CHAPTER 309
HB 2000-FN-LOCAL - FINAL VERSION
4may00.....4176h
5/18/00.....4540s
5/18/00.....4587s
31may00.....4655-CofC
2000 SESSION
01/09
HOUSE BILL 2000-FN-LOCAL
AN ACT relative to a 10-year transportation plan, establishing a committee to study the transportation plan projects, relative to proposed toll booths in the city of Nashua, and relative to alternatives to the statewide toll booth system.
COMMITTEE: Public Works and Highways
This bill:
I. Updates the 10-year transportation plan to maintain the highways and bridges in the state.
II. Adds a budget footnote to 1999, 159:1.
III. Establishes a committee to study the priority and funding of the projects included in the 10-year transportation plan.
IV. Eliminates proposed toll booths in Nashua.
V. Requires the commissioner of the department of transportation to create alternatives to the state's toll booth system.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Explanation: Matter added to current law appears in bold italics.
Matter removed from current law appears [in brackets and struckthrough.]
Matter which is either (a) all new or (b) repealed and reenacted appears in regular type.
4may00.....4176h
5/18/00.....4540s
5/18/00.....4587s
31may00.....4655-CofC
00-2808
01/09
STATE OF NEW HAMPSHIRE
In the Year of Our Lord Two Thousand
AN ACT relative to a 10-year transportation plan, establishing a committee to study the transportation plan projects, relative to proposed toll booths in the city of Nashua, and relative to alternatives to the statewide toll booth system.
Be it Enacted by the Senate and House of Representatives in General Court convened:
309:1 State 10-Year Transportation Plan. RSA 240 is repealed and reenacted to read as follows:
CHAPTER 240
STATE 10-YEAR TRANSPORTATION PLAN
240:1 Legislative Intent. This plan is predicated on the report submitted to the legislature by the governor dated January, 2000 and is intended to serve as the guideline for transportation projects in the state for the next decade.
240:2 Interstate Maintenance. Interstate maintenance projects shall be as follows:
ROUTE/ROAD PROJECT NAME/NUMBER DESCRIPTION/IMPROVEMENT
I. In federal fiscal year 2001:
(a) I-393 Concord - Cold plane and overlay with fabric and 3"
Pembroke pavement from N. Main Street to easterly end (5.0
13184 miles)
(b) I-293 Manchester From I-93 interchange west to the Merrimack
12110 River approx. 2.6 mi rehab and widen to 3 lanes in
each direction
(c) I-89 New London- Crack seal mainline and ramps from exit 11 to
Sunapee/Grantham exit 12A (New London-Sunapee 6 mi)
12882 and from exit 13 to exit 15 (Grantham 7 mi)
- FY 2001 statewide res/rec/cs program
(d) Various Statewide Pavement marking (annual project)
12223
(e) I-93 Thornton-Woodstock Pavement and bridge rehab from .16 mile south
13139 B of exit 29 through and including exit 30
II. In federal fiscal year 2002:
(a) I-93 Ashland-Plymouth Crack seal mainline and ramps from exit 24 N
to exit 26 - FY 2002 statewide res/rec/cs prog
(b) I-93 Plymouth-Campton - Pavement and bridge rehab from .1
Thornton mile north of exit 26 to .16 mile south
13139 A of exit 29
(c) Various Statewide Pavement marking (annual project)
12223
III. In federal fiscal year 2003:
(a) I-89 / I-93 Enfield / Tilton - Crack seal mainline and ramps I-89, from exit 15
Ashland N to 16, and I-93, from exit 20 N to exit 24 - FY
2003 statewide res/rec/cs prog
(b) I-89 Lebanon Weigh station rehabilitation
(c) I-89 Lebanon Reconstruction of the interchange & bridges
11700 @ exit 20, including approaches on NH 12A
(d) Various Statewide Pavement marking (annual project)
12223
IV. In federal fiscal year 2004:
(a) I-93 Salem-Manchester Widening from Mass S/L north 4.5 miles including
10418 exits 1 & 2 & Pelham Road including bridges
(b) I-89, I-93, Statewide Interstate crack seal (annual project)
I-95, I-293, 04M-ICS
I-393
(c) Various Statewide Pavement marking (annual project)
12223
(d) I-89 Sutton-New London Crack seal mainline and ramps from exit 8 N
to exit 9 - FY statewide res/rec/cs prog
V. In federal fiscal year 2005:
(a) I-93 Salem-Manchester Widening from exit 2 northerly to
10418 A exit 4 (NH 102)
(b) I-89, I-93, Statewide Interstate crack seal (annual project)
I-95, I-293, 04M-ICS
I-393
(c) Various Statewide Pavement marking (annual project)
12223
VI. In federal fiscal year 2006:
(a) I-93 Canterbury Overlay from north of exit 17 to exit
18 with 1" reinforced pavement (3.0 miles)
(b) I-89 Enfield-Lebanon 1" overlay from exit 17 to Vermont S/L
(6.5 miles) for safety, slip lining twin
66" pipes north of exit 17 and bridge joint rehab
(c) I-93 Salem-Manchester Widening from exit 2 northerly to
10418 A exit 4 (NH 102)
(d) I-89, I-93, Statewide Interstate crack seal (annual project)
I-95, I-293, 04M-ICS
I-393
(e) Various Statewide Pavement marking (annual project)
12223
(f) I-89 Warner Rehabilitation (3 miles) from exit 7 to exit 8
VII. In federal fiscal year 2007:
(a) I-93 Northfield Complete exit 19
(b) I-93 Salem-Manchester Widening from exit 2 northerly to
10418 A exit 4 (NH 102)
(c) I-93 Salem-Manchester Widening from exit 4 northerly to
