HB 582-FN-A – AS INTRODUCED

2007 SESSION

07-0521

06/10

HOUSE BILL 582-FN-A

AN ACT relative to the bridge over the Merrimack River.

SPONSORS: Rep. L. Ober, Hills 27; Rep. Jasper, Hills 27; Rep. Haefner, Hills 27; Rep. R. Ober, Hills 27; Rep. Renzullo, Hills 27

COMMITTEE: Public Works and Highways

ANALYSIS

This bill:

I. Directs the department of transportation to expedite the project development and construction of a bridge to cross the Merrimack River.

II. Authorizes the commissioner to establish tolls.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Explanation: Matter added to current law appears in bold italics.

Matter removed from current law appears [in brackets and struckthrough.]

Matter which is either (a) all new or (b) repealed and reenacted appears in regular type.

07-0521

06/10

STATE OF NEW HAMPSHIRE

In the Year of Our Lord Two Thousand Seven

AN ACT relative to the bridge over the Merrimack River.

Be it Enacted by the Senate and House of Representatives in General Court convened:

1 Department of Transportation, Design and Construction of Bridge. The department of transportation shall give priority to “circumferential highway-project 10625h Northern River Crossing” and expedite the project development and construction of the bridge to cross over the Merrimack River and connect U.S. Route 3 in Merrimack to NH 3A and NH 102 in Litchfield.

2 Funding for Design And Construction of Bridge. The design and construction of the bridge to connect U.S. Route 3 in the town of Merrimack to NH 3A and NH 102 in Litchfield shall be funded through bonds authorized in the state 10-year transportation improvement program. The commissioner shall be authorized to establish tolls on the Litchfield side of the river, which shall terminate when the bonds are paid off.

3 Effective Date. This act shall take effect 60 days after its passage.

LBAO

07-0521

Revised 02/09/07

HB 582 FISCAL NOTE

AN ACT relative to the bridge over the Merrimack River.

FISCAL IMPACT:

METHODOLOGY: