under RSA 486 and obligations associated with
maintaining primacy from the EPA; and
(3) Strict adherence to the rule would not be in
the best interest of the public, the environment, or the DWSRF.
(b) No waiver shall be granted if the effect of
the waiver would be to waive or modify a state or federal statutory
requirement, including but not limited to any requirement of RSA 486, RSA 485,
the federal SDWA, or a capitalization grant, unless:
(1) Such statute or grant
expressly provides that the requirement may be waived or modified; and
(2) In the case of a federal statute or
capitalization grant, EPA does not object to granting the waiver.
Source.
(See Revision Note #1 and Revision Note #2 at chapter heading for Env-Dw
1100) #13160, eff 1-20-21
Env-Dw 1110.06 Decisions.
(a)
The department shall notify the person requesting the waiver of its
decision in writing within 30 calendar days of receiving a complete
request. If the request is denied, the
department shall specify the reason(s) for the denial in the notice.
(b) The department shall include such conditions
in a waiver as are necessary to ensure that the criteria specified in Env-Dw 1110.05 are met,
including if applicable the implementation of alternatives.
(c) If the need for a waiver is temporary, the
waiver shall specify the date on which it expires.
Source. (See Revision
Note #1 and Revision Note #2 at chapter heading for Env-Dw 1100) #13160, eff
1-20-21
Appendix A: State Statutes and Federal Requirements
Implemented
|
Rule Section(s) |
State Statute(s) Implemented |
Federal Requirements Implemented |
|
Env-Dw 1101 – 1106 |
RSA 486:14, I |
42 U.S.C. §§ 300f - 300j-26 |
|
Env-Dw 1107 |
RSA 486:14, I; RSA
486:14, III |
42 U.S.C. §§ 300f -
300j-26 |
|
Env-Dw 1108 – 1109 |
RSA 486:14, I |
42 U.S.C. §§ 300f -
300j-26 |
|
Env-Dw 1110 |
RSA 541-A:22, IV |
|
Appendix B: Statutory Definitions
RSA
485:1-a
XIII.
“Person” means any individual, partnership, company, public or private
corporation, political subdivision or agency of the state, department, agency
or instrumentality of the United States, or any other legal entity.
XIV. “Political subdivision” means any
municipality, county, district, or any portion or combination of 2 or more
thereof.
XV.
“Public water system” means a system for the provision to the public of
piped water for human consumption, if such system has at least 15 service
connections or regularly serves an average of at least 25 individuals daily at
least 60 days out of the year. Such term includes (1) any collection,
treatment, storage, and distribution facilities under control of the operator
of such system and used primarily in connection with such system, and (2) any
collection or pretreatment storage facilities not under such control which are
used primarily in connection with such system. Any water system which meets all
of the following conditions is not a public water system:
(a) Consists only of distribution and storage
facilities (and does not have any collection and treatment facilities);
(b) Obtains all of its water from, but is not
owned or operated by, a public water system; and
(c) Does not sell water to any person.
Appendix C: Referenced
Federal Provisions
§ 35.3520
Systems, projects, and project-related costs eligible for assistance from the
Fund.
(a) Eligible systems. Assistance from the
Fund may only be provided to:
(1) Privately-owned and publicly-owned community
water systems and non-profit non-community water systems.
(2) Projects that will result in the creation of
a community water system in accordance with paragraph (b)(2)(vi) of this
section.
(3) Systems referred to in section 1401(4)(B) of
the Act for the purposes of point of entry or central treatment under section
1401(4)(B)(i)(III).
(b) Eligible projects.
(1) General. Projects that address present
or prevent future violations of health-based drinking water standards are
eligible for assistance. These include projects needed to maintain compliance
with existing national primary drinking water regulations for contaminants with
acute and chronic health effects. Projects to replace aging infrastructure are
eligible for assistance if they are needed to maintain compliance or further
the public health protection objectives of the Act.
(2) Only the following project categories are
eligible for assistance from the Fund:
(i) Treatment.
Examples of projects include installation or upgrade of facilities to improve
the quality of drinking water to comply with primary or secondary standards and
point of entry or central treatment under section 1401(4)(B)(i)(III) of the Act.
(ii) Transmission and distribution.
Examples of projects include installation or replacement of transmission and
distribution pipes to improve water pressure to safe levels or to prevent
contamination caused by leaks or breaks in the pipes.
(iii) Source.
Examples of projects include rehabilitation of wells or development of eligible
sources to replace contaminated sources.
(iv) Storage. Examples of projects include
installation or upgrade of eligible storage facilities, including finished
water reservoirs, to prevent microbiological contaminants from entering a
public water system.
(v) Consolidation. Eligible projects are
those needed to consolidate water supplies where, for example, a supply has
become contaminated or a system is unable to maintain compliance for technical,
financial, or managerial reasons.
(vi) Creation of new systems. Eligible
projects are those that, upon completion, will create a community water system
to address existing public health problems with serious risks caused by unsafe
drinking water provided by individual wells or surface water sources. Eligible
projects are also those that create a new regional community water system by
consolidating existing systems that have technical, financial, or managerial
difficulties. Projects to address existing public health problems associated
with individual wells or surface water sources must be limited in scope to the
specific geographic area affected by contamination. Projects that create new
regional community water systems by consolidating existing systems must be
limited in scope to the service area of the systems being consolidated. A
project must be a cost-effective solution to addressing the problem. A State
must ensure that the applicant has given sufficient public notice to
potentially affected parties and has considered alternative solutions to
addressing the problem. Capacity to serve future population growth cannot be a
substantial portion of a project.
(c) Eligible project-related costs. In
addition to costs needed for the project itself, the following project-related
costs are eligible for assistance from the Fund:
(1) Costs for planning and design and associated
pre-project costs. A State that makes a loan for only planning and design is
not required to provide assistance for completion of the project.
(2) Costs for the acquisition of land only if
needed for the purposes of locating eligible project components. The land must
be acquired from a willing seller.
(3) Costs for restructuring systems that are in
significant noncompliance with any national primary drinking water regulation
or variance or that lack the technical, financial, and managerial capability to
ensure compliance with the requirements of the Act, unless the systems are
ineligible under paragraph (d)(2) or (d)(3) of this section.
(d) Ineligible systems. Assistance from
the Fund may not be provided to:
(1) Federally-owned public water systems and
for-profit non-community water systems.
(2) Systems that lack the technical, financial,
and managerial capability to ensure compliance with the requirements of the
Act, unless the assistance will ensure compliance and the owners or operators
of the systems agree to undertake feasible and appropriate changes in
operations to ensure compliance over the long-term.
(3) Systems that are in significant noncompliance
with any national primary drinking water regulation or variance, unless:
(i) The purpose of the assistance is to address
the cause of the significant noncompliance and will ensure that the systems
return to compliance; or
(ii) The purpose of the assistance is unrelated to
the cause of the significant noncompliance and the systems are on enforcement
schedules (for maximum contaminant level and treatment technique violations) or
have compliance plans (for monitoring and reporting violations) to return to
compliance.
(e)
Ineligible projects. The following projects are ineligible for
assistance from the Fund:
(1) Dams or rehabilitation of dams.
(2) Water rights, except if the water rights are
owned by a system that is being purchased through consolidation as part of a
capacity development strategy.
(3) Reservoirs or rehabilitation of reservoirs,
except for finished water reservoirs and those reservoirs that are part of the
treatment process and are on the property where the treatment facility is
located.
(4) Projects needed primarily for fire
protection.
(5) Projects needed primarily to serve future
population growth. Projects must be sized only to accommodate a reasonable
amount of population growth expected to occur over the useful life of the
facility.