10418 B I-293
(d) I-89, I-93, Statewide Interstate crack seal (annual project)
I-95, I-293, 04M-ICS
I-393
(e) Various Statewide Pavement marking (annual project)
12223
VIII. In federal fiscal year 2008:
(a) I-93 Bow - Concord Widen from I-89 to between exits 15
and 16 to match into existing project
(b) I-93 Derry/Londerry Construction of exit 4A - new interchange
13065 between existing exit 4 and exit 5 to
(1) relieve traffic congestion and (2) as access
to potential development of industrial land
(c) I-89 Enfield - Lebanon Rehab from exit 15 to exit 17 (4.0 miles)
(d) I-93 Salem - Manchester Widening from exit 4 northerly to I-293
10418 B
(e) I-89, I-93, Statewide Interstate crack seal (annual project)
I-95, I-293, 04M-ICS
I-393
(f) Various Statewide Pavement marking (annual project)
12223
IX. In federal fiscal year 2009:
(a) I-93 Bow - Concord Widen from I-89 to between exits 15
and 16 to match into existing project
(b) I-93 Lincoln Cold plane & overlay with fabric & 2" pavement
from US 3 bridge to Whitehouse bridge (6 miles)
if not overlayed
(c) I-89, I-93, Statewide Interstate crack seal (annual project)
I-95, I-293, 04M-ICS
I-393
(d) Various Statewide Pavement marking (annual project)
12223
X. In federal fiscal year 2010:
(a) I-93 Bow - Concord Widen from I-89 to between exits 15
and 16 to match into existing project
(b) I-89 Lebanon, NH - Widen & rehabilitation bridges over
Hartford, VT Connecticut River
(c) I-93 Littleton, NH - Reclaim & 3" overlay from north of
Waterford, VT exit 41 to Vermont S/L (9 miles)
(d) I-89, I-93, Statewide Interstate crack seal (annual project)
I-95, I-293, 04M-ICS
I-393
(e) Various Statewide Pavement marking (annual project)
12223
240:3 National Highway System. National highway system projects shall be as follows:
ROUTE/ROAD PROJECT NAME/NUMBER DESCRIPTION/IMPROVEMENT
I. In federal fiscal year 2001:
(a) US 302 & Conway Construction & roadway improvements from
NH 16 11339 H just south of US 302/NH 16 intersection to Zodiac
(Barnes) Way, including driveway consolidation
(b) NH 101/51 Exeter-Stratham- Landscape west of NH 108 to east of Guinea Road
Hampton (approx 1.2 mi) and east of Guinea Road to
12197 D east of I-95 (approx. 4.7 mi)
(c) NH 9 Hillsborough Construct bypass from east of NH 31 to west
10440 E interchange including Beards Brook Crossing and
Bible Hill Road and construct NH 31 intersection
(d) NH 101 Keene - Swanzey Reconstruct Optical Avenue & NH 32
10309 C
(e) US 3 Meredith Widen & signalize Parade Road intersection
11386
(f) Spaulding Rochester Construction of exit 11/12 bridges
Tpk 10620 D Phase 1 and 2nd barrel - phase 1
(g) Various Statewide Pavement marking (annual project)
12223
II. In federal fiscal year 2002:
(a) Airport Bedford-Manchester Improve access from F.E.E.T. to Manchester
Access Rd Londonderry Airport and surrounding area
11512
(b) NH 11 Claremont-Newport Reconstruction urban compact line
10433 to Kelleyville Bridge, approximately 3.8 miles
(c) US 302 Conway Construction & roadway improvements from just
& NH 16 11339 I north of Memorial Hospital to NH 16 in
Bartlett; signalize @ NH 16
(d) Various Statewide Pavement marking (annual project)
12223
(e) NH 16/ Newington - Dover Widen turnpike including Little Bay
US 4/ 11238 bridges from Gosling Road to Dover toll
Spldg Tpk
III. In federal fiscal year 2003:
(a) Airport Bedford-Manchester- Improve access from F.E.E.T. to
Access Rd Londonderry Manchester airport and surrounding
11512 area
(b) NH 16 Conway Conway bypass - construction of
11339 J southern segment
(c) NH 101 Keene - Swanzey Reconstruct "SPDI" EB & WB ramps
10309 D
(d) NH 101 Keene-Swanzey Reconstruct Main Street & NH 12/101
10309 E
(e) Spaulding Rochester Construction of exit 11/12, & 2nd
Tpk 10620 D phase 2 barrel to exit 13 - phase 2
(f) Spaulding Rochester Construction of 2nd barrel between
Tpk 10620 D phase 3 exit 13 to exit 14 - phase 3
(g) Various Statewide Pavement marking (annual project)
12223
(h) NH 111 Windham - Salem Construct bypass around Shadow Lake
10075
IV. In federal fiscal year 2004:
(a) NH 16 Conway Conway bypass - construction of
11339 J southern segment
(b) NH 16 Gorham Reconstruct from just north of
10438 Martins Location north 1.1 miles
(c) NH 101 Keene - Swanzey Reconstruction "SPDI" mainline &
10309 F Trumphet interchange
(d) Spaulding Rochester Construction of 2nd barrel between
Tpk 10620 D phase 4 exit 14 to exit 15 - phase 4
(e) Various Statewide Pavement marking (annual project)
12223
(f) NH 12 Troy Bypass of Troy Village
10434
V. In federal fiscal year 2005:
(a) NH 16 Conway Conway bypass - construction of
11339 K northern segment
(b) NH 16 Conway Conway bypass - landscape southern
11339 O segment
(c) NH 101 Keene - Swanzey Reconstruct West Street interchange
10309 G
(d) NH 16 Ossipee Reconstruction from NH 28 north 3.36 miles
10431
(e) Spaulding Rochester Construction of 2nd barrel between exit 15 to
Tpk 10620 D phase 5 exit 16 - phase 5
(f) NH 9 Roxbury - Sullivan Reconstruct from East Sullivan, south 2.04 mi
10439
(g) Various Statewide Pavement marking (annual project)
