CHAPTER 309

HB 2000-FN-LOCAL - FINAL VERSION

4may00.....4176h

5/18/00.....4540s

5/18/00.....4587s

31may00.....4655-CofC

2000 SESSION

00-2808

01/09

HOUSE BILL 2000-FN-LOCAL

AN ACT relative to a 10-year transportation plan, establishing a committee to study the transportation plan projects, relative to proposed toll booths in the city of Nashua, and relative to alternatives to the statewide toll booth system.

SPONSORS: Rep. E. Smith, Ches. 6

COMMITTEE: Public Works and Highways

AMENDED ANALYSIS

This bill:

I. Updates the 10-year transportation plan to maintain the highways and bridges in the state.

II. Adds a budget footnote to 1999, 159:1.

III. Establishes a committee to study the priority and funding of the projects included in the 10-year transportation plan.

IV. Eliminates proposed toll booths in Nashua.

V. Requires the commissioner of the department of transportation to create alternatives to the state's toll booth system.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Explanation: Matter added to current law appears in bold italics.

Matter removed from current law appears [in brackets and struckthrough.]

Matter which is either (a) all new or (b) repealed and reenacted appears in regular type.

4may00.....4176h

5/18/00.....4540s

5/18/00.....4587s

31may00.....4655-CofC

00-2808

01/09

STATE OF NEW HAMPSHIRE

In the Year of Our Lord Two Thousand

AN ACT relative to a 10-year transportation plan, establishing a committee to study the transportation plan projects, relative to proposed toll booths in the city of Nashua, and relative to alternatives to the statewide toll booth system.

Be it Enacted by the Senate and House of Representatives in General Court convened:

309:1 State 10-Year Transportation Plan. RSA 240 is repealed and reenacted to read as follows:

CHAPTER 240

STATE 10-YEAR TRANSPORTATION PLAN

240:1 Legislative Intent. This plan is predicated on the report submitted to the legislature by the governor dated January, 2000 and is intended to serve as the guideline for transportation projects in the state for the next decade.

240:2 Interstate Maintenance. Interstate maintenance projects shall be as follows:

ROUTE/ROAD PROJECT NAME/NUMBER DESCRIPTION/IMPROVEMENT

I. In federal fiscal year 2001:

(a) I-393 Concord - Cold plane and overlay with fabric and 3"

Pembroke pavement from N. Main Street to easterly end (5.0

13184 miles)

(b) I-293 Manchester From I-93 interchange west to the Merrimack

12110 River approx. 2.6 mi rehab and widen to 3 lanes in

each direction

(c) I-89 New London- Crack seal mainline and ramps from exit 11 to

Sunapee/Grantham exit 12A (New London-Sunapee 6 mi)

12882 and from exit 13 to exit 15 (Grantham 7 mi)

- FY 2001 statewide res/rec/cs program

(d) Various Statewide Pavement marking (annual project)

12223

(e) I-93 Thornton-Woodstock Pavement and bridge rehab from .16 mile south

13139 B of exit 29 through and including exit 30

II. In federal fiscal year 2002:

(a) I-93 Ashland-Plymouth Crack seal mainline and ramps from exit 24 N

to exit 26 - FY 2002 statewide res/rec/cs prog

(b) I-93 Plymouth-Campton - Pavement and bridge rehab from .1

Thornton mile north of exit 26 to .16 mile south

13139 A of exit 29

(c) Various Statewide Pavement marking (annual project)

12223

III. In federal fiscal year 2003:

(a) I-89 / I-93 Enfield / Tilton - Crack seal mainline and ramps I-89, from exit 15

Ashland N to 16, and I-93, from exit 20 N to exit 24 - FY

2003 statewide res/rec/cs prog

(b) I-89 Lebanon Weigh station rehabilitation

(c) I-89 Lebanon Reconstruction of the interchange & bridges

11700 @ exit 20, including approaches on NH 12A

(d) Various Statewide Pavement marking (annual project)

12223

IV. In federal fiscal year 2004:

(a) I-93 Salem-Manchester Widening from Mass S/L north 4.5 miles including

10418 exits 1 & 2 & Pelham Road including bridges

(b) I-89, I-93, Statewide Interstate crack seal (annual project)

I-95, I-293, 04M-ICS

I-393

(c) Various Statewide Pavement marking (annual project)

12223

(d) I-89 Sutton-New London Crack seal mainline and ramps from exit 8 N

to exit 9 - FY statewide res/rec/cs prog

V. In federal fiscal year 2005:

(a) I-93 Salem-Manchester Widening from exit 2 northerly to

10418 A exit 4 (NH 102)

(b) I-89, I-93, Statewide Interstate crack seal (annual project)

I-95, I-293, 04M-ICS

I-393

(c) Various Statewide Pavement marking (annual project)

12223

VI. In federal fiscal year 2006:

(a) I-93 Canterbury Overlay from north of exit 17 to exit

18 with 1" reinforced pavement (3.0 miles)

(b) I-89 Enfield-Lebanon 1" overlay from exit 17 to Vermont S/L

(6.5 miles) for safety, slip lining twin

66" pipes north of exit 17 and bridge joint rehab

(c) I-93 Salem-Manchester Widening from exit 2 northerly to

10418 A exit 4 (NH 102)

(d) I-89, I-93, Statewide Interstate crack seal (annual project)

I-95, I-293, 04M-ICS

I-393

(e) Various Statewide Pavement marking (annual project)

12223

(f) I-89 Warner Rehabilitation (3 miles) from exit 7 to exit 8

VII. In federal fiscal year 2007:

(a) I-93 Northfield Complete exit 19

(b) I-93 Salem-Manchester Widening from exit 2 northerly to

10418 A exit 4 (NH 102)

(c) I-93 Salem-Manchester Widening from exit 4 northerly to

10418 B I-293

(d) I-89, I-93, Statewide Interstate crack seal (annual project)

I-95, I-293, 04M-ICS

I-393

(e) Various Statewide Pavement marking (annual project)