(6) Projects that have received assistance from
the national set-aside for Indian Tribes and Alaska Native Villages under
section 1452(i) of the Act.
(f)
Ineligible project-related costs. The following project-related
costs are ineligible for assistance from the Fund:
(1) Laboratory fees for routine compliance
monitoring.
(2) Operation and maintenance expenses.
40 CFR §35.3525 Authorized types of assistance from
the Fund.
A State may only provide the following types of
assistance from the Fund:
(a) Loans. (1) A State may make loans at or
below the market interest rate, including zero interest rate loans. Loans may be awarded only if:
(i) An assistance recipient begins annual repayment of
principal and interest no later than one year after project completion. A
project is completed when operations are initiated or are capable of being
initiated.
(ii)
A recipient completes loan repayment no later than 20 years after project
completion except as provided in paragraph (b)(3) of this section.
(iii)
A recipient establishes a dedicated source of revenue for repayment of the loan
which is consistent with local ordinances and State laws or, for
privately-owned systems, a recipient demonstrates that there is adequate
security to assure repayment of the loan.
(2)
A State may include eligible project reimbursement costs within loans if:
(i) A system received approval, authorization to proceed, or
any similar action by a State prior to initiation of project construction and
the construction costs were incurred after such State action; and
(ii)
The project met all of the requirements of this subpart and was on the State’s
fundable list, developed using a priority system approved by EPA. A project on
the comprehensive list which is funded when a project on the fundable list is
bypassed using the State’s bypass procedures in accordance with §
35.3555(c)(2)(ii) may be eligible for reimbursement of costs incurred after the
system has been informed that it will receive funding.
(3)
A State may include eligible planning and design and other associated
pre-project costs within loans regardless of when the costs were incurred.
(4)
All payments of principal and interest on each loan must be credited to the
Fund.
(5)
Of the total amount available for assistance from the Fund each year, a State
must make at least 15 percent available solely for providing loan assistance to
small systems, to the extent such funds can be obligated for eligible projects.
A State that provides assistance in an amount that is greater than 15 percent
of the available funds in one year may credit the excess toward the 15 percent
requirement in future years.
(6)
A State may provide incremental assistance for a project (e.g., for a
particularly large, expensive project) over a period of years.
(b) Assistance to disadvantaged communities.
(1) A State may provide loan subsidies (e.g., loans which include principal
forgiveness, negative interest rate loans) to benefit communities meeting the
State’s definition of ‘‘disadvantaged’’ or which the State expects to become
‘‘disadvantaged’’ as a result of the project. Loan subsidies in the form of
reduced interest rate loans that are at or above zero percent do not fall under
the 30 percent allowance described in paragraph (b)(2) of this section.
(2)
A State may take an amount equal to no more than 30 percent of the amount of a
particular fiscal year’s capitalization grant to provide loan subsidies to
disadvantaged communities. If a State does not take the entire 30 percent
allowance associated with a particular fiscal year’s capitalization grant, it
cannot reserve the authority to take the remaining balance of the allowance
from future capitalization grants. In addition, a State must:
(i) Indicate in the Intended Use Plan (IUP) the amount of
the allowance it is taking for loan subsidies;
(ii)
Commit capitalization grant and required State match dollars taken for loan
subsidies in accordance with the binding commitment requirements in §
35.3550(e); and
(iii)
Commit any other dollars (e.g., principal and interest repayments, investment
earnings) taken for loan subsidies to projects over the same time period during
which binding commitments are made for the capitalization grant from which the
allowance was taken.
(3)
A State may extend the term for a loan to a disadvantaged community, provided
that a recipient completes loan repayment no later than 30 years after project
completion and the term of the loan does not exceed the expected design life of
the project.
(c) Refinance or purchase of local debt
obligations—(1) General. A State may buy or refinance local debt
obligations of municipal, intermunicipal, or interstate agencies where the debt
obligation was incurred and the project was initiated after July 1, 1993.
Projects must have met the eligibility requirements under section 1452 of the
Act and this subpart to be eligible for refinancing. Privately-owned systems
are not eligible for refinancing.
(2)
Multi-purpose debt. If the original debt for a project was in the form of a
multi-purpose bond incurred for purposes in addition to eligible purposes under
section 1452 of the Act and this subpart, a State may provide refinancing only
for the eligible portion of the debt, not the entire debt.
(3)
Refinancing and State match. If a State has credited repayments of loans made
under a pre-existing State loan program as part of its State match, the State
cannot also refinance the projects under the DWSRF program. If the State has
already counted certain projects toward its State match which it now wants to
refinance, the State must provide replacement funds for the amounts previously
credited as match.
(d) Purchase insurance or guarantee for local
debt obligations. A State may provide assistance by purchasing insurance or
guaranteeing a local debt obligation to improve credit market access or to
reduce interest rates. Assistance of this type is limited to local debt
obligations that are undertaken to finance projects eligible for assistance
under section 1452 of the Act and this subpart.
(e) Revenue or security for Fund debt
obligations (leveraging). A State may use Fund assets as a source of
revenue or security for the payment of principal and interest on revenue or
general obligation bonds issued by the State in order to increase the total
amount of funds available for providing assistance. The net proceeds of the
sale of the bonds must be deposited into the Fund and must be used for
providing loans and other assistance to finance projects eligible under section
1452 of the Act and this subpart.
§ 35.3555 Intended Use Plan (IUP).
(a) General.
A State must prepare an annual IUP which describes how it intends to use DWSRF
program funds to support the overall goals of the DWSRF program and contains
the information outlined in paragraph (c) of this section. In those years in
which a State submits a capitalization grant application, EPA must receive an
IUP prior to the award of the capitalization grant. A State must prepare an
annual IUP as long as the Fund or set-aside accounts remain in operation. The
IUP must conform to the fiscal year adopted by the State for the DWSRF program
(e.g., the State's fiscal year or the Federal fiscal year).
(b) Public
review requirements. A State must seek meaningful public review and comment
during the development of the IUP. A State must include a description of the
public review process and an explanation of how it responded to major comments
and concerns. If a State prepares separate IUPs (one for Fund monies and one
for set-aside monies), the State must seek public review and comment during the
development of each IUP.
(c) Content.
Information in the IUP must be provided in a format and manner that is
consistent with the needs of the RA.
(1) Priority system. The IUP must include a
priority system for ranking individual projects for funding that provides
sufficient detail for the public and EPA to readily understand the criteria
used for ranking. The priority system must provide, to the maximum extent
practicable, that priority for the use of funds will be given to projects that:
address the most serious risk to human health; are necessary to ensure
compliance with the requirements of the Act (including requirements for
filtration); and assist systems most in need, on a per household basis,
according to State affordability criteria. A State that does not adhere to the
three criteria must demonstrate why it is unable to do so.
(2) Priority lists of projects. All projects,
with the exception of projects funded on an emergency basis, must be ranked
using a State's priority system and go through a public review process prior to
receiving assistance.
(i) The IUP must
contain a fundable list of projects that are expected to receive assistance
from available funds designated for use in the current IUP and a comprehensive
list of projects that are expected to receive assistance in the future. The
fundable list of projects must include: the name of the public water system;
the priority assigned to the project; a description of the project; the
expected terms of financial assistance based on the best information available
at the time the IUP is developed; and the population of the system's service
area at the time of the loan application. The comprehensive list must include,
at a minimum, the priority assigned to each project and, to the extent known,
the expected funding schedule for each project. A State may combine the
fundable and comprehensive lists into one list, provided that projects which
are expected to receive assistance from available funds designated for use in
the current IUP are identified.