12223
(h) NH 12 Troy Bypass of Troy Village
10434
(i) NH 111 Windham - Salem Construct bypass around Shadow Lake
10075
VI. In federal fiscal year 2006:
(a) NH 16 Albany Reconstruction from just north of
10437 Madison T/L south 3.79 miles
(b) NH 16 Conway Conway bypass - construction of
11339 L central segment
(c) NH 16 Conway Conway bypass - landscape northern
11339 P segment
(d) NH 101 Keene - Swanzey Reconstruction "SPDI" mainline &
10309 F Trumphet interchange
(e) NH 25 / Moultonborough Reconstruct intersection and roadway from
NH 109 intersection of NH 109 north and roadway from
that intersection to school
(f) I-93 Salem - Manchester Widening from exit 2 northerly to
10418 A exit 4 (NH 102)
(g) Various Statewide Pavement marking (annual project)
12223
VII. In federal fiscal year 2007:
(a) NH 16 Conway Conway bypass - construction of US
11339 M 302 interchange
(b) NH 16 Conway Conway bypass - landscape central
11339 Q segment
(c) NH 12 Fitzwilliam Reconstruct intersection @ NH 119 for safety
improvement
(d) NH 101A Milford to Nashua Roadway improvements @ various
10136 locations to be identified by monitoring
(e) NH 16 & Ossipee Improvements in West Ossipee
NH 25
(f) NH 101 Peterborough Reconstruct intersection @ NH 123/Old Stage Rd
(g) US 2 Randolph Upgrade and reconstruct portions from Lowe's
westerly to the Jefferson town line
(h) I-93 Salem-Manchester Widening from exit 4 northerly to I-293
10418 B
(i) Various Statewide Pavement marking (annual project)
12223
VIII. In federal fiscal year 2008:
(a) US 302 Bath - Lisbon Reconstruction, from NH 112 north
10425 8.89 miles to Lisbon
(b) NH 106 Belmont - Laconia Reconstruct from 0.4 miles north of US 3 / NH 11
bypass southerly into Belmont south of Opechee
plaza
(c) NH 16 Conway Conway bypass - construction of NH 153
11339 N interchange
(d) US 2 Jefferson Safety and geometric improvements between
Randolph town line westerly to NH 115
intersection in Jefferson
(e) NH 101A Milford to Nashua Roadway improvements @ various
10136 locations to be identified by monitoring
(f) NH 16/25 Ossipee Reconstruct roadway and 4 bridges, beginning at
the Lovell River Bridge, running north 3.22 miles
to the Chocorua River - 152/268, 137/297, 137/299,
123/324
(g) Various Statewide Pavement marking (annual project)
12223
IX. In federal fiscal year 2009:
(a) US 302 Bath - Lisbon Reconstruction, from NH 112 north
10425 8.89 miles to Lisbon
(b) US 3 Laconia - Meredith Rehabilitate & add shoulders (3.7 mi)
(c) NH 25 Moultonborough Reconstruction from Moultonborough Neck Road
easterly 3.5 miles to NH 109 south
(d) NH 16 / Newington - Dover Widen turnpike including Little Bay bridges from
US 4 / 11238 Gosling Road to Dover toll
Spldg Tpk
(e) NH 125 Plaistow Widening for center turn lane from the
Massachusetts S/L to Westville Bridge
(f) Various Statewide Pavement marking (annual project)
12223
(g) NH 101 Wilton - Milford - Safety improvements @ various locations from
Amherst - Bedford Wilton to Wallace Rd in Bedford
X. In federal fiscal year 2010:
(a) US 302 Harts Location Rehabilitate & upgrade from Carroll/Harts
Location T/L easterly approx. 1.5 miles
(b) Fee Tpk Manchester Reconstruct interchange at exit 7 to become full
interchange
(c) NH 16/ Newington - Dover Widen turnpike including Little Bay
US 4/ 11238 bridges from Gosling Road to Dover toll
Spldg Tpk
(d) Various Statewide Pavement marking (annual project)
12223
240:4 Bridge Replacement On-System. Bridge replacement on-system projects shall be as follows:
ROUTE/ROAD PROJECT NAME/NUMBER DESCRIPTION/IMPROVEMENT
I. In federal fiscal year 2001:
(a) NH 28 Auburn Replace bridge over Massabesic Lake -070/102
Bypass 12596
(b) NH 9 Chesterfield, NH - Replace Chesterfield Bridge over
Brattleboro, VT Connecticut River - 040/095 (present#)
11999
(c) NH 135 Haverhill - Bath Rehabilitation of Woodsville covered
13095 bridge (072/063) - [98-74TE]
II. In federal fiscal year 2002:
(a) US 4 Canaan Replace bridge over Mascoma River -
12870 137/061
(b) NH 25 Effingham - Freedom Replace bridge over Ossipee River -
12362 136/183
(c) US 302 Haverhill, NH - Rehab bridge over Connecticut River
Newbury, VT - 219/178
12363
(d) NH 25 Ossipee Replace bridge over Bear Camp River -
12773 114/329 and reconstruct approaches
(e) NH 32 Swanzey Replace bridge over Ashuelot River -
12775 146/129
III. In federal fiscal year 2003:
(a) NH 26 Colebrook Replace bridge over Balsam Pond outlet
13255 - 202/059 and over Mohawk River, 0.5 mile from
Dixville T/L - 201/062
(b) NH 26 Colebrook Replace bridge over Mohawk River -
13256 177/068, 3 mi from Dixville T/L
(c) NH 119 Hinsdale, NH - Replace 2 bridges over Connecticut
Brattleboro, VT River - 041/040 & 042/044
12210
(d) NH 155 Madbury Replace bridge over B & M RR -
12922 114/084
(e) Kingston Plaistow Replace bridge over B & M RR - 137/115
Road 10005
(f) NH 121 Plaistow Replace bridge over Little River &
12359 B&M RR - 105/028
(g) NH 33 Portsmouth Replace bridge over B & M RR - 154/101
(Old NH101) 10665
(h) NH 28 Wolfeboro Replace bridge over Smith River -
12358 112/110
IV. In federal fiscal year 2004:
(a) US 3 Allenstown Replace bridge over Local Road &
12361 Suncook River - 069/056
(b) US 4 Boscawen - Bridge widen(shoulders) and rehabilitation
Canterbury over Merrimack River - 142/038
13029
(c) NH 25 Warren Replace bridge over Baker River -
11847 109/048
V. In federal fiscal year 2005:
(a) US 302 Bartlett Replace bridge over MCRR - 188/123 &
13043 over Saco River - 189/129
(b) NH 26 Colebrook Bridge rehabilitation over Mohawk River -
147/068
(c) Sewalls Concord Replace bridge over Merrimack River
Falls Road 12004 - 070/117
VI. In federal fiscal year 2006:
(a) US 1 Portsmouth Rehab bridge @ Maplewood Ave over
bypass 12900 US 1 bypass - 227/112
(b) US 1 Portsmouth Rehab bridge @ Stark Street over US 1
bypass 12902 bypass - 211/114
(c) NH 1A Rye Replace bridge over Seavey's Creek -
13269 252/156
(d) NH 12 Walpole Bridge rehabilitation over Cold River
12904 - 082/065
(e) Bridge St Walpole, NH - Bridge rehabilitation over
Bellows Falls, VT Connecticut River - 062/052
12905
VII. In federal fiscal year 2007:
(a) US 4/ Lebanon Bridge replacement over Mascoma River
NHRR - 188/126 near intersection of US 4 and NH 4A
VIII. In federal fiscal year 2008:
(a) NH 10 Winchester Bridge replacement over Ashuelot River
12906 - 152/181
IX. In federal fiscal year 2009:
(a) US 4 Lebanon, NH - Rehabilitate and widen bridge over
Hartford, VT Connecticut River - 058/127
(b) NH 123 New Ipswich Replace bridge over Souhegan River -
/124 157/093
X. In federal fiscal year 2010:
(a) US 1 Portsmouth, NH - Rehabilitate and paint bridge over Kittery, ME
Piscataqua River - 247/084 (Memorial Bridge)
240:5 Bridge Replacement Off-System. Bridge replacement off-system (state) projects shall be as follows:
ROUTE/ROAD PROJECT NAME/NUMBER DESCRIPTION/IMPROVEMENT
I. In federal fiscal year 2001:
(a) Shaker Enfield Replace bridge over Mascoma River -
Hill Road 10652 083/156
(b) Staniels Loudon Near the intersection of NH 106, relocation and
Road 13207 bridge replacement - 044/048
II. In federal fiscal year 2002:
(a) NH 87 Epping Replace bridge over Lamprey River -
13057 151/069
(b) Barnet Monroe, NH - Rehab bridge over the Connecticut River
Road Barnet, VT 10648 - 110/125
(c) Main St Pembroke Replace bridge over Suncook River -
12978 203/088
III. In federal fiscal year 2003:
(a) South Enfield Replace bridge over Mascoma Lake -
Main St 12967 077/139
(b) NH 175A Holderness-Plymouth Replace bridge (Bridge St) over Pemi River
11849 - 046/139 & approaches
IV. In federal fiscal year 2004:
(a) NH 145 Clarksville Replace bridge over Connecticut River
13028 - 090/120
240:6 Safety Projects. Safety projects shall be as follows:
ROUTE/ROAD PROJECT NAME/NUMBER DESCRIPTION/IMPROVEMENT
I. In federal fiscal year 2002:
(a) US 4 Northwood Sight distance safety improvements @
11143 contract 2 Bow Lake Road intersection
II. In federal fiscal year 2003:
(a) US 4 Northwood - Intersection safety improvement @ NH 152
Nottingham
10429 E
III. In federal fiscal year 2005:
(a) NH 63 Chesterfield Reconstruct to improve safety
adjacent to Spofford Lake
IV. In federal fiscal year 2006:
(a) US 4 Nottingham Safety improvements eastbound passing lane
11140
V. In federal fiscal year 2008:
(a) NH 3A Bow to Manchester Safety improvements, including shoulder
widenings & intersection improvements @ various
locations
VI. In federal fiscal year 2009:
(a) US 3 Woodstock Safety and pavement improvements to
upgrade US 3
240:7 Any Area Projects. Any area projects shall be as follows:
ROUTE/ROAD PROJECT NAME/NUMBER DESCRIPTION/IMPROVEMENT
I. In federal fiscal year 2001:
(a) NH 28 Alton Widen shoulders, reclaim and 3" overlay from
12894 traffic circle north (2.0 mi) - FY 2001 statewide
res/rec/cs prog
(b) NH 114 Bradford-Henniker Level and 1" overlay from NH 103 intersection to
12892 US 202 (6.3 mi) - FY 2001 statewide res/rec/cs prog
(c) NH 11 Farmington/ Alton - Widen shoulders, level and 1" overlay
Rochester (Farmington 1.0 mi), upgrade guardrail
13293 (Alton-Rochester 14 mi) - FY 2001 statewide
res/rec/cs prog
(d) NH 116 Littleton-Bethlehem Reclaim & 3" overlay from Sampson Road east to
12873 west of Wing Road (3.77 mi) - FY 2001 statewide
res/rec/cs prog
(e) US 4, Northwood-Nottghm Level and 1" overlay US 4 (Northwood-Nottingham
NH 33, Grnlnd-Strathm/ 3.39 mi), NH 33 (Greenland-Stratham 2.92 mi),
NH 111, Seabrk/ Hampstead NH 286 (Seabrook 2.36 mi), NH 111 (Hampstead
NH 286 12888 0.45 mi) - FY 2001 statewide res/rec/cs prog
(f) NH 38 Pelham Reclaim & 3" overlay (1.5 mi) and level & 1"
12867 overlay (1.52 mi), from Mass. S/L north 3.02 mi. -
FY 2001 statewide res/rec/cs prog
(g) NH 3A Plymouth Rubblize & 3" overlay from S. of the traffic circle
12884 south (1.3 mi) - FY 2001 statewide res/rec/cs prog
(h) Various Statewide Update signing on state system
(i) Various Summer Youth Establishment of summer landscaping youth
Landscape Program program to perform maintenance & other related
12500 work statewide
(j) NH 12 Walpole Level and 1" overlay, from Church Street to
12895 1.6 mi south of NH 123 (3.3 mi) - FY 2001
statewide res/rec/cs prog
(k) NH 101 Wilton - Milford Recl. & 3" overlay (1.0 mi) & level & 1" overlay
13292 (2.0 mi) from NH 31 south E. to RR crossing - FY
2001 statewide res/rec/cs prog
II. In federal fiscal year 2002:
(a) NH 28 Alton Widen shoulders and reclaim and 3" overlay from
2.0 mi n. of Alton traffic circle to NH 28A-FY 2002
statewide res/rec/cs program
(b) US 3 Bethlehem - Carroll Level and 2" overlay from Gale River proj. E. to
12883 Ammonoosuc River (5.14 mi) - FY 2002 statewide
res/rec/cs prog
(c) NH 112 Lincoln Widen shoulders for bicycles and level and 1"
overlay from Pollard Br. E. to E. Br. Pemi. River
(3.58 mi) - FY 2002 statewide res/rec/cs prog
(d) NH 12, Marlborough-Troy/ Level and 1" overlay NH 12 (Marlborough- Troy
NH 123, Sharon-New Ipswich 2.95 mi), NH 123/124 (Sharon-New Ipswich 4.3
mi)
NH 124 - FY 2002 statewide res/rec/cs prog
(e) NH 101A Milford - Merrimack Replace TW pave, 1" overlay full width from W. of
12887 NH 101 intersection E. to Nashua T/L (4.0 mi) -
FY 2002 statewide res/rec/cs prog
(f) Broad St Nashua Construction from Nashua River westerly to
Parkway 10040 H Broad Street (to subgrade only) including Baldwin
Street ped bridge
(g) Broad St Nashua Construction from West Hollis Street to Pine
Parkway 10040J Street extension including bridge over canal
(h) Broad St Nashua base courses, wearing courses, signing,
Parkway 10040K markings, RR X-ing, and signals
(i) US 4, Nottingham - Level and 1" overlay US 4 (Nottingham-Lee
NH 125 Lee NH 125 (Lee 4.0 mi) - res/rec/cs prog
12897
(j) Various Statewide Update signing on state system
(k) Various Summer Youth Establishment of summer landscaping youth
Landscape Program program to perform maintenance & other
12500 related work statewide
III. In federal fiscal year 2003:
(a) NH 28 Alton Reclaim & 3" overlay from NH 28A N to
Wolfeboro T/L (4.1 mi) - FY 2003 statewide
res/rec/cs prog
(b) US 1 Hampton Falls - Level and 1" overlay from Seabrook
N. Hampton N to compact (Hampton Falls-Hampton 2.4 mi),
from compact to Juniper Ln (Hampton-N.
Hampton 2.4 mi) - FY 2003 statewide res/rec/cs
prog
(c) NH 9, Keene / Rubbilize and 3" overlay NH 101, from Branch
NH 101 Hillsborough - Rd E. to T/L (Keene 1.1 mi) and reclaim and 3"
Antrim overlay NH 9, from end of bypass W. to NH 31 S
(Hillsborough - Antrim 3.5 mi) - FY 2003
statewide res/rec/cs prog
(d) NH 112 Lincoln Level and 1" overlay from E. br. Pemi. River E. to
Hancock Brook Bridge (4.47 mi) - FY 2003
statewide res/rec/cs prog
(e) US 3 Merrimack - Level and 1" overlay from Bedford Rd. N. to S. of
Bedford NH 101 (5.11 mi) - FY 2003 statewide res/rec/cs
prog
(f) Broad Nashua Project wide landscaping
Street 10040L
Parkway
(g) NH 110, Northumberland / Reclaim & 3" overlay NH 110, from US 3
US 2 Lancaster E. to RR overpass (Northumberland 1 mi),
reclaim and 3" overlay US 2, from US 3
easterly (Lancaster 1.33 mi) - FY 2003
statewide res/rec/cs prog
(h) Various Statewide Update signing on state system
(i) Various Summer Youth Establishment of summer landscaping
Landscape Program youth program to perform maintenance
12500 & other related work statewide
(j) NH 25 Wentworth - Reclaim & 3" overlay from NH 118 S. to
Warren Turner Rd. (6.3 mi) - FY 2003 statewide
res/rec/cs prog
(k) NH 111 Windham - Salem Construct bypass around Shadow Lake
10075
IV. In federal fiscal year 2004:
(a) NH 9 Antrim - Stoddard Reclaim and 3" overlay from NH 31 SW.
to 1995 fed. resurf. (6 mi) - FY 2004
statewide res/rec/cs prog
(b) NH 114 Bedford - Goffstown Level and 1" overlay from NH 101 N. to
NH 114A (3.28 mi) - FY 2004 statewide
res/rec/cs prog
(c) NH 10, Claremont/ Rubbilize and 3" overlay NH 103, from S/L E. to
NH 103 Newport- Redwater Br. (Claremont 1.4 mi) and level and
Croydon 1" overlay NH 10, from NH 11 N. to Croydon
Flats (Newport-Croydon 3.8 mi) - FY 2004
statewide res/rec/cs prog
(d) NH 124 Greenville - Reconstruct from Mascenic Regional
New Ipswich School southerly - 1.4 miles
S3168
(e) NH 101 Hampton / Level and 1" overlay from Towle Farm Rd E. to E.
Portsmouth of US 1 byp (Hampton 1.5 mi) and from traffic
circle E. to Channel Plaza (Portsmouth 2 mi)
- FY 2004 statewide res/rec/cs prog
(f) NH 112 Lincoln Reclaim and 3" overlay from Hancock Brook
Bridge E. to Livermore T/L (3.76 mi) -
FY 2004 statewide res/rec/cs prog
(g) NH 25 Ossipee - Level and 1" overlay from NH 16/25 E. to 12362
Effingham project (6.34 mi) - FY 2004 statewide res/rec/cs
prog
(h) I-93 Salem - Widening from mass S/L north 4.5 miles including
Manchester Exit 1 & 2 & Pelham Road including bridges
10418
(i) Various Statewide Update signing on state system
(j) Various Summer Youth Establishment of summer landscaping youth
Landscape program to perform maintenance & other related
Program work statewide
12500
(k) NH 111 Windham - Salem Construct bypass around Shadow Lake
10075
(l) NH 111/ Windham - Salem Reconstruction @ Lake Street
NH 28 10075B
V. In federal fiscal year 2005:
(a) NH 10 Croydon - Level and 1" overlay from Croydon Flats N to
Grantham N of I-89 (7.13 mi) - FY 2005 statewide res/rec/cs
prog
(b) NH 26, Dixville- Reclaim and 3" overlay NH 26, from Dix./Mills.
T/L
NH 110 Errol/Milan E. to1 mi E. of Err./Mills. T/L (Dixville-Errol
2.79 mi) and level and 1" overlay NH 110, from
Berlin T/L N. to end of 1995 recl proj. (Milan
3.06 mi) -FY 2005 statewide res/rec/cs prog
(c) US 4, Epsom-Northwood/N. Level and 1" overlay US 4, from NH 107 E. to
US 1, Hampton/Lee- Ridge Rd (Epsom-Northwood NH 125 3.8 mi), US
NH 125 Barrington 1, from Juniper Ln N. to Rye T/L (N. Hampton
1 mi), NH 125, from traffic circle to S of NH 9
(Lee-Barrington 3.7 mi) - FY 2005 statewide
res/rec/cs prog
(d) NH 102 Hudson - Level and 1" overlay from NH 3A E. to Buttrick
Rd
Londonderry (6.24 mi) - FY 2005 statewide res/rec/cs prog
(e) NH 12 Keene - Surry Level and 1" overlay from 1994 fed res. N. to
Westmoreland T/L (5 mi) - FY 2005 statewide
res/rec/cs prog
(f) NH 125 Plaistow - Reconstruction from East Road in Plaistow
Kingston northerly approx. 6.0 +/- mile to NH 125 & Main
10044B Street intersection in Kingston, including the
intersection of NH 125 with Newton
Junction/Hunt Rd
(g) Various Statewide Update signing on state system
(h) Various Summer Youth Establishment of summer landscaping youth
Landscape Program program to perform maintenance & other related
12500 work statewide
(i) US 3 Tilton - Rubbilize and 3" overlay from E. of outlet mall E.
Sanbornton to Mesquito Br. (4 mi.) - FY 2005 statewide
res/rec/cs prog
VI. In federal fiscal year 2006:
(a) Various Statewide Update signing on state system
(b) Various Statewide Pavement resurfacing, rehabilitation &
33D-PRR crack seal program (annual project)
(c) Various Summer Youth Establishment of summer landscaping youth
Landscape Program program to perform maintenance & other
12500 related work statewide
VII. In federal fiscal year 2007:
(a) US 4 Andover Reconstruct approximately 2.0 miles
from Salisbury T/L westerly
(b) Various Statewide Update signing on state system
(c) Various Statewide Pavement resurfacing, rehabilitation
33D-PRR & crack seal program (annual project)
(d) Various Summer Youth Establishment of summer landscaping
Landscape Program youth program to perform maintenance
12500 & other related work statewide
VIII. In federal fiscal year 2008:
(a) US 302 Lisbon Rehabilitate, beginning 1100 ft north of Perch
Pond Road northerly 4 miles
(b) Various Statewide Update signing on state system
(c) Various Statewide Pavement resurfacing, rehabilitation & crack seal
33D-PRR program (annual project)
(d) Various Summer Youth Establishment of summer landscaping youth
Landscape Program program to perform maintenance & other
12500 related work statewide
(e) NH 111 Windham - Salem Reconstruction & signalization @ North
10075A Policy Road
IX. In federal fiscal year 2009:
(a) Various Statewide Update signing on state system
(b) Various Statewide Pavement resurfacing, rehabilitation & crack seal
33D-PRR program (annual project)
(c) Various Summer Youth Establishment of summer landscaping youth
Landscape Program program to perform maintenance & other
12500 related work statewide
X. In federal fiscal year 2010:
(a) Various Statewide Update signing on state system
(b) Various Statewide Pavement resurfacing, rehabilitation & crack seal
33D-PRR program (annual project)
(c) Various Summer Youth Establishment of summer landscaping youth
Landscape Program program to perform maintenance & other related
12500 work statewide
240:8 Non-Urban Areas. Non-Urban Areas projects shall be as follows:
ROUTE/ROAD PROJECT NAME/NUMBER DESCRIPTION/IMPROVEMENT
I. In federal fiscal year 2001:
(a) NH 112 Easton - Begin @ NH 116, roadway and safety
Woodstock improvements for 3.2 miles east,
12971 including reconstruction of 1.0 mile
to improve the alignment, drainage, & roadbase.
(b) NH 9 Hillsborough Construct bypass from east of NH 31
10440E to west interchange including
Beards Brook Crossing and Bible Hill
Road and construct NH 31 intersection
(c) Staniels Loudon Near the intersection of NH 106,
Road 13207 relocation and bridge replacement - 044/048
(d) Various Statewide Pavement marking (annual project)
12223
II. In federal fiscal year 2002:
(a) NH 103 Newbury - Level and 1" overlay from traffic
Bradford circle to Sutton T/L (10.4 mi) - FY 2002
12893 statewide res/rec/cs prog
(b) Various Statewide Pavement marking (annual project)
12223
(c) US 3 Whitefield Reconstruct from Carroll T/L north
P2953 2.1 miles
III. In federal fiscal year 2003:
(a) Various Statewide Pavement marking (annual project)
12223
IV. In federal fiscal year 2004:
(a) NH 124 Greenville - Reconstruct from Mascenic Regional
New Ipswich School southerly - 1.4 miles
S3168
(b) Various Statewide Pavement marking (annual project)
12223
V. In federal fiscal year 2005:
(a) Various Statewide Pavement marking (annual project)
12223
VI. In federal fiscal year 2006:
(a) Various Statewide Pavement marking (annual project)
12223
VII. In federal fiscal year 2007:
(a) NH 12 Charlestown Reconstruction from NH 12A to Walpole T/L
including removal of concrete underbase,
widen/pave shoulders along this corridor, and
upgrade of storm drainage system
(b) Albuquer Litchfield Construct .3 mile segment from April
-que Drive to NH 3A, including intersection
Ave improvements @ NH 3A
(c) NH 25 Meredith Reconstruction from Center Harbor
10430 T/L south 3.24 miles to US 3
(d) Various Statewide Pavement marking (annual project)
12223
(e) NH 28 Wolfeboro Improve roadway, intersections, and
drainage from the Alton T/L to Wolfeboro Falls
VIII. In federal fiscal year 2008:
(a) Various Statewide Pavement marking (annual project)
12223
IX. In federal fiscal year 2009:
(a) Various Statewide Pavement marking (annual project)
12223
(b) US 3 Stratford Reconstruction & widening from end
of betterment project northerly 6.0
miles
X. In federal fiscal year 2010:
(a) NH 16 Dummer - Widen & rehabilitate from Errol southerly
Cambridge 10 miles
Errol
(b) Various Statewide Pavement marking (annual project)
12223
(c) NH 10 Winchester Reconstruct/rehabilitate from Mass
S/L to NH 119 (Manning Hill) 5.1 miles
240:9 State Project;. Urban Areas Less Than 200,000. State projects in urban areas with a
population less than 200,000 shall be as follows:
ROUTE/ROAD PROJECT NAME/ NUMBER DESCRIPTION/IMPROVEMENT
I. In federal fiscal year 2001:
(a) US 3 Bedford Landscaping for intersection
12317 improvement @ Back River Road
Contract 2
(b) US 3 / Belmont Add left turn lanes & new signal @
NH 11 12620 Union Road (US 3 corridor improvements)
(c) Various Statewide Pavement marking (annual project)
12223
II. In federal fiscal year 2002:
(a) NH 101 Bedford Construct WB-on & WB-off ramps
10018C from NH 101 to Kilton Road & bridge
Contract 1 replacement
(b) NH 101 Keene - Swanzey Reconstruct Winchester Street
10309B
(c) NH 101 Manchester - Rehab from I-93 East to Severence Brook
Auburn
12609
(d) US 202 Peterborough Reconstruction of 2 miles from
12915 Southfield Lane to Hancock T/L
(e) NH 1B Portsmouth Reconstruction of New Castle Ave (NH 1B)
from Marcy Street to bridge over
Piscataqua River inlet
(f) Various Statewide Pavement marking (annual project)
12223
III. In federal fiscal year 2003:
(a) US 3 Bedford Landscaping Kilton Road, US 3, berm
10018C Along NH 101 on ramp, drainage basins
Contract 2
(b) NH Milford to Nashua Roadway improvements @ various
101A 10136 locations to be identified by monitoring
(c) Various Statewide Pavement marking (annual project)
12223
IV. In federal fiscal year 2004:
(a) US 302 Bath - Lisbon Reconstruction, from NH 112 north
10425 8.89 miles to Lisbon
(b) US 3 / Belmont Add turn lanes, & new signals in
NH 11 12916 vicinity of the Belknap Mall (US 3
corridor improvements)
(c) US 302 Haverhill Reconstruction from junction @ NH
10436 10 northerly approximately 1 mile
(d) Monument Hollis Reconstruction of Monument Square
Square area to provide separated one-way
segments
(e) NH 130 Hollis Reconstruct intersection @ Broad
(Ash Street) Street
(f) Various Statewide Pavement marking (annual project)
12223
V. In federal fiscal year 2005:
(a) US 3 Northumberland Reconstruction, south from
12990 Stratford T/L, 1.4 miles
(b) Various Statewide Pavement marking (annual project)
12223
(c) US 3 / Tilton Relocate Clark Road & Town Plaza
NH 11 entrance, geometric improvements, &
new signal (US 3 corridor improvements)
VI. In federal fiscal year 2006:
(a) NH 11 Alton - Gilford Reconstruction near Ellocoya State
10606 Park southeast 4.75 miles to Minge
Brook
(b) NH 140 Belmont Bypass study and construct bypass
12792 of Belmont Village from Tilton to NH 106
(c) NH 26 Colebrook Reconstruct from 3 miles west of
P2493C Dixville T/L easterly 2.5 miles
(d) NH 101 Keene Reconstruct from Branch Road west
13251 0.9 miles
(e) NH 101A Milford to Nashua Roadway improvements @ various
10136 locations to be identified by monitoring
(f) US 1 Portsmouth Reconstruct from Sagamore Creek project
Bypass to traffic circle, including bridges
173/071, 183/087, 188/097, 188/100, 192/106
(g) Various Statewide Pavement marking (annual project)
12223
VII. In federal fiscal year 2007:
(a) US 302 Bath - Lisbon Reconstruction, from NH 112 north
10425 8.89 miles to Lisbon
(b) NH 101 Bedford Widen to 5 lanes for approximately 2
miles, from Constitution Drive to Wallace Road,
including appropriate pedestrian facilities
(c) US 4 Boscawen Reconstruct intersection @ Goodhue Road and
Raymond Road
(d) NH 125 Epping Reconstruction from Brentwood T/L
to NH 87
(e) NH 25 Meredith Reconstruction from Center Harbor
10430 T/L south 3.24 miles to US 3
(f) US 1 Portsmouth Intersection @ Constitution Ave and
roadway improvements
(g) Various Statewide Pavement marking (annual project)
12223
VIII. In federal fiscal year 2008:
(a) US 202 Peterborough Reconstruct from NH 101 northerly
2.5 miles
(b) Various Statewide Pavement marking (annual project)
12223
IX. In federal fiscal year 2009:
(a) US 302 Bath - Lisbon Reconstruction, from NH 112 north
10425 8.89 miles to Lisbon
(b) NH 102 Hudson West Road intersection: widen for
turn lanes, signals, & truck lane
(c) NH 10 Newport - Goshen - Reconstruct/rehabilitate from
Lempster - Marlow Newport to NH 123A in Marlow (15 mi)
(d) Various Statewide Pavement marking (annual project)
12223
X. In federal fiscal year 2010:
(a) NH 28 Barnstead - Alton Reconstruction from end of improved section in
Barnstead to Alton traffic circle
(b) NH 33 Greenland Intersection improvements @ Ocean Road, adding
additional turning and through lanes
(c) Various Statewide Pavement marking (annual project)
12223
240:10 Turnpike. Turnpike projects shall be as follows:
ROUTE/ROAD PROJECT NAME/NUMBER DESCRIPTION/IMPROVEMENT
I. In federal fiscal year 2001:
(a) Circum- Litchfield - Nashua Construct northern river crossing
ferential 10625 H over Merrimack River, 2 bridges - phase 1
Hwy
II. In federal fiscal year 2002:
(a) Spaulding Dover - Rochester - Construction of exit 10 and easterly
Tpk Somersworth connection
11429 A
(b) Circum- Merrimack - Nashua Construct bridges (4), mainline &
ferential 10625 I ramps over Pennichuck Brook - phase 1
Hwy
III. In federal fiscal year 2003:
(a) Spldg Tpk Dover - Rochester - Construction of exit 10 and easterly
Somersworth connection
11429 A
(b) Circum- Hudson Mitigation - Benson's - phases 1, 2, & 3
ferential 10625 O
Hwy
(c) Circum- Litchfield - Hudson Construct mainline, ramps, toll
ferential 10625 K booth, NH 3A improvements, boat ramp
Hwy access road - phase 1
(d) FEE Tpk Manchester Construction of Granite Street
10622 interchange
(e) Circum- Merrimack Construct mainline, US 3 to exit 9 &
ferential 10625 N bridges (2) - phase 1
Hwy
(f) Circum- Merrimack - Nashua Construct for NHCH & FEE Tpk:
ferential 10625 M mainline, ramps, & bridges (5) @ exit 9
Hwy interchange - phase 1
(g) Circum- Nashua - Merrimack Construct mainline, ramps, US 3