12223

VIII. In federal fiscal year 2008:

(a) I-93 Bow - Concord Widen from I-89 to between exits 15

and 16 to match into existing project

(b) I-93 Derry/Londerry Construction of exit 4A - new interchange

13065 between existing exit 4 and exit 5 to

(1) relieve traffic congestion and (2) as access

to potential development of industrial land

(c) I-89 Enfield - Lebanon Rehab from exit 15 to exit 17 (4.0 miles)

(d) I-93 Salem - Manchester Widening from exit 4 northerly to I-293

10418 B

(e) I-89, I-93, Statewide Interstate crack seal (annual project)

I-95, I-293, 04M-ICS

I-393

(f) Various Statewide Pavement marking (annual project)

12223

IX. In federal fiscal year 2009:

(a) I-93 Bow - Concord Widen from I-89 to between exits 15

and 16 to match into existing project

(b) I-93 Lincoln Cold plane & overlay with fabric & 2" pavement

from US 3 bridge to Whitehouse bridge (6 miles)

if not overlayed

(c) I-89, I-93, Statewide Interstate crack seal (annual project)

I-95, I-293, 04M-ICS

I-393

(d) Various Statewide Pavement marking (annual project)

12223

X. In federal fiscal year 2010:

(a) I-93 Bow - Concord Widen from I-89 to between exits 15

and 16 to match into existing project

(b) I-89 Lebanon, NH - Widen & rehabilitation bridges over

Hartford, VT Connecticut River

(c) I-93 Littleton, NH - Reclaim & 3" overlay from north of

Waterford, VT exit 41 to Vermont S/L (9 miles)

(d) I-89, I-93, Statewide Interstate crack seal (annual project)

I-95, I-293, 04M-ICS

I-393

(e) Various Statewide Pavement marking (annual project)

12223

240:3 National Highway System. National highway system projects shall be as follows:

ROUTE/ROAD PROJECT NAME/NUMBER DESCRIPTION/IMPROVEMENT

I. In federal fiscal year 2001:

(a) US 302 & Conway Construction & roadway improvements from

NH 16 11339 H just south of US 302/NH 16 intersection to Zodiac

(Barnes) Way, including driveway consolidation

(b) NH 101/51 Exeter-Stratham- Landscape west of NH 108 to east of Guinea Road

Hampton (approx 1.2 mi) and east of Guinea Road to

12197 D east of I-95 (approx. 4.7 mi)

(c) NH 9 Hillsborough Construct bypass from east of NH 31 to west

10440 E interchange including Beards Brook Crossing and

Bible Hill Road and construct NH 31 intersection

(d) NH 101 Keene - Swanzey Reconstruct Optical Avenue & NH 32

10309 C

(e) US 3 Meredith Widen & signalize Parade Road intersection

11386

(f) Spaulding Rochester Construction of exit 11/12 bridges

Tpk 10620 D Phase 1 and 2nd barrel - phase 1

(g) Various Statewide Pavement marking (annual project)

12223

II. In federal fiscal year 2002:

(a) Airport Bedford-Manchester Improve access from F.E.E.T. to Manchester

Access Rd Londonderry Airport and surrounding area

11512

(b) NH 11 Claremont-Newport Reconstruction urban compact line

10433 to Kelleyville Bridge, approximately 3.8 miles

(c) US 302 Conway Construction & roadway improvements from just

& NH 16 11339 I north of Memorial Hospital to NH 16 in

Bartlett; signalize @ NH 16

(d) Various Statewide Pavement marking (annual project)

12223

(e) NH 16/ Newington - Dover Widen turnpike including Little Bay

US 4/ 11238 bridges from Gosling Road to Dover toll

Spldg Tpk

III. In federal fiscal year 2003:

(a) Airport Bedford-Manchester- Improve access from F.E.E.T. to

Access Rd Londonderry Manchester airport and surrounding

11512 area

(b) NH 16 Conway Conway bypass - construction of

11339 J southern segment

(c) NH 101 Keene - Swanzey Reconstruct "SPDI" EB & WB ramps

10309 D

(d) NH 101 Keene-Swanzey Reconstruct Main Street & NH 12/101

10309 E

(e) Spaulding Rochester Construction of exit 11/12, & 2nd

Tpk 10620 D phase 2 barrel to exit 13 - phase 2

(f) Spaulding Rochester Construction of 2nd barrel between

Tpk 10620 D phase 3 exit 13 to exit 14 - phase 3

(g) Various Statewide Pavement marking (annual project)

12223

(h) NH 111 Windham - Salem Construct bypass around Shadow Lake

10075

IV. In federal fiscal year 2004:

(a) NH 16 Conway Conway bypass - construction of

11339 J southern segment

(b) NH 16 Gorham Reconstruct from just north of

10438 Martins Location north 1.1 miles

(c) NH 101 Keene - Swanzey Reconstruction "SPDI" mainline &

10309 F Trumphet interchange

(d) Spaulding Rochester Construction of 2nd barrel between

Tpk 10620 D phase 4 exit 14 to exit 15 - phase 4

(e) Various Statewide Pavement marking (annual project)

12223

(f) NH 12 Troy Bypass of Troy Village

10434

V. In federal fiscal year 2005:

(a) NH 16 Conway Conway bypass - construction of

11339 K northern segment

(b) NH 16 Conway Conway bypass - landscape southern

11339 O segment

(c) NH 101 Keene - Swanzey Reconstruct West Street interchange

10309 G

(d) NH 16 Ossipee Reconstruction from NH 28 north 3.36 miles

10431

(e) Spaulding Rochester Construction of 2nd barrel between exit 15 to

Tpk 10620 D phase 5 exit 16 - phase 5

(f) NH 9 Roxbury - Sullivan Reconstruct from East Sullivan, south 2.04 mi

10439

(g) Various Statewide Pavement marking (annual project)

12223

(h) NH 12 Troy Bypass of Troy Village

10434

(i) NH 111 Windham - Salem Construct bypass around Shadow Lake

10075

VI. In federal fiscal year 2006:

(a) NH 16 Albany Reconstruction from just north of

10437 Madison T/L south 3.79 miles

(b) NH 16 Conway Conway bypass - construction of

11339 L central segment

(c) NH 16 Conway Conway bypass - landscape northern

11339 P segment

(d) NH 101 Keene - Swanzey Reconstruction "SPDI" mainline &

10309 F Trumphet interchange

(e) NH 25 / Moultonborough Reconstruct intersection and roadway from

NH 109 intersection of NH 109 north and roadway from

that intersection to school

(f) I-93 Salem - Manchester Widening from exit 2 northerly to

10418 A exit 4 (NH 102)

(g) Various Statewide Pavement marking (annual project)