(ii) The IUP may include procedures which would
allow a State to bypass projects on the fundable list. The procedures must
clearly identify the conditions which would allow a project to be bypassed and
the method for identifying which projects would receive funding. If a bypass
occurs, a State must fund the highest ranked project on the comprehensive list
that is ready to proceed. If a State elects to bypass a project for reasons
other than readiness to proceed, the State must explain why the project was bypassed
in the Biennial Report and during the annual review. To the maximum extent
practicable, a State must work with bypassed projects to ensure that they will
be prepared to receive funding in future years.
(iii) The IUP may allow for the funding of projects
which require immediate attention to protect public health on an emergency
basis, provided that a State defines what conditions constitute an emergency
and identifies the projects in the Biennial Report and during the annual
review.
(iv) The IUP must demonstrate how a State will
meet the requirement of providing loan assistance to small systems as described
in § 35.3525(a)(5). A State that is unable to comply with this requirement must
describe the steps it is taking to ensure that a sufficient number of projects
are identified to meet this requirement in future years.
(3) Distribution of funds. The IUP must describe
the criteria and methods that a State will use to distribute all funds
including:
(i) The process and
rationale for distribution of funds between the Fund and set-aside accounts;
(ii) The process for selection of systems to
receive assistance;
(iii) The rationale for providing different types
of assistance and terms, including the method used to determine the market rate
and the interest rate;
(iv) The types, rates, and uses of fees assessed
on assistance recipients; and
(v) A description of the financial planning
process undertaken for the Fund and the impact of funding decisions on the
long-term financial health of the Fund.
(4) Financial status. The IUP must describe the
sources and uses of DWSRF program funds including: the total dollar amount in
the Fund; the total dollar amount available for loans, including loans to small
systems; the amount of loan subsidies that may be made available to
disadvantaged communities from the 30 percent allowance in § 35.3525(b)(2); the
total dollar amount in set-aside accounts, including the amount of funds or
authority reserved; and the total dollar amount in fee accounts.
(5) Short- and long-term goals. The IUP must
describe the short-term and long-term goals it has developed to support the
overall goals of the DWSRF program of ensuring public health protection,
complying with the Act, ensuring affordable drinking water, and maintaining the
long-term financial health of the Fund.
(6) Set-aside activities. (i)
The IUP must identify the amount of funds a State is electing to use for
set-aside activities. A State must also describe how it intends to use these
funds, provide a general schedule for their use, and describe the expected
accomplishments that will result from their use.
(ii) For loans made in accordance with the local
assistance and other State programs set-aside under § 35.3535(e)(1)(i) and (e)(1)(ii), the IUP must, at a minimum, describe the
process by which recipients will be selected and how funds will be distributed
among them.
(7) Disadvantaged community assistance. The IUP
must describe how a State's disadvantaged community program will operate
including:
(i) The State's
definition of what constitutes a disadvantaged community;
(ii) A description of affordability criteria used
to determine the amount of disadvantaged assistance;
(iii) The amount and type of loan subsidies that
may be made available to disadvantaged communities from the 30 percent
allowance in § 35.3525(b)(2); and
(iv) To the maximum extent practicable, an
identification of projects that will receive disadvantaged assistance and the
respective amounts.
(8) Transfer process. If a State decides to
transfer funds between the DWSRF program and CWSRF program, the IUPs for the
DWSRF program and the CWSRF program must describe the process including:
(i) The total amount
and type of funds being transferred during the period covered by the IUP;
(ii) The total amount of authority being reserved
for future transfer, including the authority reserved from previous years; and
(iii) The impact of the transfer on the amount of
funds available to finance projects and set-asides and the long-term impact on
the Fund.
(9) Cross-collateralization process. If a State
decides to cross-collateralize Fund assets of the DWSRF program and CWSRF
program, the IUPs for the DWSRF program and the CWSRF program must describe the
process including:
(i) The type of
monies which will be used as security;
(ii) How monies will be used in the event of a
default; and
(iii) Whether or not monies used for a default in
the other program will be repaid, and if they will not be repaid, what will be
the cumulative impact on the Funds.