ferential 10625 L roadway improvements & bridges (2) -
Hwy phase 1
IV. In federal fiscal year 2004:
(a) Spldg Tpk Dover - Rochester - Construction of exit 10 and easterly
Somersworth connection
11429 A
(b) Circum- Hudson Mitigation - Benson's - phases 1, 2, & 3
ferential 10625 O
Hwy
(c) FEE Manchester Construction of Granite Street
Tpk 10622 interchange
V. In federal fiscal year 2005:
(a) Circum- Hudson Mitigation - Benson's - phases 1, 2, & 3
ferential 10625 O
Hwy
(b) Circum- Hudson Construct bridges (5), Old Derry
ferential 10625 Q Road, Barrett's Hill Road, Glover
Hwy Brook - phase 3
(c) Circum- Litchfield - Hudson Construct mainline & ramps from NH
ferential 10625 P 3A to NH 102 - phase 2
Hwy
VI. In federal fiscal year 2006:
(a) Circum- Hudson Mitigation - Benson's - phases 1, 2, & 3
ferential 10625 O
Hwy
(b) Circum- Hudson Construct mainline & ramps, NH 102 to
ferential 10625 R NH 111, & roadway @ NH 111 - phase 3
Hwy
309:2 Budget Footnote Added. Amend 1999, 159:1.04, 01, 01, 01 as follows:
Strike out: FY 2000 FY 2000
92 Maintenance - critical repairs 425,000 425,000
Insert in place thereof:
92 Maintenance - critical repairs F 425,000 425,000
309:3 Committee Established. There is established a committee to study the priority and funding of projects included in the 10-year transportation plan, established under RSA 240.
309:4 Membership and Compensation.
I. The members of the committee shall be as follows:
(a) Four members of the house of representatives, including a member of the house public works and highway committee and a member of the house finance committee, appointed by the speaker of the house.
(b) Four members of the senate, appointed by the president of the senate.
II. The committee shall solicit information from the commissioner of the department of transportation and from any other relevant source.
III. Members of the committee shall receive mileage at the legislative rate when attending to the duties of the committee.
309:5 Duties. The committee shall study the priority and funding of projects included in the 10-year transportation plan, established under RSA 240. The committee's study shall also include the policy of using federal funds for turnpike projects.
309:6 Chairperson; Quorum. The members of the study committee shall elect a chairperson from among the members. The first meeting of the committee shall be called by the first-named house member. The first meeting of the committee shall be held within 45 days of the effective date of this section. Five members of the committee shall constitute a quorum.
309:7 Report. The committee shall report its findings and any recommendations for proposed legislation to the speaker of the house of representatives, the senate president, the house clerk, the senate clerk, the governor, and the state library on or before November 1, 2000.
309:8 Statement of Intent. The general court recognizes that building additional toll booths create safety concerns and pollution issues. The general court also recognizes that more toll booths detract from the New Hampshire scenery and negatively impact the New Hampshire tourism industry.
309:9 Proposed Toll Booths Eliminated. The department of transportation shall eliminate the proposed toll booths for the city of Nashua.
309:10 Alternatives to Toll Booth System Required; Department of Transportation. The commissioner of the department of transportation shall recommend alternatives to the statewide toll booth system. The commissioner shall submit a report on or before November 1, 2000 with recommendations for legislation to the senate president, the speaker of the house, the chairpersons of the senate and house transportation committees, and the governor.
309:11 Proposed Toll Booth. Amend RSA 237:2, VII to read as follows:
VII. Acquire land as required and make improvements to the central New Hampshire turnpike including, but not limited to, completing the connection to the Merrimack industrial interchange, relocation of Camp Sargent Road, improvements to interchanges 3 through 7 as required, the extension of the system to include an easterly circumferential beltway around Nashua extending from exit 2 and running easterly through the city of Nashua and the towns of Hudson, Litchfield, and Merrimack to an intersection with the existing turnpike, improvements and widening between interchanges 2 and 7, widening between the Route 101 intersection and the Amoskeag interchange in Manchester, and coordinating a study of widening between the I-89 and I-93 interchanges[, and the establishment of a toll station southbound in the vicinity of Nashua and the Massachusetts state line].
309:12 Effective Date.
I. Section 1 of this act shall take effect 60 days after its passage.
II. The remainder of this act shall take effect upon its passage.
(Approved: June 21, 2000)
(Effective Date: I. Section 1 shall take effect August 20, 2000
II. Remainder shall take effect June 21, 2000)
LBAO
00-2808
Amended 5/16/00
HB 2000 FISCAL NOTE
AN ACT relative to a 10-year transportation plan and establishing a committee to study the transportation plan projects.
FISCAL IMPACT:
The Department of Transportation indicates this bill, as amended by the House, will have no fiscal impact on state, county and local revenue or expenditures.
METHODOLOGY:
The Department states this bill establishes the projects that will be included in the State's 10-year transportation program using anticipated federal and available state funds. This bill also extends the lapse date of the maintenance-critical repairs budget line to June 30, 2001, shifts the funding for the widening of NH 16, Newington-Dover project, from a turnpike project to a federal aid project, and establishes a committee to study the priority and funding of the projects included in the 10-year transportation plan.