12223

VII. In federal fiscal year 2007:

(a) NH 16 Conway Conway bypass - construction of US

11339 M 302 interchange

(b) NH 16 Conway Conway bypass - landscape central

11339 Q segment

(c) NH 12 Fitzwilliam Reconstruct intersection @ NH 119 for safety

improvement

(d) NH 101A Milford to Nashua Roadway improvements @ various

10136 locations to be identified by monitoring

(e) NH 16 & Ossipee Improvements in West Ossipee

NH 25

(f) NH 101 Peterborough Reconstruct intersection @ NH 123/Old Stage Rd

(g) US 2 Randolph Upgrade and reconstruct portions from Lowe's

westerly to the Jefferson town line

(h) I-93 Salem-Manchester Widening from exit 4 northerly to I-293

10418 B

(i) Various Statewide Pavement marking (annual project)

12223

VIII. In federal fiscal year 2008:

(a) US 302 Bath - Lisbon Reconstruction, from NH 112 north

10425 8.89 miles to Lisbon

(b) NH 106 Belmont - Laconia Reconstruct from 0.4 miles north of US 3 / NH 11

bypass southerly into Belmont south of Opechee

plaza

(c) NH 16 Conway Conway bypass - construction of NH 153

11339 N interchange

(d) US 2 Jefferson Safety and geometric improvements between

Randolph town line westerly to NH 115

intersection in Jefferson

(e) NH 101A Milford to Nashua Roadway improvements @ various

10136 locations to be identified by monitoring

(f) NH 16/25 Ossipee Reconstruct roadway and 4 bridges, beginning at

the Lovell River Bridge, running north 3.22 miles

to the Chocorua River - 152/268, 137/297, 137/299,

123/324

(g) Various Statewide Pavement marking (annual project)

12223

IX. In federal fiscal year 2009:

(a) US 302 Bath - Lisbon Reconstruction, from NH 112 north

10425 8.89 miles to Lisbon

(b) US 3 Laconia - Meredith Rehabilitate & add shoulders (3.7 mi)

(c) NH 25 Moultonborough Reconstruction from Moultonborough Neck Road

easterly 3.5 miles to NH 109 south

(d) NH 16 / Newington - Dover Widen turnpike including Little Bay bridges from

US 4 / 11238 Gosling Road to Dover toll

Spldg Tpk

(e) NH 125 Plaistow Widening for center turn lane from the

Massachusetts S/L to Westville Bridge

(f) Various Statewide Pavement marking (annual project)

12223

(g) NH 101 Wilton - Milford - Safety improvements @ various locations from

Amherst - Bedford Wilton to Wallace Rd in Bedford

X. In federal fiscal year 2010:

(a) US 302 Harts Location Rehabilitate & upgrade from Carroll/Harts

Location T/L easterly approx. 1.5 miles

(b) Fee Tpk Manchester Reconstruct interchange at exit 7 to become full

interchange

(c) NH 16/ Newington - Dover Widen turnpike including Little Bay

US 4/ 11238 bridges from Gosling Road to Dover toll

Spldg Tpk

(d) Various Statewide Pavement marking (annual project)

12223

240:4 Bridge Replacement On-System. Bridge replacement on-system projects shall be as follows:

ROUTE/ROAD PROJECT NAME/NUMBER DESCRIPTION/IMPROVEMENT

I. In federal fiscal year 2001:

(a) NH 28 Auburn Replace bridge over Massabesic Lake -070/102

Bypass 12596

(b) NH 9 Chesterfield, NH - Replace Chesterfield Bridge over

Brattleboro, VT Connecticut River - 040/095 (present#)

11999

(c) NH 135 Haverhill - Bath Rehabilitation of Woodsville covered

13095 bridge (072/063) - [98-74TE]

