NH General Court
New Query
 FAQs
General Court of New Hampshire - Bill Status System
Previous Bill Result List Next Bill
Bill Status
Bill Text
SOS Archives!
  Senate History
  Docket of SB73  Docket Abbreviations
Bill Title: requiring the public utilities commission to quantify and consider environmental and socioeconomic costs in state energy plans of electric utilities.

Official Docket of
SB73.:
Date Body Description
1/17/2019S Introduced 01/03/2019 and Referred to Energy and Natural Resources; SJ 4
2/14/2019S Hearing: 02/19/2019, Room 103, SH, 09:30 am; SC 11
3/21/2019SCommittee Report: Rereferred to Committee, 03/27/2019; Vote 5-0; CC; SC 15
3/27/2019SRereferred to Committee, MA, VV; 03/27/2019; SJ 10
1/9/2020SSpecial Order to the end of the Regular Calendar, Without Objection, MA; 01/08/2020; SJ 1
11/20/2019SCommittee Report: Referred to Interim Study, 01/08/2020; SC 47
1/8/2020SRefer to Interim Study, MA, VV; 01/08/2020; SJ 1
Previous Bill Result List Next Bill