II. In federal fiscal year 2002:

(a) US 4 Canaan Replace bridge over Mascoma River -

12870 137/061

(b) NH 25 Effingham - Freedom Replace bridge over Ossipee River -

12362 136/183

(c) US 302 Haverhill, NH - Rehab bridge over Connecticut River

Newbury, VT - 219/178

12363

(d) NH 25 Ossipee Replace bridge over Bear Camp River -

12773 114/329 and reconstruct approaches

(e) NH 32 Swanzey Replace bridge over Ashuelot River -

12775 146/129

III. In federal fiscal year 2003:

(a) NH 26 Colebrook Replace bridge over Balsam Pond outlet

13255 - 202/059 and over Mohawk River, 0.5 mile from

Dixville T/L - 201/062

(b) NH 26 Colebrook Replace bridge over Mohawk River -

13256 177/068, 3 mi from Dixville T/L

(c) NH 119 Hinsdale, NH - Replace 2 bridges over Connecticut

Brattleboro, VT River - 041/040 & 042/044

12210

(d) NH 155 Madbury Replace bridge over B & M RR -

12922 114/084

(e) Kingston Plaistow Replace bridge over B & M RR - 137/115

Road 10005

(f) NH 121 Plaistow Replace bridge over Little River &

12359 B&M RR - 105/028

(g) NH 33 Portsmouth Replace bridge over B & M RR - 154/101

(Old NH101) 10665

(h) NH 28 Wolfeboro Replace bridge over Smith River -

12358 112/110

IV. In federal fiscal year 2004:

(a) US 3 Allenstown Replace bridge over Local Road &

12361 Suncook River - 069/056

(b) US 4 Boscawen - Bridge widen(shoulders) and rehabilitation

Canterbury over Merrimack River - 142/038

13029

(c) NH 25 Warren Replace bridge over Baker River -

11847 109/048

V. In federal fiscal year 2005:

(a) US 302 Bartlett Replace bridge over MCRR - 188/123 &

13043 over Saco River - 189/129

(b) NH 26 Colebrook Bridge rehabilitation over Mohawk River -

147/068

(c) Sewalls Concord Replace bridge over Merrimack River

Falls Road 12004 - 070/117

VI. In federal fiscal year 2006:

(a) US 1 Portsmouth Rehab bridge @ Maplewood Ave over

bypass 12900 US 1 bypass - 227/112

(b) US 1 Portsmouth Rehab bridge @ Stark Street over US 1

bypass 12902 bypass - 211/114

(c) NH 1A Rye Replace bridge over Seavey's Creek -

13269 252/156

(d) NH 12 Walpole Bridge rehabilitation over Cold River

12904 - 082/065

(e) Bridge St Walpole, NH - Bridge rehabilitation over

Bellows Falls, VT Connecticut River - 062/052

12905

VII. In federal fiscal year 2007:

(a) US 4/ Lebanon Bridge replacement over Mascoma River

NHRR - 188/126 near intersection of US 4 and NH 4A

VIII. In federal fiscal year 2008:

(a) NH 10 Winchester Bridge replacement over Ashuelot River

12906 - 152/181

IX. In federal fiscal year 2009:

(a) US 4 Lebanon, NH - Rehabilitate and widen bridge over

Hartford, VT Connecticut River - 058/127

(b) NH 123 New Ipswich Replace bridge over Souhegan River -

/124 157/093

X. In federal fiscal year 2010:

(a) US 1 Portsmouth, NH - Rehabilitate and paint bridge over Kittery, ME

Piscataqua River - 247/084 (Memorial Bridge)

240:5 Bridge Replacement Off-System. Bridge replacement off-system (state) projects shall be as follows:

ROUTE/ROAD PROJECT NAME/NUMBER DESCRIPTION/IMPROVEMENT

I. In federal fiscal year 2001:

(a) Shaker Enfield Replace bridge over Mascoma River -

Hill Road 10652 083/156

(b) Staniels Loudon Near the intersection of NH 106, relocation and

Road 13207 bridge replacement - 044/048

II. In federal fiscal year 2002:

(a) NH 87 Epping Replace bridge over Lamprey River -

13057 151/069

(b) Barnet Monroe, NH - Rehab bridge over the Connecticut River

Road Barnet, VT 10648 - 110/125

(c) Main St Pembroke Replace bridge over Suncook River -

12978 203/088

III. In federal fiscal year 2003:

(a) South Enfield Replace bridge over Mascoma Lake -

Main St 12967 077/139

(b) NH 175A Holderness-Plymouth Replace bridge (Bridge St) over Pemi River

11849 - 046/139 & approaches

IV. In federal fiscal year 2004:

(a) NH 145 Clarksville Replace bridge over Connecticut River

13028 - 090/120

240:6 Safety Projects. Safety projects shall be as follows:

ROUTE/ROAD PROJECT NAME/NUMBER DESCRIPTION/IMPROVEMENT

I. In federal fiscal year 2002:

(a) US 4 Northwood Sight distance safety improvements @

11143 contract 2 Bow Lake Road intersection

II. In federal fiscal year 2003:

(a) US 4 Northwood - Intersection safety improvement @ NH 152

Nottingham

10429 E

III. In federal fiscal year 2005:

(a) NH 63 Chesterfield Reconstruct to improve safety

adjacent to Spofford Lake

IV. In federal fiscal year 2006:

(a) US 4 Nottingham Safety improvements eastbound passing lane

11140

V. In federal fiscal year 2008:

(a) NH 3A Bow to Manchester Safety improvements, including shoulder

widenings & intersection improvements @ various

locations

VI. In federal fiscal year 2009:

(a) US 3 Woodstock Safety and pavement improvements to

upgrade US 3

240:7 Any Area Projects. Any area projects shall be as follows:

ROUTE/ROAD PROJECT NAME/NUMBER DESCRIPTION/IMPROVEMENT

I. In federal fiscal year 2001:

(a) NH 28 Alton Widen shoulders, reclaim and 3" overlay from

12894 traffic circle north (2.0 mi) - FY 2001 statewide

res/rec/cs prog

(b) NH 114 Bradford-Henniker Level and 1" overlay from NH 103 intersection to

12892 US 202 (6.3 mi) - FY 2001 statewide res/rec/cs prog

(c) NH 11 Farmington/ Alton - Widen shoulders, level and 1" overlay

Rochester (Farmington 1.0 mi), upgrade guardrail

13293 (Alton-Rochester 14 mi) - FY 2001 statewide

res/rec/cs prog

(d) NH 116 Littleton-Bethlehem Reclaim & 3" overlay from Sampson Road east to

12873 west of Wing Road (3.77 mi) - FY 2001 statewide

res/rec/cs prog

(e) US 4, Northwood-Nottghm Level and 1" overlay US 4 (Northwood-Nottingham

NH 33, Grnlnd-Strathm/ 3.39 mi), NH 33 (Greenland-Stratham 2.92 mi),

NH 111, Seabrk/ Hampstead NH 286 (Seabrook 2.36 mi), NH 111 (Hampstead

NH 286 12888 0.45 mi) - FY 2001 statewide res/rec/cs prog

(f) NH 38 Pelham Reclaim & 3" overlay (1.5 mi) and level & 1"

12867 overlay (1.52 mi), from Mass. S/L north 3.02 mi. -

FY 2001 statewide res/rec/cs prog

(g) NH 3A Plymouth Rubblize & 3" overlay from S. of the traffic circle

12884 south (1.3 mi) - FY 2001 statewide res/rec/cs prog

(h) Various Statewide Update signing on state system

(i) Various Summer Youth Establishment of summer landscaping youth

Landscape Program program to perform maintenance & other related

12500 work statewide

(j) NH 12 Walpole Level and 1" overlay, from Church Street to

12895 1.6 mi south of NH 123 (3.3 mi) - FY 2001

statewide res/rec/cs prog

(k) NH 101 Wilton - Milford Recl. & 3" overlay (1.0 mi) & level & 1" overlay

13292 (2.0 mi) from NH 31 south E. to RR crossing - FY

2001 statewide res/rec/cs prog

II. In federal fiscal year 2002:

(a) NH 28 Alton Widen shoulders and reclaim and 3" overlay from

2.0 mi n. of Alton traffic circle to NH 28A-FY 2002

statewide res/rec/cs program

(b) US 3 Bethlehem - Carroll Level and 2" overlay from Gale River proj. E. to

12883 Ammonoosuc River (5.14 mi) - FY 2002 statewide

res/rec/cs prog

(c) NH 112 Lincoln Widen shoulders for bicycles and level and 1"

overlay from Pollard Br. E. to E. Br. Pemi. River

(3.58 mi) - FY 2002 statewide res/rec/cs prog

(d) NH 12, Marlborough-Troy/ Level and 1" overlay NH 12 (Marlborough- Troy

NH 123, Sharon-New Ipswich 2.95 mi), NH 123/124 (Sharon-New Ipswich 4.3

mi)

NH 124 - FY 2002 statewide res/rec/cs prog

(e) NH 101A Milford - Merrimack Replace TW pave, 1" overlay full width from W. of

12887 NH 101 intersection E. to Nashua T/L (4.0 mi) -

FY 2002 statewide res/rec/cs prog

(f) Broad St Nashua Construction from Nashua River westerly to

Parkway 10040 H Broad Street (to subgrade only) including Baldwin

Street ped bridge

(g) Broad St Nashua Construction from West Hollis Street to Pine

Parkway 10040J Street extension including bridge over canal

(h) Broad St Nashua base courses, wearing courses, signing,

Parkway 10040K markings, RR X-ing, and signals

(i) US 4, Nottingham - Level and 1" overlay US 4 (Nottingham-Lee

NH 125 Lee NH 125 (Lee 4.0 mi) - res/rec/cs prog

12897

(j) Various Statewide Update signing on state system

(k) Various Summer Youth Establishment of summer landscaping youth

Landscape Program program to perform maintenance & other

12500 related work statewide

III. In federal fiscal year 2003:

(a) NH 28 Alton Reclaim & 3" overlay from NH 28A N to

Wolfeboro T/L (4.1 mi) - FY 2003 statewide

res/rec/cs prog

(b) US 1 Hampton Falls - Level and 1" overlay from Seabrook

N. Hampton N to compact (Hampton Falls-Hampton 2.4 mi),

from compact to Juniper Ln (Hampton-N.

Hampton 2.4 mi) - FY 2003 statewide res/rec/cs

prog

(c) NH 9, Keene / Rubbilize and 3" overlay NH 101, from Branch

NH 101 Hillsborough - Rd E. to T/L (Keene 1.1 mi) and reclaim and 3"

Antrim overlay NH 9, from end of bypass W. to NH 31 S

(Hillsborough - Antrim 3.5 mi) - FY 2003

statewide res/rec/cs prog

(d) NH 112 Lincoln Level and 1" overlay from E. br. Pemi. River E. to

Hancock Brook Bridge (4.47 mi) - FY 2003

statewide res/rec/cs prog

(e) US 3 Merrimack - Level and 1" overlay from Bedford Rd. N. to S. of

Bedford NH 101 (5.11 mi) - FY 2003 statewide res/rec/cs

prog

(f) Broad Nashua Project wide landscaping

Street 10040L

Parkway

(g) NH 110, Northumberland / Reclaim & 3" overlay NH 110, from US 3

US 2 Lancaster E. to RR overpass (Northumberland 1 mi),

reclaim and 3" overlay US 2, from US 3

easterly (Lancaster 1.33 mi) - FY 2003

statewide res/rec/cs prog

(h) Various Statewide Update signing on state system

(i) Various Summer Youth Establishment of summer landscaping

Landscape Program youth program to perform maintenance

12500 & other related work statewide

(j) NH 25 Wentworth - Reclaim & 3" overlay from NH 118 S. to

Warren Turner Rd. (6.3 mi) - FY 2003 statewide

res/rec/cs prog

(k) NH 111 Windham - Salem Construct bypass around Shadow Lake

10075

IV. In federal fiscal year 2004:

(a) NH 9 Antrim - Stoddard Reclaim and 3" overlay from NH 31 SW.

to 1995 fed. resurf. (6 mi) - FY 2004

statewide res/rec/cs prog

(b) NH 114 Bedford - Goffstown Level and 1" overlay from NH 101 N. to

NH 114A (3.28 mi) - FY 2004 statewide

res/rec/cs prog

(c) NH 10, Claremont/ Rubbilize and 3" overlay NH 103, from S/L E. to

NH 103 Newport- Redwater Br. (Claremont 1.4 mi) and level and

Croydon 1" overlay NH 10, from NH 11 N. to Croydon

Flats (Newport-Croydon 3.8 mi) - FY 2004

statewide res/rec/cs prog

(d) NH 124 Greenville - Reconstruct from Mascenic Regional

New Ipswich School southerly - 1.4 miles

S3168

(e) NH 101 Hampton / Level and 1" overlay from Towle Farm Rd E. to E.

Portsmouth of US 1 byp (Hampton 1.5 mi) and from traffic

circle E. to Channel Plaza (Portsmouth 2 mi)

- FY 2004 statewide res/rec/cs prog

(f) NH 112 Lincoln Reclaim and 3" overlay from Hancock Brook

Bridge E. to Livermore T/L (3.76 mi) -

FY 2004 statewide res/rec/cs prog

(g) NH 25 Ossipee - Level and 1" overlay from NH 16/25 E. to 12362

Effingham project (6.34 mi) - FY 2004 statewide res/rec/cs

prog

(h) I-93 Salem - Widening from mass S/L north 4.5 miles including

Manchester Exit 1 & 2 & Pelham Road including bridges

10418

(i) Various Statewide Update signing on state system

(j) Various Summer Youth Establishment of summer landscaping youth

Landscape program to perform maintenance & other related

Program work statewide

12500

(k) NH 111 Windham - Salem Construct bypass around Shadow Lake

10075

(l) NH 111/ Windham - Salem Reconstruction @ Lake Street

NH 28 10075B

V. In federal fiscal year 2005:

(a) NH 10 Croydon - Level and 1" overlay from Croydon Flats N to

Grantham N of I-89 (7.13 mi) - FY 2005 statewide res/rec/cs

prog

(b) NH 26, Dixville- Reclaim and 3" overlay NH 26, from Dix./Mills.

T/L

NH 110 Errol/Milan E. to1 mi E. of Err./Mills. T/L (Dixville-Errol

2.79 mi) and level and 1" overlay NH 110, from

Berlin T/L N. to end of 1995 recl proj. (Milan

3.06 mi) -FY 2005 statewide res/rec/cs prog

(c) US 4, Epsom-Northwood/N. Level and 1" overlay US 4, from NH 107 E. to

US 1, Hampton/Lee- Ridge Rd (Epsom-Northwood NH 125 3.8 mi), US

NH 125 Barrington 1, from Juniper Ln N. to Rye T/L (N. Hampton

1 mi), NH 125, from traffic circle to S of NH 9

(Lee-Barrington 3.7 mi) - FY 2005 statewide

res/rec/cs prog

(d) NH 102 Hudson - Level and 1" overlay from NH 3A E. to Buttrick

Rd

Londonderry (6.24 mi) - FY 2005 statewide res/rec/cs prog

(e) NH 12 Keene - Surry Level and 1" overlay from 1994 fed res. N. to

Westmoreland T/L (5 mi) - FY 2005 statewide

res/rec/cs prog

(f) NH 125 Plaistow - Reconstruction from East Road in Plaistow

Kingston northerly approx. 6.0 +/- mile to NH 125 & Main

10044B Street intersection in Kingston, including the

intersection of NH 125 with Newton

Junction/Hunt Rd

(g) Various Statewide Update signing on state system

(h) Various Summer Youth Establishment of summer landscaping youth

Landscape Program program to perform maintenance & other related

12500 work statewide

(i) US 3 Tilton - Rubbilize and 3" overlay from E. of outlet mall E.

Sanbornton to Mesquito Br. (4 mi.) - FY 2005 statewide

res/rec/cs prog

VI. In federal fiscal year 2006:

(a) Various Statewide Update signing on state system

(b) Various Statewide Pavement resurfacing, rehabilitation &

33D-PRR crack seal program (annual project)

(c) Various Summer Youth Establishment of summer landscaping youth

Landscape Program program to perform maintenance & other

12500 related work statewide

VII. In federal fiscal year 2007:

(a) US 4 Andover Reconstruct approximately 2.0 miles

from Salisbury T/L westerly

(b) Various Statewide Update signing on state system

(c) Various Statewide Pavement resurfacing, rehabilitation

33D-PRR & crack seal program (annual project)

(d) Various Summer Youth Establishment of summer landscaping

Landscape Program youth program to perform maintenance

12500 & other related work statewide

VIII. In federal fiscal year 2008:

(a) US 302 Lisbon Rehabilitate, beginning 1100 ft north of Perch

Pond Road northerly 4 miles

(b) Various Statewide Update signing on state system

(c) Various Statewide Pavement resurfacing, rehabilitation & crack seal

33D-PRR program (annual project)

(d) Various Summer Youth Establishment of summer landscaping youth

Landscape Program program to perform maintenance & other

12500 related work statewide

(e) NH 111 Windham - Salem Reconstruction & signalization @ North

10075A Policy Road

IX. In federal fiscal year 2009:

(a) Various Statewide Update signing on state system

(b) Various Statewide Pavement resurfacing, rehabilitation & crack seal

33D-PRR program (annual project)

(c) Various Summer Youth Establishment of summer landscaping youth

Landscape Program program to perform maintenance & other

12500 related work statewide

X. In federal fiscal year 2010:

(a) Various Statewide Update signing on state system

(b) Various Statewide Pavement resurfacing, rehabilitation & crack seal

33D-PRR program (annual project)

(c) Various Summer Youth Establishment of summer landscaping youth

Landscape Program program to perform maintenance & other related

12500 work statewide

240:8 Non-Urban Areas. Non-Urban Areas projects shall be as follows:

ROUTE/ROAD PROJECT NAME/NUMBER DESCRIPTION/IMPROVEMENT

I. In federal fiscal year 2001:

(a) NH 112 Easton - Begin @ NH 116, roadway and safety

Woodstock improvements for 3.2 miles east,

12971 including reconstruction of 1.0 mile

to improve the alignment, drainage, & roadbase.

(b) NH 9 Hillsborough Construct bypass from east of NH 31

10440E to west interchange including

Beards Brook Crossing and Bible Hill

Road and construct NH 31 intersection

(c) Staniels Loudon Near the intersection of NH 106,

Road 13207 relocation and bridge replacement - 044/048

(d) Various Statewide Pavement marking (annual project)

12223

II. In federal fiscal year 2002:

(a) NH 103 Newbury - Level and 1" overlay from traffic

Bradford circle to Sutton T/L (10.4 mi) - FY 2002

12893 statewide res/rec/cs prog

(b) Various Statewide Pavement marking (annual project)

12223

(c) US 3 Whitefield Reconstruct from Carroll T/L north

P2953 2.1 miles

III. In federal fiscal year 2003:

(a) Various Statewide Pavement marking (annual project)

12223

IV. In federal fiscal year 2004:

(a) NH 124 Greenville - Reconstruct from Mascenic Regional

New Ipswich School southerly - 1.4 miles

S3168

(b) Various Statewide Pavement marking (annual project)

12223

V. In federal fiscal year 2005:

(a) Various Statewide Pavement marking (annual project)

12223

VI. In federal fiscal year 2006:

(a) Various Statewide Pavement marking (annual project)

12223

VII. In federal fiscal year 2007:

(a) NH 12 Charlestown Reconstruction from NH 12A to Walpole T/L

including removal of concrete underbase,

widen/pave shoulders along this corridor, and

upgrade of storm drainage system

(b) Albuquer Litchfield Construct .3 mile segment from April

-que Drive to NH 3A, including intersection

Ave improvements @ NH 3A

(c) NH 25 Meredith Reconstruction from Center Harbor

10430 T/L south 3.24 miles to US 3

(d) Various Statewide Pavement marking (annual project)

12223

(e) NH 28 Wolfeboro Improve roadway, intersections, and

drainage from the Alton T/L to Wolfeboro Falls

VIII. In federal fiscal year 2008:

(a) Various Statewide Pavement marking (annual project)

12223

IX. In federal fiscal year 2009:

(a) Various Statewide Pavement marking (annual project)

12223

(b) US 3 Stratford Reconstruction & widening from end

of betterment project northerly 6.0

miles

X. In federal fiscal year 2010:

(a) NH 16 Dummer - Widen & rehabilitate from Errol southerly

Cambridge 10 miles

Errol

(b) Various Statewide Pavement marking (annual project)

12223

(c) NH 10 Winchester Reconstruct/rehabilitate from Mass

S/L to NH 119 (Manning Hill) 5.1 miles

240:9 State Project;. Urban Areas Less Than 200,000. State projects in urban areas with a

population less than 200,000 shall be as follows:

ROUTE/ROAD PROJECT NAME/ NUMBER DESCRIPTION/IMPROVEMENT

I. In federal fiscal year 2001:

(a) US 3 Bedford Landscaping for intersection

12317 improvement @ Back River Road

Contract 2

(b) US 3 / Belmont Add left turn lanes & new signal @

NH 11 12620 Union Road (US 3 corridor improvements)

(c) Various Statewide Pavement marking (annual project)

12223

II. In federal fiscal year 2002:

(a) NH 101 Bedford Construct WB-on & WB-off ramps

10018C from NH 101 to Kilton Road & bridge

Contract 1 replacement

(b) NH 101 Keene - Swanzey Reconstruct Winchester Street

10309B

(c) NH 101 Manchester - Rehab from I-93 East to Severence Brook

Auburn

12609

(d) US 202 Peterborough Reconstruction of 2 miles from

12915 Southfield Lane to Hancock T/L

(e) NH 1B Portsmouth Reconstruction of New Castle Ave (NH 1B)

from Marcy Street to bridge over

Piscataqua River inlet

(f) Various Statewide Pavement marking (annual project)

12223

III. In federal fiscal year 2003:

(a) US 3 Bedford Landscaping Kilton Road, US 3, berm

10018C Along NH 101 on ramp, drainage basins

Contract 2

(b) NH Milford to Nashua Roadway improvements @ various

101A 10136 locations to be identified by monitoring

(c) Various Statewide Pavement marking (annual project)

12223

IV. In federal fiscal year 2004:

(a) US 302 Bath - Lisbon Reconstruction, from NH 112 north

10425 8.89 miles to Lisbon

(b) US 3 / Belmont Add turn lanes, & new signals in

NH 11 12916 vicinity of the Belknap Mall (US 3

corridor improvements)

(c) US 302 Haverhill Reconstruction from junction @ NH

10436 10 northerly approximately 1 mile

(d) Monument Hollis Reconstruction of Monument Square

Square area to provide separated one-way

segments

(e) NH 130 Hollis Reconstruct intersection @ Broad

(Ash Street) Street

(f) Various Statewide Pavement marking (annual project)

12223

V. In federal fiscal year 2005:

(a) US 3 Northumberland Reconstruction, south from

12990 Stratford T/L, 1.4 miles

(b) Various Statewide Pavement marking (annual project)

12223

(c) US 3 / Tilton Relocate Clark Road & Town Plaza

NH 11 entrance, geometric improvements, &

new signal (US 3 corridor improvements)

VI. In federal fiscal year 2006:

(a) NH 11 Alton - Gilford Reconstruction near Ellocoya State

10606 Park southeast 4.75 miles to Minge

Brook

(b) NH 140 Belmont Bypass study and construct bypass

12792 of Belmont Village from Tilton to NH 106

(c) NH 26 Colebrook Reconstruct from 3 miles west of

P2493C Dixville T/L easterly 2.5 miles

(d) NH 101 Keene Reconstruct from Branch Road west

13251 0.9 miles

(e) NH 101A Milford to Nashua Roadway improvements @ various

10136 locations to be identified by monitoring

(f) US 1 Portsmouth Reconstruct from Sagamore Creek project

Bypass to traffic circle, including bridges

173/071, 183/087, 188/097, 188/100, 192/106

(g) Various Statewide Pavement marking (annual project)

12223

VII. In federal fiscal year 2007:

(a) US 302 Bath - Lisbon Reconstruction, from NH 112 north

10425 8.89 miles to Lisbon

(b) NH 101 Bedford Widen to 5 lanes for approximately 2

miles, from Constitution Drive to Wallace Road,

including appropriate pedestrian facilities

(c) US 4 Boscawen Reconstruct intersection @ Goodhue Road and

Raymond Road

(d) NH 125 Epping Reconstruction from Brentwood T/L

to NH 87

(e) NH 25 Meredith Reconstruction from Center Harbor

10430 T/L south 3.24 miles to US 3

(f) US 1 Portsmouth Intersection @ Constitution Ave and

roadway improvements

(g) Various Statewide Pavement marking (annual project)

12223

VIII. In federal fiscal year 2008:

(a) US 202 Peterborough Reconstruct from NH 101 northerly

2.5 miles

(b) Various Statewide Pavement marking (annual project)

12223

IX. In federal fiscal year 2009:

(a) US 302 Bath - Lisbon Reconstruction, from NH 112 north

10425 8.89 miles to Lisbon

(b) NH 102 Hudson West Road intersection: widen for

turn lanes, signals, & truck lane

(c) NH 10 Newport - Goshen - Reconstruct/rehabilitate from

Lempster - Marlow Newport to NH 123A in Marlow (15 mi)

(d) Various Statewide Pavement marking (annual project)

12223

X. In federal fiscal year 2010:

(a) NH 28 Barnstead - Alton Reconstruction from end of improved section in

Barnstead to Alton traffic circle

(b) NH 33 Greenland Intersection improvements @ Ocean Road, adding

additional turning and through lanes

(c) Various Statewide Pavement marking (annual project)

12223

240:10 Turnpike. Turnpike projects shall be as follows:

ROUTE/ROAD PROJECT NAME/NUMBER DESCRIPTION/IMPROVEMENT

I. In federal fiscal year 2001:

(a) Circum- Litchfield - Nashua Construct northern river crossing

ferential 10625 H over Merrimack River, 2 bridges - phase 1

Hwy

II. In federal fiscal year 2002:

(a) Spaulding Dover - Rochester - Construction of exit 10 and easterly

Tpk Somersworth connection

11429 A

(b) Circum- Merrimack - Nashua Construct bridges (4), mainline &

ferential 10625 I ramps over Pennichuck Brook - phase 1

Hwy

III. In federal fiscal year 2003:

(a) Spldg Tpk Dover - Rochester - Construction of exit 10 and easterly

Somersworth connection

11429 A

(b) Circum- Hudson Mitigation - Benson's - phases 1, 2, & 3

ferential 10625 O

Hwy

(c) Circum- Litchfield - Hudson Construct mainline, ramps, toll

ferential 10625 K booth, NH 3A improvements, boat ramp

Hwy access road - phase 1

(d) FEE Tpk Manchester Construction of Granite Street

10622 interchange

(e) Circum- Merrimack Construct mainline, US 3 to exit 9 &

ferential 10625 N bridges (2) - phase 1

Hwy

(f) Circum- Merrimack - Nashua Construct for NHCH & FEE Tpk:

ferential 10625 M mainline, ramps, & bridges (5) @ exit 9

Hwy interchange - phase 1

(g) Circum- Nashua - Merrimack Construct mainline, ramps, US 3

ferential 10625 L roadway improvements & bridges (2) -

Hwy phase 1

IV. In federal fiscal year 2004:

(a) Spldg Tpk Dover - Rochester - Construction of exit 10 and easterly

Somersworth connection

11429 A

(b) Circum- Hudson Mitigation - Benson's - phases 1, 2, & 3

ferential 10625 O

Hwy

(c) FEE Manchester Construction of Granite Street

Tpk 10622 interchange

V. In federal fiscal year 2005:

(a) Circum- Hudson Mitigation - Benson's - phases 1, 2, & 3

ferential 10625 O

Hwy

(b) Circum- Hudson Construct bridges (5), Old Derry

ferential 10625 Q Road, Barrett's Hill Road, Glover

Hwy Brook - phase 3

(c) Circum- Litchfield - Hudson Construct mainline & ramps from NH

ferential 10625 P 3A to NH 102 - phase 2

Hwy

VI. In federal fiscal year 2006:

(a) Circum- Hudson Mitigation - Benson's - phases 1, 2, & 3

ferential 10625 O

Hwy

(b) Circum- Hudson Construct mainline & ramps, NH 102 to

ferential 10625 R NH 111, & roadway @ NH 111 - phase 3

Hwy

309:2 Budget Footnote Added. Amend 1999, 159:1.04, 01, 01, 01 as follows:

Strike out: FY 2000 FY 2000

92 Maintenance - critical repairs 425,000 425,000

Insert in place thereof:

92 Maintenance - critical repairs F 425,000 425,000

309:3 Committee Established. There is established a committee to study the priority and funding of projects included in the 10-year transportation plan, established under RSA 240.

309:4 Membership and Compensation.

I. The members of the committee shall be as follows:

(a) Four members of the house of representatives, including a member of the house public works and highway committee and a member of the house finance committee, appointed by the speaker of the house.

(b) Four members of the senate, appointed by the president of the senate.

II. The committee shall solicit information from the commissioner of the department of transportation and from any other relevant source.

III. Members of the committee shall receive mileage at the legislative rate when attending to the duties of the committee.

309:5 Duties. The committee shall study the priority and funding of projects included in the 10-year transportation plan, established under RSA 240. The committee's study shall also include the policy of using federal funds for turnpike projects.

309:6 Chairperson; Quorum. The members of the study committee shall elect a chairperson from among the members. The first meeting of the committee shall be called by the first-named house member. The first meeting of the committee shall be held within 45 days of the effective date of this section. Five members of the committee shall constitute a quorum.

309:7 Report. The committee shall report its findings and any recommendations for proposed legislation to the speaker of the house of representatives, the senate president, the house clerk, the senate clerk, the governor, and the state library on or before November 1, 2000.

309:8 Statement of Intent. The general court recognizes that building additional toll booths create safety concerns and pollution issues. The general court also recognizes that more toll booths detract from the New Hampshire scenery and negatively impact the New Hampshire tourism industry.

309:9 Proposed Toll Booths Eliminated. The department of transportation shall eliminate the proposed toll booths for the city of Nashua.

309:10 Alternatives to Toll Booth System Required; Department of Transportation. The commissioner of the department of transportation shall recommend alternatives to the statewide toll booth system. The commissioner shall submit a report on or before November 1, 2000 with recommendations for legislation to the senate president, the speaker of the house, the chairpersons of the senate and house transportation committees, and the governor.

309:11 Proposed Toll Booth. Amend RSA 237:2, VII to read as follows:

VII. Acquire land as required and make improvements to the central New Hampshire turnpike including, but not limited to, completing the connection to the Merrimack industrial interchange, relocation of Camp Sargent Road, improvements to interchanges 3 through 7 as required, the extension of the system to include an easterly circumferential beltway around Nashua extending from exit 2 and running easterly through the city of Nashua and the towns of Hudson, Litchfield, and Merrimack to an intersection with the existing turnpike, improvements and widening between interchanges 2 and 7, widening between the Route 101 intersection and the Amoskeag interchange in Manchester, and coordinating a study of widening between the I-89 and I-93 interchanges[, and the establishment of a toll station southbound in the vicinity of Nashua and the Massachusetts state line].

309:12 Effective Date.

I. Section 1 of this act shall take effect 60 days after its passage.

II. The remainder of this act shall take effect upon its passage.

(Approved: June 21, 2000)

(Effective Date: I. Section 1 shall take effect August 20, 2000

II. Remainder shall take effect June 21, 2000)

LBAO

00-2808

Amended 5/16/00

HB 2000 FISCAL NOTE

AN ACT relative to a 10-year transportation plan and establishing a committee to study the transportation plan projects.

FISCAL IMPACT:

The Department of Transportation indicates this bill, as amended by the House, will have no fiscal impact on state, county and local revenue or expenditures.

METHODOLOGY:

The Department states this bill establishes the projects that will be included in the State's 10-year transportation program using anticipated federal and available state funds. This bill also extends the lapse date of the maintenance-critical repairs budget line to June 30, 2001, shifts the funding for the widening of NH 16, Newington-Dover project, from a turnpike project to a federal aid project, and establishes a committee to study the priority and funding of the projects included in the 10-year transportation plan.